Sample report · Ukraine

Meat plant, 5 000 t residues

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

A Volyn meat processor considers treating 5,000 t/year of non-saleable residues on site. Savings depend on what is genuinely paid for disposal today.

Operating assumptions

  • Slaughter by-products, Cat. 3 (blood, offal): 5,000 t/yr · DM: 18 % · 12 months · We pay for collection / disposal · What you pay for disposal: 700 UAH/t
  • Electricity: 3,800,000 kWh/yr · Electricity price on your bill (if known): 8.8 UAH/kWh
  • All year: hot water, steam, process · We use natural gas: 900,000 m³/yr · Gas price (if known): 21 UAH/m³
  • Land available for spreading digestate: 60 ha · Distance to the gas grid (for biomethane): 1.5 km
  • Existing lagoon / store that could be covered: 3,000 m³
  • Grid connection? Yes

What to verify

Confirm permitted material categories, hygienisation, fat and nitrogen loading. Obtain a digestate contract and compare direct process heat with CHP.

Weak economics

Under current conditions the investment won't pay back in a reasonable time. Below is what could change that.

  • Simple payback ≈ 7.7 yrs; base NPV -€130K (well below zero at the country discount rate).

Main reason — small scale: the feedstock supports only ≈ 88 kW, while the plant costs ≈ €7.1K per kW. Digester, storage and CHP are expensive even at small capacity.

What would change the verdict
  • → NPV = 0 with ≈ 17 % lower CAPEX (or an equivalent grant).
  • → NPV = 0 with ≈ 42 % higher energy prices.
  • → A gate-fee co-substrate (food waste, fats), a real heat customer, or a cluster with neighbours.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

Grey zone: the answer flips between the conservative and the optimistic case. Before paying for a feasibility study, check these first:

NPV: conservative -€620K · base -€130K · optimistic €160K

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in < 1 % of cases.

  1. Confirm a reliable heat buyer and demand · Useful heat (economic) −50 % (-€190K)
  2. Feedstock potential −20 % (-€150K)
  3. Get supplier quotes for the plant · CAPEX +20 % (-€150K)

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

To reach a bankable estimate (±15 %)
  1. Laboratory methane-potential (BMP) test of 2–3 feedstock samples — ≈ €300–800 each · Already entered
  2. 2–3 supplier quotes for the plant
  3. Letters of intent for feedstock supply and for heat, power or biomethane offtake
  4. Then a feasibility study with permits and financing (±15 %)
From screening to construction

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€570K – €760K
≈ UAH 32M (base)
Payback
4.9 yr – > 25 yr
base: 7.7 yr · no subsidies
NPV (base)
-€130K
range: -€620K … €160K
Chosen route
Boiler (heat only)
Confidence: Medium

Feedstock and energy

Feedstock potential
5,000 t/yr
energy ≈ 399 kWh CH₄/t
Biogas
240K – 330K Nm³/yr
≈ 38 Nm³/h (base)
Net energy
710 – 1,700 MWh/yr
Useful heat
Candidate capacity
88 kWe
small (50–250 kW)

How far you can rely on these numbers

Medium · 82/100
  • Backed by your data and our sources82
  • You can still add+8
  • Needs a feasibility study (lab, quotes, contracts)10

82/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainRoute-specific CAPEX lacks independent local validation — obtain comparable supplier quotations+8

With all of it: up to 90/100

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Ammonium nitrogen in the digester ≈ 15.5 g/L (about 60 % of the 25.8 kg/t total nitrogen). Above 3 g/L methane formation is inhibited (FNR): the model cuts the yield by 30 %. Measure NH₄-N, dilute with low-nitrogen water or a co-substrate, or plan a long acclimation.
  • Fats are 100 % of the organic matter: risk of foaming and long-chain fatty-acid inhibition; dose gradually.
  • Animal by-products (Cat. 3) → pasteurisation and veterinary approval required.
  • Fat-rich residues (grease, slaughter, fish, olive streams) make up over 25 % of the organic matter. Their lipid share is not catalogued — measure ether extract: above ≈ 30 % of VS the process is at high risk of failure.
  • In this configuration the digestate is a cost rather than an asset.
Country conditions
  • No subsidy for new small plants: the case rests on own electricity and heat, avoided disposal and energy resilience. Biomethane export to the EU (ISCC) is open to large producers.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Possible with conditions”
  • The base-case NPV is negative (-€130K).
Order of action
  1. 1Verify first: Get supplier quotes for the plant. Up to €2.8K of this decision depends on it. →
  2. 2Ask 3–5 suppliers for quotes: the project breaks even up to an investment of €520K. →

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Get supplier quotes for the plantcan change the answer-€350K … €94K€2.8K
Confirm a reliable heat buyer and demand-€220K … -€57K—
Verify the market price-€180K … -€100K—
Check the fertiliser value of the digestate-€140K … -€110K—
How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Ukraine.
Feedstock (screening values, to be confirmed):
- Cat. 3 slaughter by-products (blood, offal): 5,000 t/year, DM ≈ 18.0 %
Design basis from the screening: raw biogas ≈ 38 Nm³/h at ≈ 65 % CH₄; digester working volume ≈ 870 m³; biogas boiler ≈ 200 kWth; new digestate storage ≈ 0 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Confirm a reliable heat buyer and demand
  1. Confirm the buyer's monthly heat demand and the temperature they need.
  2. Agree a price per kWh linked to their current fuel, and a term of at least the loan period.
Request to send
Offer of renewable heat
Site: Ukraine. A biogas plant can supply ≈ 1,600 MWh of heat a year (hot water, ≈ 80–90 °C) all year round. Please tell us your monthly heat use, the temperature you need, your current fuel and its price, and the price per kWh and term you would accept.

Then enter it in: Energy step: price the heat buyer pays per kWh

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Heat price at NPV = 0
€0.0646/kWh th
now €0.0483/kWh th
Highest installed cost at NPV = 0
€520K
now €630K
Feedstock price headroom
€3.78/t
needs €3.78 per tonne less cost, or a gate fee, on every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-€300K
Median NPV
-€220K
NPV P90 (1 in 10 better)
-€140K
Chance that NPV > 0
< 1 %
Median payback
9.3 yr

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: -130K)

  1. Useful heat (economic) −50 %-190K
  2. Feedstock potential −20 %-150K
  3. CAPEX +20 %-150K
  4. CH₄ −20 %-87K
  5. Energy prices −20 %-61K
  6. Maintenance +30 %-26K
  7. Feedstock transport +50 %0
  8. CHP downtime +10 pp0
NPV = 0 if CAPEX falls by
17 %
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
42 %
relative to the base case

Scenarios

Route: Boiler (heat only). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€130K
  • Avoided disposal cost65K
  • Useful heat (economic)61K
  • Incremental digestate value6.8K
OPEX / yr€52K
  • Digestate handling16K
  • Maintenance13K
  • Purchased electricity11K
  • Testing and monitoring5K
Operating margin (EBITDA)€82K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr242.2307.9332.5
CAPEX€760K€630K€570K
OPEX / yr€59K€52K€49K
Revenue + savings / yr€84K€130K€170K
Operating margin (EBITDA)€25K€82K€120K
Simple payback> 25 yr7.7 yr4.9 yr
Discounted paybackno paybackno payback9.2 yr
NPV-€620K-€130K€160K
IRR-6.6 %11 %19.8 %
DSCR (min)0.31.32

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 50 % debt (no taxes).

Cumulative cash flow, €
-890K-270K340K960K1.6M03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) €930K€130K7.2 yr-€130K-€770K … €180K
Boiler (heat only) chosen€630K€82K7.7 yr-€130K-€620K … €160K
Biomethane €1.4M€87K16.4 yr-€920K-€1.8M … -€340K
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 34 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 2,500Boiler (heat only)44€490K-€270K
× 0.75 3,800Boiler (heat only)66€560K-€200K
× 1 your input5,000Boiler (heat only)88€630K-€130K
× 1.5 7,500CHP (power + heat)140€1.2M€89K
× 2 10,000CHP (power + heat)200€1.5M€280K
× 3 15,000CHP (power + heat)300€2.1M€670K

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

There is a scheme, but support is awarded by competition

It pays no more than the market, so it does not improve the economics.

Best option: Аукціон з ринковою премією (інші ВДЕ) — market-premium auction Details ↓

NPV change
-€3.1K
NPV with support
-€130K
Payback
7.2 yr
IRR
12.2 %

Next step: Prepare for the next round: permits are usually required before you bid, and an award is not guaranteed.

Country overviewchecked 30 Oct 2026

The only route for new plants is market-premium auctions (bid cap 12 €c/kWh; the 'other RES' lot of 30.10.2026 did not take place; indicative biogas quotas 21–29 MW a year for 2027–2030). The green tariff ends on 01.01.2030 and has no EUR floor for plants commissioned after 2024. Biomethane: export, no subsidy.

Running, awarded by competition (1)

Support goes to the winners of a round or auction. The case assumes an award at the stated value.

Аукціон з ринковою премією (інші ВДЕ) — market-premium auction

Competitive
Electricity tariff
Meets every condition we checked
NPV change
-€3.1K
NPV with support
-€130K
Payback
7.2 yr
IRR
12.2 %
Conditions
  • met: CHP of a practical size, from 25 kW (project ≈ 90 kW)
What the case uses
  • Route: CHP (power + heat)
  • Tariff: €0.12/kWh
Scheme terms

Bid cap 12 €c/kWh; your own winning bid is guaranteed via a market premium. The 30.10.2026 lot did not take place (Prozorro).

Next step: Prepare for the next round: permits are usually required before you bid, and an award is not guaranteed.

Source: Guaranteed Buyer notice 03.09.2026 (150 MW, cap 12 €c); Prozorro: auction did not take place; CMU order 298-р (508-р); Law 555-IV Art. 9-3 · checked 30 Oct 2026 · Data confidence: Low

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

63/100

Of every 100 kWh of energy in the methane, 63 become a product that earns money or replaces a purchase.

100 % = 2,000 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Heat for a user1,300 MWh 63 %

Runs the plant

  • Digester heating190 MWh 9 %

Produced, not used

  • Heat with no buyer320 MWh 16 %

Losses

  • Conversion losses (engine, boiler)200 MWh 10 %
  • Methane leaks30 MWh 2 %

What this means for the project

  • 320 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income. At the heat value used in this case that is about €15K a year.
  • The plant buys 63 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Heat need
900,000 m³Your data
Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
710 – 1,700 MWhCalculated

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 12 % of that month’s methane energy, in July 7 %.

January: methane energy 170 MWh · digester heating 19 MWh (12 %) · heat for a user 100 MWh

  • Methane energy of the month
  • Digester heating
  • Heat for a user

How it works: from feedstock to products

  1. Feedstock5,000 t/yr
  2. Biogas310K Nm³/yr
  3. Useful heat1,300 MWh
  4. Heat without demand320 MWh
  5. Digestate4,600 t/yr
Heat produced (gross)
1,769 MWh
Digester heat demand
188 MWh
Useful heat (economic)
1,265 MWh of 1,581
Power: own use / sold
0 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
24 g CO₂e/MJ
gas-tight digestate storage
Fossil comparator
80 g CO₂e/MJ
Greenhouse-gas saving
69 %
RED minimum: 80 %
Avoided emissions
253 t CO₂e
  • Below the RED minimum: a gas-tight digestate store, off-gas combustion or more manure in the mix raise the saving.
  • Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.
  • Residues other than manure, maize and food waste use the RED biowaste values.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
67/100
  • Energy equivalent ≈ 88 kWe (scale score 60/100)
  • Feedstock energy ≈ 399 kWh of methane per tonne (score 65/100)
  • Feedstock available 12 of 12 months
  • Ammonia / fat inhibition risk lowers the yield
Energy fit
80/100
  • Own consumption absorbs 0 % of the electricity produced
  • Useful heat 1265 MWh of 1581 MWh available after digester needs
Location & logistics
75/100
  • Not enough land for the digestate
Technical feasibility
75/100
  • Ammonia / fat inhibition needs active process control
  • ABP pasteurisation adds complexity
Economics
35/100
  • Base-case simple payback ≈ 7.7 years
  • Base-case NPV is negative
Regulatory complexity
41/100 risk
  • Number and weight of permitting / regulatory steps: 14 points (more = harder)
Environmental risk
35/100 risk
  • Expected methane loss 1.5 % — within good practice if gas-tight and monitored
  • Surplus digestate: risk of nitrogen over-application
Overall project viability
60/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Energy fit (80); weakest: Economics (35).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Slaughter by-products, Cat. 3 (blood, offal)5,0001860.2on site≈ 78 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Wet mesophilic digestion with solids feeding

CSTR with a solids feeder and recirculation, or horizontal plug-flow for dairy manure

Working volume
≈ 870 m³
Retention time
63.4 days
Loading rate
2.5 kg VS/(m³·d)
Digestate storage
≈ 2,300 m³
  • Dry matter 18 % is above the pumpable limit without a solids feeder (12 %).
  • Continuous feed — continuous operation gives steady gas and the simplest control.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Two-stage layout (main + post-digester) for stability with fats or larger flows.
Alternatives
  • Horizontal plug-flow (good for 10–14 % DM cattle manure)
  • Separate pasteurisation (70 °C / 1 h) ahead of a mesophilic digester instead of thermophilic operation

Climate: Volyn oblast (Lutsk), mean 9.8 °C, ≈ 3,170 heating degree-days. Closest climate analogues: Kraków (PL) (Δ 0.6 °C), Prague (CZ) (Δ 0.6 °C), Rzeszów (PL) (Δ 0.9 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan424167191050
Feb38715217960
Mar424167181050
Apr411161161040
May424167141090
Jun411161121070
Jul424167121100
Aug424167121100
Sept411161131060
Oct424167161070
Nov411161181020
Dec424167191050
Σ5,0001,9651881,2650
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester150K
Covering existing storage26K
Feedstock reception and preparation120K
Pasteurisation (70 °C / 1 h)74K
Gas handling and cleaning27K
Boiler (heat only)17K
Heat network35K
Electrical systems and controls27K
Pipework18K
Civil works27K
Grid connection7.8K
Engineering and permits43K
Contingency57K
Total630K
OPEX / yr (EUR)
Staff4.3K
Maintenance13K
Insurance3.2K
Testing and monitoring5K
Digestate handling16K
Purchased electricity11K
Total52K
Revenue + savings / yr (EUR)
Useful heat (economic)61K
Avoided disposal cost65K
Incremental digestate value6.8K
Total130K

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: liability / cost · 4,643 t/yr · nitrogen ≈ 109,250 kg/yr · land needed ≈ 643 ha (available 60 ha).

Incremental fertiliser value €6.8K/yr, handling €16K/yr, net -€9.1K/yr.

  • Not enough land: ≈ 643 ha needed at 170 kg N/ha. Surplus digestate is a cost (agreements with neighbours, separation, pelletising).
  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 1.5 % of methane produced (range 0.5 % – 3 %) ≈ 58 t CO₂e/yr; fossil emissions displaced ≈ 256 t CO₂/yr. Losses vs benefit: 23 %.

  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: medium. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Urban-planning conditions and construction permit (consequence class to be confirmed)
    New installation · effort: medium · to verify
  • Environmental impact assessment / screening (thresholds to be confirmed)
    Biogas plant as an organic-waste facility · effort: medium · to verify
  • Registration of high-hazard equipment and gas-system expert review
    Gas holders, CHP under pressure · effort: medium · to verify
  • Fire safety and explosion-hazard zoning
    Methane in the gas phase · effort: medium · to verify
  • Air-emission permit for stationary sources (CHP, flare)
    Biogas combustion · effort: lower · to verify
  • Digestate use as fertiliser: status under the pesticides & agrochemicals law and application rules
    Digestate goes to fields · effort: medium · to verify
  • Animal by-products approval: pasteurisation 70 °C / 1 h (Cat. 3) or pressure sterilisation (Cat. 2), veterinary registration
    Slaughter / dairy / food residues in the feed · effort: high · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Biological hazards: pathogens in animal by-products and food waste high
    Condition: Animal by-products / food waste in the mix
    • Pasteurisation 70 °C / 1 h (Cat. 3) with time–temperature control
    • Separate dirty and clean zones, vehicle disinfection
    • Veterinary supervision and traceability
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (165)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: The only route for new plants is market-premium auctions (bid cap 12 €c/kWh; the 'other RES' lot of 30.10.2026 did not take place; indicative biogas quotas 21–29 MW a year for 2027–2030). The green tariff ends on 01.01.2030 and has no EUR floor for plants commissioned after 2024. Biomethane: export, no subsidy.
  • No subsidy for new small plants: the case rests on own electricity and heat, avoided disposal and energy resilience. Biomethane export to the EU (ISCC) is open to large producers.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

boiler: local CAPEX factor
0.546 … 1.014 —
NPV low…high: -€350K … €94K
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country & war risk)
0.139 … 0.169 —
NPV low…high: -€180K … -€100K
Mineral potassium price
0.713 … 0.8099 EUR/kg K₂O
NPV low…high: -€130K … -€130K
Mineral nitrogen price
1.045 … 1.818 EUR/kg N
NPV low…high: -€140K … -€110K
Mineral phosphorus price
1.419 … 1.847 EUR/kg P₂O₅
NPV low…high: -€130K … -€130K
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base (EU export netback): 0.68 EUR/Nm³ · CALCULATED_VALUE · LOW
EU export: TTF 46.49 €/MWh HHV × 1.11 HHV/LHV + 20 €/MWh LHV green-gas premium (engineering assumption, no official GO price); World Bank Pink Sheet (2026-10-02), Natural gas Europe (TTF), mean Q4 2025 – Q3 2026 15.25 $/mmbtu GCV ÷ 0.2931 MWh/mmbtu at 1.1193 USD/EUR; minus Ukrainian GTS exit tariff 1.5113 EUR/MWh HHV (NEURC 2387); × 9.67 kWh/Nm³. EU entry, onward transport and certification not deducted; no guaranteed offtake
2025-07 / 2026-06 · checked 2026-11-11 · Unsupported biomethane: domestic gas parity (conservative) or EU export netback (base); exports were 65 % of Ukrainian biomethane in Q2 2026
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
boiler: local CAPEX factor: 0.78 — · CALCULATED_VALUE · LOW
0.72 traded equipment + 0.28 × local/German labour cost (5.7/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR): 0.1 — · ENGINEERING_ASSUMPTION · LOW
Indicative financing assumption informed by EBRD / IFC-backed credit programmes; not a bank term sheet
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt share for DSCR test: 0.5 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical EBRD/IFI-style lending for agrifood
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 7 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical for agri/energy credit lines (EBRD, IFC, EIB programmes)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 3.6 EUR/t · CALCULATED_VALUE · MEDIUM
2.5 €/t + 0.22 h/t × 4.9 €/h labour (same formula as every market)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 1.6 EUR/t · CALCULATED_VALUE · MEDIUM
1.2 €/t machinery + 0.08 h/t × 4.9 €/h labour (same formula as every market)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country & war risk): 0.149 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 14.85 % (Ca; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.1255 EUR/kWh · CALCULATED_VALUE · MEDIUM
Market Operator (OREE), DAM BASE index, IPS of Ukraine, mean of monthly values Oct 2025 – Sep 2026: 6 377 UAH/MWh excl. VAT; converted at 50.8152 UAH/EUR (2026-11-10)
2026-09-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 6.377 UAH (ENGINEERING_ASSUMPTION); FX (2026-11-10): 50.82 UAH/EUR (MARKET_DATA)
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
Conservative; UAH price rises offset by depreciation (EUR terms)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
30 % profile & balancing discount for a small seller (assumption)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 50.82 UAH/EUR · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-10
2026-11-10 · checked 2026-11-10 · UAH per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-y technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Historical hourly labour-cost reference (wages + employer costs): 4.975 EUR/h · CALCULATED_VALUE · MEDIUM
Derzhstat: average wage of full-time employees Sep 2026 33 153 UAH/month × 1.22 employer contributions ÷ 160 h; skilled operator premium 1.14; converted at 50.8152 UAH/EUR (2026-11-10)
2026-09-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 252.8 UAH (ENGINEERING_ASSUMPTION); FX (2026-11-10): 50.82 UAH/EUR (MARKET_DATA)
Plant operator wage relative to the economy-wide average: 1.14 — · ENGINEERING_ASSUMPTION · MEDIUM
Skilled plant operator ≈ 30 k UAH/month gross vs the 26.5 k average → ≈ 4.9 €/h operator cost
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.03 — · ENGINEERING_ASSUMPTION · MEDIUM
Wage growth > CPI in UA (NBU inflation report)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of liquid/solid organic feedstock: 0.11 EUR/(t·km) · ENGINEERING_ASSUMPTION · LOW
Tanker/tipper rate incl. empty return; diesel-driven; TO VERIFY with 3 hauliers
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Loading/unloading per tonne: 0.7 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × 4.9 €/h labour (same KTBL-based formula as every market)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.1732 EUR/kWh · USER_INPUT · MEDIUM
USER_INPUT 8.8 UAH/kWh / FX 50.8152; Official EUR reference rate, 2026-11-10. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
Useful heat displaced at customer gas price: 0.04833 EUR/kWh th · USER_INPUT · MEDIUM
USER_INPUT 21 UAH/m3 / assumed natural-gas LHV / boiler efficiency / FX 50.8152. Not independently verified (no contract or invoice date supplied).
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
slaughter_residues: dry matter: 18 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
slaughter_residues: volatile solids: 88 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
slaughter_residues: BMP (scenarios ± inter-laboratory spread): 380 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified