Sample report · Germany

Municipal wastewater plant · Existing biogas (incl. a running plant)

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

Incremental use of an existing sludge-biogas stream. The gas transfer price includes upstream production; the model adds no new digester.

Operating assumptions

  • Operating days: 365 d/a
  • Active months: 12 1–12
  • Starting month: 1 1–12
  • CAPEX: 350,000 EUR
  • OPEX: 25,000 EUR/a
  • Residuals disposal cost: 0 EUR/t
  • Upstream electricity use: 80,000 kWh/a
  • Additional process heat: 0 kWh_th/a
  • Scenario uncertainty: 25 %
  • Q (biogas): 300 Nm³/h
  • CH₄: 62 % vol
  • Gas supply availability: 95 %
  • Annual gas decline: 0 %/a
  • Biogas purchase price: 0.06 EUR/Nm³
  • N₂: 1 % vol
  • O₂: 0.2 % vol
  • H₂S: 1,500 ppmv
  • Upgrading · CAPEX: 1,900,000 EUR
  • Upgrading · η CH₄: 98 % CH₄
  • Upgrading · kWh/Nm³: 0.3 kWh/Nm³ raw
  • Upgrading → CH₄: 97 % CH₄
  • Electricity: 6,000,000 kWh/yr · Electricity price on your bill (if known): —
  • All year: hot water, steam, process · Heat needed per year (if known): 4,000,000 kWh/yr
  • Land available for spreading digestate: — · Distance to the gas grid (for biomethane): 2 km
  • Grid connection? Yes

What to verify

Check dry standard gas flow, siloxanes, H2S, seasonal heat demand, gas purchase terms and vendor performance guarantees.

Strong candidate

Worth detailed work: the project holds up even under conservative assumptions.

  • Simple payback ≈ 3.5 yrs (base) and ≈ 9.7 yrs in the conservative case; base NPV €4.8M; minimum DSCR 3.49.

Largest benefit — “electricity savings (self-consumption)”: ≈ 74 % of all revenue and savings.

What would change the verdict
  • → Verify the inlet analysis and operating history, seasonal availability, and a supplier guarantee for the proposed treatment train.
  • → Confirm complete installed-cost quotations, residuals disposal, final effluent treatment and the energy offtake contract. Check the downside case before investment.
  • → Obtain site-specific permits and grid gas-quality requirements; extend this pre-tax screening to tax, working capital and lender cash-flow modelling.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

Robust: profitable even in the conservative case (lower gas yield, higher CAPEX, lower prices). The next step is worth paying for.

NPV: conservative €230K · base €4.8M · optimistic €6.7M

Biggest drivers of the result (stress tests):
  1. Energy prices −20 % (-€2.2M)
  2. Useful heat (economic) −50 % (-€1.5M)
  3. CH₄ −20 % (-€1M)

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

To reach a bankable estimate (±15 %)
  1. 2–3 supplier quotes for the plant
  2. Grid or gas-network connection conditions from the operator
  3. Letters of intent for feedstock supply and for heat, power or biomethane offtake
  4. Then a feasibility study with permits and financing (±15 %)
From screening to construction

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€2.1M – €2.7M
Payback
2.6 yr – 9.7 yr
base: 3.5 yr · no subsidies
NPV (base)
€4.8M
range: €230K … €6.7M
Chosen route
CHP (power + heat)
Confidence: Medium

Feedstock and energy

Existing biogas (incl. a running plant)
300 Nm³/h
CH₄: 62 % vol
Biogas
1.7M – 3.1M Nm³/yr
≈ 312 Nm³/h (base)
Net energy
3,400 – 5,300 MWh/yr
useful heat: 2,400 – 3,800 MWh · ≈ 84 % of your electricity use
Candidate capacity
820 kWe
medium (0.25–1 MW)

How far you can rely on these numbers

Medium · 75/100
  • Backed by your data and our sources75
  • You can still add+6
  • Limits of our data−9
  • Needs a feasibility study (lab, quotes, contracts)10

75/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainElectricity price on your bill (if known) (EUR/kWh)Large effectTotal of one bill divided by the kWh on it+6

With all of it: up to 81/100

Limits on our side

  • Process inputs and project budgets require document verification; ranges are assumptions, not validated accuracy.−9

These come from our country price and cost data or the screening scope, not from your project. We update them.

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Upstream budgets must include pretreatment, logistics, storage and final treatment; they are not independently verified installed quotations.
  • The treatment quotation and recovery must cover the actual H2S, siloxanes, moisture, N2 and O2. Entered product purity is a design requirement, not demonstrated gas-grid compliance.
  • CHP performance uses a 50 Hz biogas full-load catalogue reference (03/2025), interpolated between ratings; part-load and ambient derating require supplier confirmation.
Country conditions
  • Mature market (≈ 9 300 CHP plants): German economics are tariff-driven — compare the support case with the no-support verdict.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 1,600 MWh a year, valued at ≈ €0.0841 per kWh.
Strong candidate€6.2M+€1.5Mheat ≥ €0.0563 per kWh
Order of action
  1. 1Find a heat buyer for ≈ 1,600 MWh a year (heat ≥ €0.0563 per kWh).
  2. 2Ask 3–5 suppliers for quotes: the project breaks even up to an investment of €6.5M. →

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Electricity value at NPV = 0
€0.0621/kWh
now €0.148/kWh
Highest installed cost at NPV = 0
€6.5M
now €2.3M

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: 4.8M)

  1. Energy prices −20 %-2.2M
  2. Useful heat (economic) −50 %-1.5M
  3. CH₄ −20 %-1M
  4. Feedstock potential −20 %-1M
  5. CHP downtime +10 pp-850K
  6. OPEX +30 %-690K
  7. CAPEX +20 %-520K
  8. Maintenance +30 %-280K
NPV = 0 if CAPEX falls by
already positive
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
already positive
relative to the base case

Scenarios

Route: CHP (power + heat). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€1M
  • Electricity self-consumption savings750K
  • Useful heat (economic)270K
OPEX / yr€360K
  • Biogas purchase price150K
  • Staff89K
  • CHP service and overhaul reserve68K
  • OPEX25K
Operating margin (EBITDA)€650K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr1,685.22,496.63,120.8
CAPEX€2.7M€2.3M€2.1M
OPEX / yr€330K€360K€390K
Revenue + savings / yr€600K€1M€1.2M
Operating margin (EBITDA)€270K€650K€810K
Simple payback9.7 yr3.5 yr2.6 yr
Discounted payback13.4 yr3.9 yr2.8 yr
NPV€230K€4.8M€6.7M
IRR7.2 %29.6 %40.5 %
DSCR (min)1.33.54.8

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).

Cumulative cash flow, €
-3.5M510K4.5M8.6M13M03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) chosen€2.3M€650K3.5 yr€4.8M€230K … €6.7M
Boiler (heat only) €940K-€19Kno payback-€1.2M-€2.1M … -€580K
Biomethane €3.4M€500K6.7 yr€1.9M-€4M … €8M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 307 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

Support may be possible, but eligibility is not confirmed

On the scheme's terms the NPV is above zero.

Best option: EEG Ausschreibung Biomasse Details ↓

NPV change
+€300K
NPV with support
€5.1M
Payback
3.1 yr
IRR
32.1 %

Next step: Ask the scheme operator in writing whether your project meets the conditions the model does not check.

Country overviewchecked 30 Oct 2026

Small manure plants ≤ 150 kW get a fixed EEG rate (≈ 20 ct/kWh, 20 years, ≥ 80 % manure); larger plants bid in tenders (2026 average award 18.5 ct/kWh) with a flexible-operation duty.

Open for applications (1)

You can apply now on the published terms.

EEG 2023 Güllekleinanlage

Open
Electricity tariff
Does not qualify
Manure other than poultry manure is 0 % of the fresh mass; the scheme requires at least 80 %.

Not calculated: the project does not meet the conditions.

Conditions
  • not met: Electrical capacity up to 150 kW (project ≈ 820 kW)
  • not met: Manure other than poultry manure: at least 80 % of fresh mass (project 0 %)
  • met: CHP of a practical size, from 25 kW (project ≈ 820 kW)
  • no data: Gas-source category accepted by the scheme
What the case uses
  • Route: CHP (power + heat)
  • Tariff: €0.202/kWh
Scheme terms

Commissioned 1.7.2026–30.6.2027: 21.67 ct (≤ 75 kW) / 18.72 ct (75–150 kW); 20 years; ≥ 80 % manure (no poultry); unpaid in negative-price hours.

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Source: EEG 2023 §44, §44a (gesetze-im-internet.de): 22/19 ct − 0.5 % each 1 July from 2024 · checked 30 Oct 2026 · Data confidence: Medium

Running, awarded by competition (1)

Support goes to the winners of a round or auction. The case assumes an award at the stated value.

EEG Ausschreibung Biomasse

Competitive
Electricity tariff
Eligibility to confirm
Eligibility of an existing biogas stream is not modelled: shown "if eligible". Confirm the gas-source category, tariff and any existing support with the scheme operator.
NPV change
+€300K
NPV with support
€5.1M
Payback
3.1 yr
IRR
32.1 %
Conditions
  • met: Electrical capacity from 150 kW (project ≈ 820 kW)
  • met: Maize and cereal grain: at most 25 % of fresh mass (project 0 %)
  • met: CHP of a practical size, from 25 kW (project ≈ 820 kW)
  • no data: Gas-source category accepted by the scheme
Not checked by the model — confirm with the operator:
  • no data: Flexible design: engines and gas storage sized for the paid hours (extra CAPEX not costed)
What the case uses
  • Route: CHP (power + heat)
  • Tariff: €0.18/kWh
Scheme terms

Pay-as-bid; April 2026 average award 18.46 ct, ceiling 19.43 ct (new); paid only for 11 680 quarter-hours a year (≈ 2 920 full-load h; 16 000 ≈ 4 000 h up to 350 kW), the rest at market value; maize + grain ≤ 25 % by mass; the flexible design (extra engine capacity, gas storage) is not costed.

Next step: Ask the scheme operator in writing whether your project meets the conditions the model does not check.

Source: BNetzA press releases 2026-06-09 and 2026-11-03 (bid dates 01.04 / 01.10.2026; October average 18.75 ct, 13.95–19.80, undersubscribed); EEG §39 · checked 30 Oct 2026 · Data confidence: Medium

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

53/100

Of every 100 kWh of energy in the methane, 53 become a product that earns money or replaces a purchase.

100 % = 15,000 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Electricity used on site5,000 MWh 33 %
  • Heat for a user3,200 MWh 21 %

Runs the plant

  • Plant’s own electricity80 MWh 0.5 %

Produced, not used

  • Heat with no buyer2,800 MWh 18 %

Losses

  • Conversion losses (engine, boiler)3,800 MWh 25 %
  • Gas sent to the flare320 MWh 2 %
  • Methane leaks230 MWh 2 %

What this means for the project

  • 2,800 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income. At the heat value used in this case that is about €230K a year.
  • Methane leaks are 1 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Engine efficiency: electricity / heat
43 % / 44 %Assumption
Heat need
4,000 MWhYour data
Site electricity use
6,000 MWhYour data
Methane leaks, base case
1 %Assumption
Main product, conservative – optimistic
3,400 – 5,300 MWhCalculated

How it works: from feedstock to products

Heat produced (gross)
5,974 MWh
Digester heat demand
0 MWh
Useful heat (economic)
3,200 MWh of 5,974
Power: own use / sold
5,044 / 0 MWh

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
100/100
  • Energy equivalent ≈ 820 kWe (scale score 100/100)
  • Process-specific inlet basis; no generic feedstock energy-density score.
  • Feedstock available 12 of 12 months
Energy fit
75/100
  • Own consumption absorbs 100 % of the electricity produced
  • Useful heat 3200 MWh of 5974 MWh available after digester needs
Location & logistics
100/100
  • Land for digestate unknown
Technical feasibility
100/100
  • Standard layout for this scale, no critical obstacles
Economics
100/100
  • Base-case simple payback ≈ 3.5 years
  • NPV positive even in the conservative case
Regulatory complexity
18/100 risk
  • Number and weight of permitting / regulatory steps: 9 points (more = harder)
Environmental risk
24/100 risk
  • Expected methane loss 2.5 % (good practice ≤ 2 %)
  • Unknown where the digestate will go
Overall project viability
93/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Feedstock fit (100); weakest: Energy fit (75).

Calculation details

Existing biogas (incl. a running plant)

Leave unknown costs and auxiliary loads blank. Economics require these inputs.

CH₄ → CHP / Upgrading / Boiler
1,547,890 Nm³ CH₄/a
CH₄ loss
0 Nm³ CH₄/a
m residual
0 t/a

Enter the project budget for the upstream process, including pretreatment, logistics, storage and final treatment. Gas conversion equipment and energy are calculated separately. Enter zero only for a confirmed zero cost. Exclude from this budget; calculated separately: residuals disposal cost, biogas purchase price.

Technology & digester

Biogas / CHP / boiler

    Climate: Bavaria (Landshut), mean 11 °C, ≈ 2,735 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 1.1 °C), Prague (CZ) (Δ 1.3 °C), Munich (DE, Bavaria) (Δ 1.8 °C).

    Monthly energy balance

    Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

    MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
    Jan01,2900272428
    Feb01,1760248390
    Mar01,2900272428
    Apr01,2490263414
    May01,2900272428
    Jun01,2490263414
    Jul01,2900272428
    Aug01,2900272428
    Sept01,2490263414
    Oct01,2900272428
    Nov01,2490263414
    Dec01,2900272428
    Σ015,20103,2005,044
    CAPEX, OPEX, revenue (base case)
    CAPEX (EUR)
    Existing biogas (incl. a running plant)350K
    Gas handling and cleaning67K
    CHP (power + heat)1.2M
    Heat network110K
    Electrical systems and controls80K
    Pipework54K
    Civil works80K
    Grid connection69K
    Engineering and permits130K
    Contingency180K
    Total2.3M
    OPEX / yr (EUR)
    Staff89K
    CHP service and overhaul reserve68K
    Maintenance15K
    Insurance11K
    Testing and monitoring5K
    OPEX25K
    Biogas purchase price150K
    Total360K
    Revenue + savings / yr (EUR)
    Electricity self-consumption savings750K
    Useful heat (economic)270K
    Total1M

    Unit costs are estimates. Replace them with supplier quotations.

    Digestate and residues

    No digestate: the project uses gas from an existing source; residues stay with the existing site.

    Methane losses & climate

    Expected losses: 2.5 % of methane produced (range 1.7 % – 4 %) ≈ 751 t CO₂e/yr; fossil emissions displaced ≈ 2,311 t CO₂/yr. Losses vs benefit: 32 %.

    • Expected loss 2.5 % is above good practice (2 %): budget for monitoring.
    • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
    • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
    • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
    • CHP with an oxidation catalyst and tuning regime to cut methane slip.

    Avoided emissions from open manure storage are not credited (conservative).

    Permits & regulation (indicative)

    Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

    • Building permit and environmental permit; EIA screening (Directive 2011/92/EU as transposed)
      New installation · effort: medium · to verify
    • ATEX hazardous-area zoning (Directives 2014/34/EU, 1999/92/EC)
      Methane in the gas phase · effort: medium · confirmed
    • Medium Combustion Plant Directive (2015/2193): registration and emission limits for CHP ≥ 1 MW thermal input
      CHP above 1 MWth input · effort: medium · to verify
    • Confirm gas transfer contract, inlet quality and approvals for the new gas-use equipment
      Process-specific site conditions; no automatic legal eligibility · effort: high · to verify
    Safety (risk register)
    • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
      • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
      • Fixed gas detectors in the CHP room and near tanks
      • Flame arresters, over/under-pressure relief, safety flare
      • Ignition-source control and hot-work permits
    • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
      • Biological / chemical desulphurisation of the biogas
      • Personal H₂S monitors, no lone working
      • H₂S monitoring upstream of the CHP (engine protection)
    • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
      • Entry only under permit, ventilation, standby person
      • Self-contained breathing apparatus for rescue
    • Over/under-pressure: membrane roof rupture, tank deformation medium
      • Liquid seals / relief valves venting to a safe location
      • Gas-holder level and pressure sensors
    • CHP: carbon monoxide, fire, high temperatures medium
      • CHP room ventilation, CO detectors
      • Emergency stop, fire suppression
    • Soil and water pollution: slurry/digestate spills, lagoon overflow high
      • Bund sized for the largest tank
      • Level sensors and a spill-response plan
      • Digestate storage covering the closed spreading season

    Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

    Assumptions used (114)

    Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

    • Support: Small manure plants ≤ 150 kW get a fixed EEG rate (≈ 20 ct/kWh, 20 years, ≥ 80 % manure); larger plants bid in tenders (2026 average award 18.5 ct/kWh) with a flexible-operation duty.
    • Mature market (≈ 9 300 CHP plants): German economics are tariff-driven — compare the support case with the no-support verdict.
    • The verdict excludes subsidies; national support is shown as separate cases.
    • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
    • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
    • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

    Illustrative project assumptions, not an operator account or supplier quotation

    • Operating days: 365 d/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Active months: 12 1–12 · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Starting month: 1 1–12 · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • CAPEX: 350,000 EUR · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • OPEX: 25,000 EUR/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Residuals disposal cost: 0 EUR/t · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Upstream electricity use: 80,000 kWh/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Additional process heat: 0 kWh_th/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Scenario uncertainty: 25 % · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • N₂: 1 % vol · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • O₂: 0.2 % vol · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • H₂S: 1,500 ppmv · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Upgrading · CAPEX: 1,900,000 EUR · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Upgrading · η CH₄: 98 % CH₄ · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Upgrading · kWh/Nm³: 0.3 kWh/Nm³ raw · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Upgrading → CH₄: 97 % CH₄ · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Q (biogas): 300 Nm³/h · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • CH₄: 62 % vol · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Gas supply availability: 95 % · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Annual gas decline: 0 %/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE
    • Biogas purchase price: 0.06 EUR/Nm³ · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · DE

    What could break the economics

    Each stress test applied to the base case on its own.

    chp: local CAPEX factor
    0.7 … 1.3 —
    NPV low…high: €4.1M … €5.4M
    Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
    0.05 … 0.08 —
    NPV low…high: €3.9M … €5.3M
    Share of the bill actually avoided by self-generation
    0.7 … 1 —
    NPV low…high: €3.3M … €6.2M
    Q (biogas)
    225 … 375
    NPV low…high: €3.8M … €4.9M
    Biogas purchase price
    0.045 … 0.075
    NPV low…high: €4.3M … €5.2M
    OPEX
    18,750 … 31,250
    NPV low…high: €4.7M … €4.8M
    Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
    Biomethane price without support, base: 0.6925 EUR/Nm³ · CALCULATED_VALUE · LOW
    CALCULATION: TTF 46.49 €/MWh HHV × 1.11 HHV/LHV + 20 €/MWh LHV green-gas premium (engineering assumption, no official GO price); World Bank Pink Sheet (2026-10-02), Natural gas Europe (TTF), mean Q4 2025 – Q3 2026 15.25 $/mmbtu GCV ÷ 0.2931 MWh/mmbtu at 1.1193 USD/EUR; × 9.6709 kWh LHV/Nm³. No guaranteed offtake or certificate eligibility.
    2025-10 / 2026-09 · checked 2026-11-11 · Grid-injected biomethane, HHV prices converted to LHV; without feed-in tariffs, quotas or tax relief
    WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
    chp: local CAPEX factor: 1 — · CALCULATED_VALUE · MEDIUM
    0.72 traded equipment + 0.28 × local/German labour cost (31.5/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Debt interest rate (EUR-equivalent): 0.045 — · CALCULATED_VALUE · MEDIUM
    Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
    WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
    Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
    Typical agri / project lending (KfW, EBRD, IFC practice)
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
    Typical
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.06 — · CALCULATED_VALUE · MEDIUM
    Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.00 % (Aaa; Damodaran, 2026-07); not a bank offer
    2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
    WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
    Business electricity reference, excl. VAT (default if the customer gives none): 0.1742 EUR/kWh · MARKET_DATA · HIGH
    Eurostat nrg_pc_205, non-household, MWH2000-19999, excl. VAT, 2026-S1
    2026-S1 · checked 2026-10-31 · Consumer band MWH2000-19999; 6000 MWh/year customer load; existing-site load, new plant auxiliary load may change the applicable band
    WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
    Wholesale electricity price (market average): 0.1043 EUR/kWh · MARKET_DATA · HIGH
    ENTSO-E day-ahead (via Energy-Charts), zone DE-LU, average 104.3 €/MWh, 2025-10-01 – 2026-10-01
    2025-10-01 / 2026-10-01 · checked 2026-10-30 · Wholesale bidding zone DE-LU; not a guaranteed export PPA
    WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
    Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
    At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
    15 % profile & balancing discount for a small seller (assumption, same for all markets)
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Exchange rate: 1 EUR/EUR · MARKET_DATA · HIGH
    Euro
    CONSTANT: EUR reporting currency; no currency conversion
    Value of useful heat (displaced gas / boiler efficiency): 0.08411 EUR/kWh th · CALCULATED_VALUE · MEDIUM
    Business gas 75.70200000000001 €/MWh LHV ÷ 0.9
    2026-S1 · checked 2026-10-31 · GJ10000-99999; reference band, customer gas use unknown
    WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
    Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
    Shorter than the 20-year technical life — conservative
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Official hourly labour cost, economy-wide (wages + employer costs): 45 EUR/h · MARKET_DATA · HIGH
    Eurostat lc_lci_lev: hourly labour cost (wages + employer costs), industry, construction & services, 2025
    WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
    Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
    Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
    Inflation target + 0.5 pp wage drift
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Share of the bill actually avoided by self-generation: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
    TOU reference: energy/Ft portion only, demand/service charges retained. Else 85% engineering allowance. User invoice uses the generic allowance until its energy/demand split is known.
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity