Independent biogas & biomethane analytics

Will a biogas plant pay off for your business?

Get an initial view in three minutes: could biogas from your organic residues pay off, and what would make the project viable?

  • We don't sell equipment
  • No subsidies baked in
  • Open methodology

How biogas works — and what we calculate at every step

01 · Feedstock

It all starts with what you already have

Manure, whey, slaughter residues, food waste, vinasse. Your feedstock sets the plant size — not a supplier catalogue.

What we calculate

Your tonnes, dry matter, seasonality and haulage distance. Slurry doesn't travel far — we flag when transport eats the margin.

02 · Digester

Bacteria at work, without oxygen, at ≈ 38 °C

In 25–35 days organic matter turns into biogas. Part of the energy goes back into heating the digester — more in winter, none in the tropics.

What we calculate

Digester volume and month-by-month heat balance for your climate — Finland is not Thailand.

03 · Biogas

50–65 % methane — keep losses low

A gas holder buffers production. Every percent of methane leaked is lost money and climate damage.

What we calculate

Biogas as a range, not a single number — and methane losses next to the climate benefit.

04 · Energy

Power, heat or biomethane — only where they're needed

CHP, boiler or upgrading to grid-quality biomethane: chosen by your demand, scale and country rules. Heat nobody uses isn't income.

What we calculate

Power you'll use yourself, power you'll sell, heat produced vs heat actually useful, and biomethane volumes.

05 · Digestate

Fertiliser — or a cost

What leaves the digester goes back to the fields — if there is land, a season and a nitrogen limit that allow it.

What we calculate

Land required, handling cost, and whether digestate is an asset or a liability in your case.

Now — your numbers

Nine plain questions, no jargon. Rough figures are fine: you get ranges, a confidence level and a list of what to clarify.

What you get in 3 minutes

An answer before you spend on a feasibility study

  • Verdict. Strong candidate / Possible with conditions / Weak economics / Not recommended — and why.
  • Ranges, not fake precision. Feedstock, biogas, power and heat, capacity and the NPV range.
  • What could break it. Stress tests: prices, CAPEX, methane yield, heat use, logistics, downtime.
  • National conditions. Climate, energy prices and the support schemes of your country — as separate cases, never in the verdict.

Built for the whole industry

From a 50 kW farm plant to a 50 GWh biomethane project

Farming and aquaculture

Dairy farm · Beef / mixed cattle · Pig farm · Poultry farm

Industry and food trade

Dairy / cheese plant · Slaughter / meat processing · Fish processing · Fruit & vegetable processing

Waste, wastewater and biogas facilities

Centralised biogas plants and cooperatives · Municipality / waste operator · Municipal wastewater plant · Waste landfill owners and operators

Is it for you?

Find the right biogas project for your business

Select your business to explore feedstocks, technical constraints and documented market activity.

Centralised biogas plants and cooperatives

Shared processing of manure and organic residues from several suppliers

Feedstock range: engineering assumption: 30,000–700,000 t/yr

What it takes
  • 2–3 supplier quotes for the plant
  • Grid or gas-network connection conditions from the operator
  • Letters of intent for feedstock supply and for heat, power or biomethane offtake
Model on a typical case
Danish-style farm cluster, biomethane · Denmark
Possible with conditions
Biogas
5.9M – 8.1M m³/yr
Capacity
1,900 kWe
Investment
€11M – €14M
Payback (base)
7.5 yr

Illustrative example calculated with the same model as the calculator. Subsidies excluded.

10-second check

Three signs it's worth running the numbers

  1. 1. A steady stream of organic waste

    Daily, not seasonal: thousands of tonnes of processing residues a year, or large herds plus co-substrates.

  2. 2. You pay for disposal

    Or have a waste problem — odour, lagoons, regulators. That's money the project can save.

  3. 3. You need heat and power on site

    All year: steam, hot water, cooling, space heating. Selling to the grid without support is a weak argument.

Two out of three? Assess my project →

When biogas isn't for you

  • Little feedstock, or it has to travel tens of kilometres
  • Nobody needs the heat and there's nowhere to use the power
  • The case only works with a tariff or a grant

We'll tell you straight. A weak project left unbuilt beats a plant that stands idle.

From numbers to a running plant

Verdict first. Equipment later.

You pay for the next step only when the previous one showed it's worth it.

  1. 01

    Free screening

    Calculator: potential, risks, an honest verdict and how firm it is.

    Free · 3 min
  2. 02

    Standard Report

    CAPEX, payback and where the energy goes. Base-case cash flow and returns, plant sizing and monthly energy balance.

    Instant
  3. 03

    Extended Report

    3 scenarios × 3 routes (CHP, boiler, biomethane). 8 stress tests and break-even points. National support schemes as separate cases.

    Instant
  4. 04

    Detailed study

    If the verdict holds, the report becomes the brief for a feasibility study, supplier quotes and permits. We sell no equipment.

    Your next step

Why you can trust the numbers

We calculate as if it were our money

Feedstock first

Capacity comes from your tonnes and dry matter — not from the kW you'd like.

Ranges, not fake precision

Low / base / high and a confidence level for every result.

Only used heat counts

Heat produced and heat actually useful are reported separately.

Subsidies aren't guaranteed

The verdict is subsidy-free; national schemes appear as separate cases.

Logistics can kill a project

We warn when distance eats the margin.

Methane must not leak

Methane losses sit next to the climate benefit, not instead of it.

Questions

The essentials

Is the screening really free?

Initial results are free. Choose a paid report for the detail: the base case or the full comparison of scenarios and risks.

Do you sell equipment?

No. We sell no plants or equipment and do not pass your data to suppliers. The report helps you ask suppliers for quotes and commission a feasibility study.

How accurate is it?

A screening estimate (AACE class 5), not a feasibility study. It is meant to separate clear no-go and clear go projects and to show the grey zone in between — the report says which one yours is. How the model compares with real plants is published on the Methodology page. A bankable figure (±15 %) needs a lab test of your feedstock, supplier quotes and offtake contracts.

Does it work for my country?

Yes — 33 countries. Prices come from official statistics where they exist (Eurostat, national regulators, EIA, World Bank), climate from ERA5 reanalysis for each region, country risk from Damodaran. Where no official series exists, the value is marked as an estimate — and your own prices always override the defaults.

What about feed-in tariffs and grants?

We never put them in the verdict. Where a national scheme exists, the report shows its effect as a separate case, with its status and source.

What happens to my data?

We process contact and project data only to provide the service and to contact you. Only the providers that run the service for us process it: payment, hosting, email delivery and error monitoring. We never pass it to equipment suppliers. You may request deletion at any time.

Three minutes to see whether your project is worth exploring

No sign-up. No equipment sales. An honest answer.

Assess my project