Business situation

A US recycled-paper wastewater design envelope. The supplier gives capacity limits, not simultaneous measured operating values. Wisconsin is a model climate profile; the reference does not disclose its site. Costs are the model's reactor-cost estimate (engineering judgement, LOW), not a budget inferred from the reference.

Operating assumptions

  • Operating days: 330 d/a
  • Active months: 12 1–12
  • Starting month: 1 1–12
  • Scenario uncertainty: 50 %
  • Methane capture: 95 % CH₄
  • Removed COD to biomass: 8 % COD
  • Sludge dry solids: 5 % TS
  • VS / TS: 80 % VS/TS
  • Heat recovery: 0 %
  • Avoided treatment charge: 0 USD/m³
  • Q: 3,785.41 m³/d
  • COD: 11,887.74 mg COD/L
  • COD removal: 80 % COD
  • CH₄: 65 % vol
  • HRT: 0.25 d
  • OLR: 20 kg/(m³·d)
  • Inlet temperature: 35 °C
  • Electricity: — · Electricity price on your bill (if known): —
  • All year: hot water, steam, process
  • Land available for spreading digestate: — · Distance to the gas grid (for biomethane): —
  • Grid connection? Yes

What to verify

Verify actual and peak flow, soluble COD, calcium and sulfate, COD removal, final aerobic polishing and actual sludge disposal. Capacity must not be presented as annual throughput or guaranteed gas output.

Reference data: Veolia — recycled-paper wastewater, USA; publication date unspecified

US; site undisclosed · undated · Source checked: 2026-10-29

ParameterValueType
Q≤ 1 US MGDDesign limit
COD load≤ 45,000 kg/dDesign limit
Q3,785.4118 m³/dDerived
Source

Weak economics

Under current conditions the investment won't pay back in a reasonable time. Below is what could change that.

  • Base-case operating margin does not cover costs.
  • Even the optimistic case has a negative NPV (-US$6.3M).

Main reason — ≈ 100 % of the heat has no user, so half of the plant's energy earns nothing.

What would change the verdict
  • → NPV = 0 with ≈ 124 % higher energy prices.
  • → Check whether the project qualifies for “RFS D3 RINs”: if it does, this project turns profitable (NPV above zero). Confirm eligibility with the scheme operator before paying for a feasibility study.
  • → Verify the inlet analysis and operating history, seasonal availability, and a supplier guarantee for the proposed treatment train.
  • → Confirm complete installed-cost quotations, residuals disposal, final effluent treatment and the energy offtake contract. Check the downside case before investment.
  • → Obtain site-specific permits and grid gas-quality requirements; extend this pre-tax screening to tax, working capital and lender cash-flow modelling.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

A clear no under these conditions: even the optimistic case does not pay back. Don't spend money on a feasibility study unless one of the changes above happens.

NPV: conservative -US$12M · base -US$8.3M · optimistic -US$6.3M

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
US$6.3M – US$7.7M
Payback
> 25 yr – no payback
base: no payback · no subsidies
NPV (base)
-US$8.3M
range: -US$12M … -US$6.3M
Chosen route
CHP (power + heat)
Confidence: Low

1 EUR = 1.1193 USD · ECB · 2026-11-09

Feedstock and energy

Industrial wastewater
3,785 m³/d
COD: 11,888 mg COD/L
Biogas
2.5M – 6.9M Nm³/yr
≈ 696 Nm³/h (base)
Net energy
5,600 – 16,000 MWh/yr
useful heat: 0 MWh
Candidate capacity
2,100 kWe
large (1–5 MW)

How far you can rely on these numbers

Low · 50/100
  • Backed by your data and our sources50
  • You can still add+40
  • Needs a feasibility study (lab, quotes, contracts)10

50/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainHeat needed per year (if known) (kWh)Large effectFuel bills for one year: gas m³ or kWh of heat+14
  • Annual electricity consumption — savings from self-consumption cannot be counted without it (kWh)Large effectAdd up the kWh on your last 12 electricity bills+12
  • Route-specific CAPEX lacks independent local validation — obtain comparable supplier quotations+8
  • Electricity price on your bill (if known) (USD/kWh)Large effectTotal of one bill divided by the kWh on it+6

With all of it: up to 90/100

High requires verified laboratory and project documents, so a screening stops at 90/100.

Cost fields left blank are estimated from the reactor volume (UASB/EGSB or covered lagoon) at a unit cost set by engineering judgement, because no dated public cost curve exists for these reactors, plus a maintenance share, own power use and the surplus-digestate price for the sludge. Pretreatment, aerobic polishing and discharge are not included. Without your reactor budget the result cannot reach the top verdict. Each figure you enter replaces its estimate.

  • CAPEX
  • OPEX
  • Residuals disposal cost
  • Upstream electricity use
  • Additional process heat
Model warnings
  • Upstream budgets must include pretreatment, logistics, storage and final treatment; they are not independently verified installed quotations.
  • BMP/COD and retention time alone do not verify salinity, ammonia inhibition, toxic contaminants or treatment stability; confirm with representative analysis and continuous pilot/vendor data.
  • Vinasse, molasses spent wash and paper-mill water often carry much sulphate, which turns part of the COD into H₂S instead of methane. Sulphate is not entered: add it from the wastewater analysis.
  • Recycled-paper mill water often carries 400–700 mg/L calcium; in the anaerobic reactor part of it precipitates as calcium carbonate, which can cement the sludge bed, dilute the active biomass and scale pipes. The model does not check calcium: measure it and ask the reactor supplier how scaling is controlled.
  • CHP performance uses a 60 Hz biogas full-load catalogue reference (04/2025), interpolated between ratings; part-load and ambient derating require supplier confirmation.
  • CHP rating is outside the 27–2,000 kW reference curve; endpoint efficiency is only a proxy. Obtain a multi-engine or equipment-specific design.
Country conditions
  • Low gas prices make biogas without credits unattractive; transport-fuel credits, not electricity savings, decide most US projects.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Possible with conditions”
  • The base-case NPV is negative (-US$8.3M).
  • Payback in the base case is no payback; it needs to be 10 yr or less.
ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 11,000 MWh a year, valued at ≈ US$0.0277 per kWh.
Weak economics-US$4.9M+US$3.4Mheat ≥ US$0.0682 per kWh
Order of action
  1. 1Find a heat buyer for ≈ 11,000 MWh a year (heat ≥ US$0.0682 per kWh).

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Electricity value at NPV = 0
US$0.1/kWh
now US$0.0447/kWh
Highest installed cost at NPV = 0
not reachable
now US$6.8M

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, USD (base: -8.3M)

  1. OPEX +30 %-2.4M
  2. CAPEX +20 %-1.6M
  3. Energy prices −20 %-1.3M
  4. Maintenance +30 %-690K
  5. CH₄ −20 %-600K
  6. Feedstock potential −20 %-600K
  7. CHP downtime +10 pp-190K
  8. Useful heat (economic) −50 %0
NPV = 0 if CAPEX falls by
not reachable
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
124 %
relative to the base case

Scenarios

Route: CHP (power + heat). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yrUS$630K
  • Electricity sales630K
OPEX / yrUS$740K
  • Staff250K
  • Residuals disposal cost210K
  • CHP service and overhaul reserve170K
  • Maintenance39K
Operating margin (EBITDA)-US$110K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr2,506.45,569.76,892.6
CAPEXUS$7.7MUS$6.8MUS$6.3M
OPEX / yrUS$620KUS$740KUS$760K
Revenue + savings / yrUS$210KUS$630KUS$800K
Operating margin (EBITDA)-US$400K-US$110KUS$33K
Simple paybackno paybackno payback> 25 yr
Discounted paybackno paybackno paybackno payback
NPV-US$12M-US$8.3M-US$6.3M
IRR———
DSCR (min)-0.8-0.3-0

Pre-tax, nominal USD, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).

Cumulative cash flow, USD
-16M-12M-7.6M-3.3M910K03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) chosenUS$6.8M-US$110Kno payback-US$8.3M-US$12M … -US$6.3M
Boiler (heat only) US$3.4M-US$630Kno payback-US$11M-US$11M … -US$11M
Biomethane US$7.1M-US$280Kno payback-US$11M-US$17M … -US$2.1M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 684 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

Support may be possible, but eligibility is not confirmed

On the scheme's terms the NPV is above zero.

Best option: RFS D3 RINs Details ↓

NPV change
+US$18M
NPV with support
US$10M
Payback
4.2 yr
IRR
22.3 %

Next step: Ask the scheme operator in writing whether your project meets the conditions the model does not check.

Country overviewchecked 30 Oct 2026

New RNG used as transport fuel earns federal RFS D3 RINs (realised ≈ $2.45–2.50 in Q2 2026, volatile); manure RNG piped into California can also earn LCFS credits (book-and-claim). The 45Z credit applies to fuel sold by the end of 2029; from 2026 only manure RNG may have a negative carbon intensity (rates for dairy and swine manure are published, beef and poultry pending; IRS Notice 2026-53). It is not included in the support cases. The biogas ITC and REAP digester support are closed.

Open for applications (2)

You can apply now on the published terms.

RFS D3 RINs

Open
Biomethane support
Eligibility to confirm
Eligibility of wastewater (sewage) gas is not modelled: shown "if eligible". Confirm the gas-source category, tariff and any existing support with the scheme operator.
NPV change
+US$18M
NPV with support
US$10M
Payback
4.2 yr
IRR
22.3 %
Conditions
  • met: Raw biogas for upgrading from 60 Nm³/h (project ≈ 684 Nm³/h)
  • no data: Gas-source category accepted by the scheme
Not checked by the model — confirm with the operator:
  • no data: Contracts showing the RNG is used as transport fuel (RFS)
  • no data: D3 RINs only for gas from manure, crop residues, wastewater sludge or landfills; gas from food waste and other non-cellulosic streams earns the lower-priced D5 RIN, and a co-digester splits its RINs by the cellulosic share (RFS)
What the case uses
  • Route: Biomethane
  • Biomethane price: US$0.761/Nm³
Scheme terms

$3/MMBtu gas + 75 % of D3 RINs at a conservative $2.00 (11.73 RIN/MMBtu) ≈ $0.75/Nm³; transport-fuel offtake required.

Next step: Ask the scheme operator in writing whether your project meets the conditions the model does not check.

Source: 40 CFR 80.1415; realised D3 $2.45–2.50/RIN in Q2 2026 (Montauk, OPAL SEC filings); EPA EMTS RIN price data · checked 30 Oct 2026 · Data confidence: Medium

RFS D3 + California LCFS (manure RNG)

Open
Biomethane support
Does not qualify
Manure is 0 % of the mass; the scheme requires ≥ 50 %.

Not calculated: the project does not meet the conditions.

Conditions
  • not met: Manure at least 50 % of fresh mass (project 0 %)
  • met: Raw biogas for upgrading from 60 Nm³/h (project ≈ 684 Nm³/h)
  • no data: Gas-source category accepted by the scheme
Not checked by the model — confirm with the operator:
  • no data: CARB pathway carbon intensity and a transport-fuel contract
What the case uses
  • Route: Biomethane
  • Biomethane price: US$1.16/Nm³
Scheme terms

Gas $3 + 75 % × (D3 $2.00 + LCFS at CI −150 g/MJ, $70/t, 2027 benchmark) ≈ $1.15/Nm³; range $0.81–2.06. Avoided-methane credit for 2 × 10 years if built before 2030.

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Source: CARB LCFS regulation (2024 amendments, eff. 2025-07-01) §95484, §95486.1, §95488.9; CARB monthly credit reports Oct 2025 – Sep 2026 ($55–81/t) · checked 30 Oct 2026 · Data confidence: Low

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

39/100

Of every 100 kWh of energy in the methane, 39 become a product that earns money or replaces a purchase.

100 % = 36,000 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Electricity sold to the grid14,000 MWh 39 %

Runs the plant

  • Plant’s own electricity1,100 MWh 3 %
  • Digester heating83 MWh 0.2 %

Produced, not used

  • Heat with no buyer14,000 MWh 40 %

Losses

  • Conversion losses (engine, boiler)6,000 MWh 17 %
  • Methane leaks540 MWh 2 %

What this means for the project

  • Heat brings no income in this result: a heat need is named, but its amount is not entered. Enter the annual heat or gas use to count it.
  • 14,000 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Engine efficiency: electricity / heat
43 % / 44 %Assumption
Heat need
named, amount not enteredNot entered
Site electricity use
—Not entered
Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
5,600 – 16,000 MWhCalculated

How it works: from feedstock to products

Heat produced (gross)
14,392 MWh
Digester heat demand
83 MWh
Useful heat (economic)
0 MWh of 14,309
Power: own use / sold
0 / 14,044 MWh

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
100/100
  • Energy equivalent ≈ 2110 kWe (scale score 100/100)
  • Process-specific inlet basis; no generic feedstock energy-density score.
  • Feedstock available 12 of 12 months
Energy fit
30/100
  • Own consumption absorbs 0 % of the electricity produced
  • Useful heat 0 MWh of 14309 MWh available after digester needs
  • Electricity consumption not given
  • Heat consumption not given
Location & logistics
100/100
  • Land for digestate unknown
Technical feasibility
100/100
  • Standard layout for this scale, no critical obstacles
Economics
0/100
  • Operating margin ≤ 0 — no payback
  • Base-case NPV is negative
  • Minimum DSCR -0.30 — below the usual bank threshold of 1.2–1.3
Regulatory complexity
27/100 risk
  • Number and weight of permitting / regulatory steps: 11 points (more = harder)
Environmental risk
24/100 risk
  • Expected methane loss 2.5 % (good practice ≤ 2 %)
  • Unknown where the digestate will go
Overall project viability
40/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Capped at 40: weak economics is not offset by other factors.
  • Strongest: Feedstock fit (100); weakest: Economics (0).

Calculation details

Industrial wastewater

Leave unknown costs and auxiliary loads blank. Economics require these inputs.

COD in
14,850,000 kg COD/a
COD out
2,970,000 kg COD/a
COD → X
950,400 kg COD/a
COD → CH₄
10,929,600 kg COD/a
m sludge (wet)
16,732.4 t/a
m in
1,249,190 t/a
m gas
6,789.23 t/a
m out
1,225,660 t/a
V
2,250 m³
HRT
0.594387 d
OLR
20 kg COD/m³/d
COD out
2,423.18 mg COD/L
CH₄ → CHP / Upgrading / Boiler
3,620,330 Nm³ CH₄/a
CH₄ loss
190,544 Nm³ CH₄/a
CH₄ total
3,810,880 Nm³ CH₄/a
m residual
16,732.4 t/a

Enter the project budget for the upstream process, including pretreatment, logistics, storage and final treatment. Gas conversion equipment and energy are calculated separately. Enter zero only for a confirmed zero cost. Exclude from this budget; calculated separately: residuals disposal cost, biogas purchase price.

Technology & digester

COD / UASB–EGSB

Working volume
≈ 2,200 m³
Retention time
0.6 days

    Climate: Wisconsin (Green Bay), mean 8.8 °C, ≈ 3,662 heating degree-days. Closest climate analogues: Vilnius (LT) (Δ 2.5 °C), Rzeszów (PL) (Δ 2.6 °C), Kraków (PL) (Δ 2.9 °C).

    Monthly energy balance

    Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

    MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
    Jan106,0233,0181101,192
    Feb96,6172,7501001,086
    Mar106,0233,018901,192
    Apr102,6032,920701,153
    May106,0233,018601,192
    Jun102,6032,920401,153
    Jul106,0233,018301,192
    Aug106,0233,018401,192
    Sept102,6032,920501,153
    Oct106,0233,018701,192
    Nov102,6032,920801,153
    Dec106,0233,0181001,192
    Σ1,249,18635,55383014,044
    CAPEX, OPEX, revenue (base case)
    CAPEX (USD)
    Industrial wastewater1.8M
    Gas handling and cleaning140K
    CHP (power + heat)3M
    Heat network300K
    Backup boiler1.1K
    Electrical systems and controls200K
    Pipework140K
    Civil works200K
    Grid connection180K
    Engineering and permits330K
    Contingency450K
    Total6.8M
    OPEX / yr (USD)
    Staff250K
    CHP service and overhaul reserve170K
    Maintenance39K
    Insurance34K
    Testing and monitoring5.6K
    OPEX37K
    Residuals disposal cost210K
    Total740K
    Revenue + savings / yr (USD)
    Electricity sales630K
    Total630K

    Unit costs are estimates. Replace them with supplier quotations.

    Digestate and residues

    Excess sludge ≈ 16,732 t/yr (wet); effluent ≈ 2,423 mg COD/L goes on to final treatment. Confirm the discharge limit and the sludge route.

    Methane losses & climate

    Expected losses: 2.5 % of methane produced (range 1.6 % – 4 %) ≈ 1,742 t CO₂e/yr; fossil emissions displaced ≈ 7,370 t CO₂/yr. Losses vs benefit: 24 %.

    Methane not captured by the project: ≈ 190,544 Nm³ CH₄/yr. It is outside the plant loss figure above.

    • Expected loss 2.5 % is above good practice (2 %): budget for monitoring.
    • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
    • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
    • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
    • CHP with an oxidation catalyst and tuning regime to cut methane slip.

    Avoided emissions from open manure storage are not credited (conservative).

    Permits & regulation (indicative)

    Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

    • State air permit (CHP/flare) and possibly Title V; EPA NSPS/NESHAP for engines
      Combustion of biogas · effort: medium · to verify
    • CAFO / NPDES and state nutrient-management plan for digestate
      Manure / digestate land application · effort: medium · to verify
    • County zoning / conditional-use permit and building permits
      New installation · effort: medium · to verify
    • Utility interconnection agreement (state rules / FERC for wholesale)
      Electricity export · effort: medium · to verify
    • Confirm discharge limits, final polishing and sludge disposal authorisations
      Process-specific site conditions; no automatic legal eligibility · effort: high · to verify
    Safety (risk register)
    • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
      • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
      • Fixed gas detectors in the CHP room and near tanks
      • Flame arresters, over/under-pressure relief, safety flare
      • Ignition-source control and hot-work permits
    • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
      • Biological / chemical desulphurisation of the biogas
      • Personal H₂S monitors, no lone working
      • H₂S monitoring upstream of the CHP (engine protection)
    • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
      • Entry only under permit, ventilation, standby person
      • Self-contained breathing apparatus for rescue
    • Over/under-pressure: membrane roof rupture, tank deformation medium
      • Liquid seals / relief valves venting to a safe location
      • Gas-holder level and pressure sensors
    • CHP: carbon monoxide, fire, high temperatures medium
      • CHP room ventilation, CO detectors
      • Emergency stop, fire suppression
    • Soil and water pollution: slurry/digestate spills, lagoon overflow high
      • Bund sized for the largest tank
      • Level sensors and a spill-response plan
      • Digestate storage covering the closed spreading season

    Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

    Assumptions used (109)

    Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

    • Support: New RNG used as transport fuel earns federal RFS D3 RINs (realised ≈ $2.45–2.50 in Q2 2026, volatile); manure RNG piped into California can also earn LCFS credits (book-and-claim). The 45Z credit applies to fuel sold by the end of 2029; from 2026 only manure RNG may have a negative carbon intensity (rates for dairy and swine manure are published, beef and poultry pending; IRS Notice 2026-53). It is not included in the support cases. The biogas ITC and REAP digester support are closed.
    • Low gas prices make biogas without credits unattractive; transport-fuel credits, not electricity savings, decide most US projects.
    • The verdict excludes subsidies; national support is shown as separate cases.
    • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
    • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
    • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

    Published technical observations; unreported inputs are engineering assumptions. No current installed budget or upstream operating accounts disclosed.

    • Operating days: 330 d/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • Active months: 12 1–12 · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • Starting month: 1 1–12 · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • Scenario uncertainty: 50 % · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • Q: 3,785 m³/d · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • COD: 11,890 mg COD/L · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • COD removal: 80 % COD · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • CH₄: 65 % vol · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • Methane capture: 95 % CH₄ · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • Removed COD to biomass: 8 % COD · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • Sludge dry solids: 5 % TS · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • VS / TS: 80 % VS/TS · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • HRT: 0.25 d · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • OLR: 20 kg/(m³·d) · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • Inlet temperature: 35 °C · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • Heat recovery: 0 % · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • Avoided treatment charge: 0 USD/m³ · ENGINEERING_ASSUMPTION · LOW · 2026-10-29 · US
    • Methane COD equivalent: 4 kg COD/kg CH₄ · ENGINEERING_ASSUMPTION · HIGH · 2019-01-01 · GLOBAL · https://www.ipcc-nggip.iges.or.jp/public/2019rf/pdf/5_Volume5/19R_V5_6_Ch06_Wastewater.pdf
    • Biomass COD/VSS: 1.42 kg COD/kg VSS · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · GLOBAL
    • processCapexLocal: model estimate (field left blank): 1,833,000 USD · ENGINEERING_ASSUMPTION · LOW · undated · US
    • processOpexLocalYear: model estimate (field left blank): 36,670 USD/a · ENGINEERING_ASSUMPTION · LOW · undated · US
    • residualCostLocalT: model estimate (field left blank): 12.48 USD/t · ENGINEERING_ASSUMPTION · LOW · undated · US
    • auxiliaryKwhYear: model estimate (field left blank): 0 kWh/a · ENGINEERING_ASSUMPTION · LOW · undated · US
    • auxiliaryHeatKwhYear: model estimate (field left blank): 0 kWh_th/a · ENGINEERING_ASSUMPTION · LOW · undated · US

    What could break the economics

    Each stress test applied to the base case on its own.

    chp: local CAPEX factor
    0.784 … 1.456 —
    NPV low…high: -US$10M … -US$6.6M
    Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
    0.051 … 0.081 —
    NPV low…high: -US$8.4M … -US$8.1M
    Business electricity reference, excl. VAT (default if the customer gives none)
    0.096 … 0.1373 USD/kWh
    NPV low…high: -US$8.3M … -US$8.3M
    COD
    5,944 … 17,830
    NPV low…high: -US$11M … -US$5.2M
    COD removal
    40 … 99
    NPV low…high: -US$9M … -US$6.4M
    Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
    Biomethane price without support, base: 0.2239 USD/Nm³ · CALCULATED_VALUE · LOW
    National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
    WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
    Local CAPEX relative to the German baseline: 1.12 — · CALCULATED_VALUE · LOW
    chp only. Labour formula gives 0.97, but US EPA AgSTAR cost data ($1 100–1 500 per cow at 500 cows) sit ≈ 15–25 % above the model at factor 1.0: higher engineering, permitting and interconnection cost
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    chp: local CAPEX factor: 1.12 — · CALCULATED_VALUE · LOW
    chp only. Labour formula gives 0.97, but US EPA AgSTAR cost data ($1 100–1 500 per cow at 500 cows) sit ≈ 15–25 % above the model at factor 1.0: higher engineering, permitting and interconnection cost
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Debt interest rate (EUR-equivalent): 0.046 — · CALCULATED_VALUE · MEDIUM
    Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
    WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
    Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
    Typical agri / project lending (KfW, EBRD, IFC practice)
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
    Typical
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Digestate that has no adequate land: 12.48 USD/t · CALCULATED_VALUE · MEDIUM
    Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
    WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
    Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.061 — · CALCULATED_VALUE · MEDIUM
    Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.22 % (Aa1; Damodaran, 2026-07); not a bank offer
    2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
    WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
    Business electricity reference, excl. VAT (default if the customer gives none): 0.1167 USD/kWh · CALCULATED_VALUE · MEDIUM
    EIA Electric Power Monthly 5.6.B, Wisconsin, 2026-01/2026-08: commercial 13.73 ¢, industrial 9.60 ¢/kWh → midpoint for farms and food processors, excl. taxes; converted at 1.1193 USD/EUR
    2026-01/2026-08 · checked 2026-10-31 · Wisconsin; sector averages, not the customer's tariff
    WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
    Wholesale electricity price (market average): 0.05264 USD/kWh · CALCULATED_VALUE · MEDIUM
    EIA STEO table 7a: Midcontinent ISO Illinois hub, 2025-10 – 2026-09 mean $52.64/MWh (hub serving Wisconsin); converted at 1.1193 USD/EUR
    2025-10-01 / 2026-09-30 · checked 2026-10-31 · Wholesale hub assigned to Wisconsin; not a guaranteed export price
    WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
    Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
    At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
    15 % profile & balancing discount for a small seller (assumption, same for all markets)
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Exchange rate: 1.119 USD/EUR · MARKET_DATA · HIGH
    Official EUR reference rate, 2026-11-09
    2026-11-09 · checked 2026-11-10 · USD per EUR; dated reference, not a guaranteed transaction rate
    WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
    Value of useful heat (displaced gas / boiler efficiency): 0.02768 USD/kWh th · CALCULATED_VALUE · MEDIUM
    Business gas 22.257518091664434 €/MWh LHV ÷ 0.9
    2025-09 / 2026-08 · checked 2026-10-31 · Wisconsin
    WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
    Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
    Shorter than the 20-year technical life — conservative
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Official hourly labour cost, economy-wide (wages + employer costs): 46.89 USD/h · CALCULATED_VALUE · HIGH
    BLS Employer Costs for Employee Compensation, private industry, 2026-Q02: $46.89 per hour worked; converted at 1.1193 USD/EUR
    WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
    Plant operator wage relative to the economy-wide average: 0.9385 — · CALCULATED_VALUE · MEDIUM
    BLS OEWS May 2025, water & wastewater treatment plant operators, Wisconsin: mean $30.8/h ÷ ECEC private-industry wages $32.82/h (2026-Q02)
    May 2025 · checked 2026-10-31 · Wisconsin
    WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
    Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
    Inflation target + 0.5 pp wage drift
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
    Share of the bill actually avoided by self-generation: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
    TOU reference: energy/Ft portion only, demand/service charges retained. Else 85% engineering allowance. User invoice uses the generic allowance until its energy/demand split is known.
    ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity