Biogas for wastewater treatment plants

A sewage works already makes biogas in the sludge digester. The owner decides what to do with it: flare, run a CHP unit for the plant’s own power and heat, or upgrade it to biomethane. Often the plant uses most of the heat itself for digester heating and sludge drying.

The gas stream is already there, so the model treats it as a gas stream, not as an invented feedstock. In our model the German case that uses existing gas is a strong candidate, because new investment is limited to the engine or the upgrading unit.

What drives payback

Gas already produced

No new digester is needed, so CAPEX is limited to the use of gas. This is why paybacks are shorter.

Own power and heat

A sewage works uses much electricity for aeration. Self-generation replaces expensive purchased power.

Upgrading to biomethane

Possible if a gas grid is close and the flow is large enough. Otherwise CHP is the lower-risk option.

Sludge strategy

Rules on drying, incineration or agricultural use of sludge change the cost of sludge management.

What it takes to work

  • Measured gas flow and composition
  • A use for the heat at the plant
  • A gas grid or power connection for the chosen option

Frequently asked questions

Do I need co-substrates?

Not necessarily. Adding fat or food waste raises output, but it needs separate approval and handling.

Is CHP or upgrading better?

For a small gas flow, CHP. For a large flow and a nearby grid, upgrading. The calculator compares both.

What about the old digester?

Its condition matters. An old or leaking digester loses gas; this is a point for the engineer to check.