Sample report · United States

Waste landfill owners and operators · Gas from a closed landfill

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

Closed municipal landfill with an assumed uniform deposition history. Forecasts decline annually. No US fuel-credit entitlement is assumed.

Operating assumptions

  • Operating days: 350 d/a
  • Active months: 12 1–12
  • Starting month: 1 1–12
  • CAPEX: 2,500,000 USD
  • OPEX: 220,000 USD/a
  • Residuals disposal cost: 0 USD/t
  • Upstream electricity use: 250,000 kWh/a
  • Additional process heat: 0 kWh_th/a
  • Scenario uncertainty: 35 %
  • Waste deposited per year: 100,000 t/a
  • Years of waste deposition: 20 a
  • Years since closure: 3 a
  • k: 0.08 1/a
  • L₀: 100 Nm³ CH₄/t
  • Gas collection efficiency: 50 %
  • CH₄: 50 % vol
  • N₂: 6 % vol
  • O₂: 1 % vol
  • H₂S: 500 ppmv
  • Upgrading · CAPEX: 4,000,000 USD
  • Upgrading · η CH₄: 96 % CH₄
  • Upgrading · kWh/Nm³: 0.4 kWh/Nm³ raw
  • Upgrading → CH₄: 97 % CH₄
  • Electricity: 200,000 kWh/yr · Electricity price on your bill (if known): —
  • No heat needed
  • Land available for spreading digestate: — · Distance to the gas grid (for biomethane): 3 km
  • Grid connection? Yes

What to verify

Replace k, L0 and collection efficiency with site evidence; survey the wellfield, oxygen ingress, contaminants and grid/offtake specifications.

Weak economics

Under current conditions the investment won't pay back in a reasonable time. Below is what could change that.

  • Base-case operating margin does not cover costs.
  • Even the optimistic case has a negative NPV (-US$7.5M).

Main reason — ≈ 100 % of the heat has no user, so half of the plant's energy earns nothing.

What would change the verdict
  • → Verify the inlet analysis and operating history, seasonal availability, and a supplier guarantee for the proposed treatment train.
  • → Confirm complete installed-cost quotations, residuals disposal, final effluent treatment and the energy offtake contract. Check the downside case before investment.
  • → Obtain site-specific permits and grid gas-quality requirements; extend this pre-tax screening to tax, working capital and lender cash-flow modelling.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

A clear no under these conditions: even the optimistic case does not pay back. Don't spend money on a feasibility study unless one of the changes above happens.

NPV: conservative -US$9.5M · base -US$8.3M · optimistic -US$7.5M

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
US$3.2M – US$3.4M
Payback
no payback
base: no payback · no subsidies
NPV (base)
-US$8.3M
range: -US$9.5M … -US$7.5M
Chosen route
Boiler (heat only)
Confidence: Medium

1 EUR = 1.1193 USD · ECB · 2026-11-09

Feedstock and energy

Gas from a closed landfill
100,000 t/a
Years of waste deposition: 20 a
Biogas
3.4M – 7.7M Nm³/yr
≈ 716 Nm³/h (base)
Net energy
0 MWh/yr
Useful heat
Candidate capacity
1,300 kWe
large (1–5 MW)

How far you can rely on these numbers

Medium · 75/100
  • Backed by your data and our sources75
  • You can still add+12
  • Limits of our data−3
  • Needs a feasibility study (lab, quotes, contracts)10

75/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainRoute-specific CAPEX lacks independent local validation — obtain comparable supplier quotations+8
  • Electricity price on your bill (if known) (USD/kWh)Large effectTotal of one bill divided by the kWh on it+4

With all of it: up to 87/100

Limits on our side

  • Process inputs and project budgets require document verification; ranges are assumptions, not validated accuracy.−3

These come from our country price and cost data or the screening scope, not from your project. We update them.

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Upstream budgets must include pretreatment, logistics, storage and final treatment; they are not independently verified installed quotations.
  • The treatment quotation and recovery must cover the actual H2S, siloxanes, moisture, N2 and O2. Entered product purity is a design requirement, not demonstrated gas-grid compliance.
  • No heat buyer was quantified, so the boiler route earns almost nothing: it is only the cheapest of routes that all lose money. This is not a recommendation to build it — find a heat or power buyer, or add energy-dense feedstock.
Country conditions
  • Low gas prices make biogas without credits unattractive; transport-fuel credits, not electricity savings, decide most US projects.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Possible with conditions”
  • The base-case NPV is negative (-US$8.3M).
  • Payback in the base case is no payback; it needs to be 10 yr or less.
ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 20,000 MWh a year, valued at ≈ US$0.0277 per kWh.
Weak economics-US$5M+US$3.3Mheat ≥ US$0.0623 per kWh
Order of action
  1. 1Find a heat buyer for ≈ 20,000 MWh a year (heat ≥ US$0.0623 per kWh).

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Highest installed cost at NPV = 0
not reachable
now US$3.2M

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, USD (base: -8.3M)

  1. OPEX +30 %-1.5M
  2. CAPEX +20 %-720K
  3. Maintenance +30 %-50K
  4. CH₄ −20 %0
  5. Useful heat (economic) −50 %0
  6. Feedstock potential −20 %0
  7. CHP downtime +10 pp0
  8. Energy prices −20 %65K
NPV = 0 if CAPEX falls by
not reachable
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
not reachable
relative to the base case

Scenarios

Route: Boiler (heat only). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yrUS$0
    OPEX / yrUS$460K
    • OPEX220K
    • Staff170K
    • Purchased electricity29K
    • Insurance16K
    Operating margin (EBITDA)-US$460K
    ScenariosConservativeBaseOptimistic
    Biogas, 1 000 Nm³/yr3,351.85,729.67,734.9
    CAPEXUS$3.4MUS$3.2MUS$3.2M
    OPEX / yrUS$550KUS$460KUS$380K
    Revenue + savings / yrUS$0US$0US$0
    Operating margin (EBITDA)-US$550K-US$460K-US$380K
    Simple paybackno paybackno paybackno payback
    Discounted paybackno paybackno paybackno payback
    NPV-US$9.5M-US$8.3M-US$7.5M
    IRR———
    DSCR (min)-2.5-2.1-1.8

    Pre-tax, nominal USD, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).

    Cumulative cash flow, USD
    -14M-10M-6.6M-2.9M790K03691215yearsConservativeBaseOptimistic

    Biogas use routes compared

    Base case. The model picks the route with the best NPV among technically sensible ones.

    RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
    CHP (power + heat) US$6.1M-US$170Kno payback-US$9.3M-US$12M … -US$7M
    Boiler (heat only) chosenUS$3.2M-US$460Kno payback-US$8.3M-US$9.5M … -US$7.5M
    Biomethane US$8.3M-US$390Kno payback-US$14M-US$20M … -US$5.6M
    • CHP pays when you use the power yourself and the heat is really used.
    • Biomethane: raw biogas ≈ 705 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

    National support schemes — separate cases

    Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

    Bottom line

    Support may be possible, but eligibility is not confirmed

    It improves the NPV, but the project still does not pay back its investment.

    Best option: RFS D3 RINs Details ↓

    NPV change
    +US$5.2M
    NPV with support
    -US$3.2M
    Payback
    7.5 yr
    IRR
    —

    Next step: Ask the scheme operator in writing whether your project meets the conditions the model does not check.

    Country overviewchecked 30 Oct 2026

    New RNG used as transport fuel earns federal RFS D3 RINs (realised ≈ $2.45–2.50 in Q2 2026, volatile); manure RNG piped into California can also earn LCFS credits (book-and-claim). The 45Z credit applies to fuel sold by the end of 2029; from 2026 only manure RNG may have a negative carbon intensity (rates for dairy and swine manure are published, beef and poultry pending; IRS Notice 2026-53). It is not included in the support cases. The biogas ITC and REAP digester support are closed.

    Open for applications (2)

    You can apply now on the published terms.

    RFS D3 RINs

    Open
    Biomethane support
    Eligibility to confirm
    Eligibility of landfill gas is not modelled: shown "if eligible". Confirm the gas-source category, tariff and any existing support with the scheme operator.
    NPV change
    +US$5.2M
    NPV with support
    -US$3.2M
    Payback
    7.5 yr
    IRR
    —
    Conditions
    • met: Raw biogas for upgrading from 60 Nm³/h (project ≈ 705 Nm³/h)
    • no data: Gas-source category accepted by the scheme
    Not checked by the model — confirm with the operator:
    • no data: Contracts showing the RNG is used as transport fuel (RFS)
    • no data: D3 RINs only for gas from manure, crop residues, wastewater sludge or landfills; gas from food waste and other non-cellulosic streams earns the lower-priced D5 RIN, and a co-digester splits its RINs by the cellulosic share (RFS)
    What the case uses
    • Route: Biomethane
    • Biomethane price: US$0.761/Nm³
    Scheme terms

    $3/MMBtu gas + 75 % of D3 RINs at a conservative $2.00 (11.73 RIN/MMBtu) ≈ $0.75/Nm³; transport-fuel offtake required.

    Next step: Ask the scheme operator in writing whether your project meets the conditions the model does not check.

    Source: 40 CFR 80.1415; realised D3 $2.45–2.50/RIN in Q2 2026 (Montauk, OPAL SEC filings); EPA EMTS RIN price data · checked 30 Oct 2026 · Data confidence: Medium

    RFS D3 + California LCFS (manure RNG)

    Open
    Biomethane support
    Does not qualify
    Manure is 0 % of the mass; the scheme requires ≥ 50 %.

    Not calculated: the project does not meet the conditions.

    Conditions
    • not met: Manure at least 50 % of fresh mass (project 0 %)
    • met: Raw biogas for upgrading from 60 Nm³/h (project ≈ 705 Nm³/h)
    • no data: Gas-source category accepted by the scheme
    Not checked by the model — confirm with the operator:
    • no data: CARB pathway carbon intensity and a transport-fuel contract
    What the case uses
    • Route: Biomethane
    • Biomethane price: US$1.16/Nm³
    Scheme terms

    Gas $3 + 75 % × (D3 $2.00 + LCFS at CI −150 g/MJ, $70/t, 2027 benchmark) ≈ $1.15/Nm³; range $0.81–2.06. Avoided-methane credit for 2 × 10 years if built before 2030.

    Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

    Source: CARB LCFS regulation (2024 amendments, eff. 2025-07-01) §95484, §95486.1, §95488.9; CARB monthly credit reports Oct 2025 – Sep 2026 ($55–81/t) · checked 30 Oct 2026 · Data confidence: Low

    Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

    Where the energy goes

    Heat produced ≠ useful heat. Heat without a user isn't income.

    0/100

    Of every 100 kWh of energy in the methane, 0 become a product that earns money or replaces a purchase.

    100 % = 29,000 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

    Stream by stream

    Calculated

    Produced, not used

    • Heat with no buyer25,000 MWh 89 %

    Losses

    • Conversion losses (engine, boiler)2,800 MWh 10 %
    • Methane leaks430 MWh 2 %

    What this means for the project

    • 25,000 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income.
    • Methane leaks are 1 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

    What the figures rest on

    Heat need
    no heat userYour data
    Methane leaks, base case
    1 %Assumption

    How it works: from feedstock to products

    Heat produced (gross)
    25,320 MWh
    Digester heat demand
    0 MWh
    Useful heat (economic)
    0 MWh of 25,320
    Power: own use / sold
    0 / 0 MWh

    Scores by dimension

    No single magic number. The overall score comes with its explanation.

    Feedstock fit
    100/100
    • Energy equivalent ≈ 1266 kWe (scale score 100/100)
    • Process-specific inlet basis; no generic feedstock energy-density score.
    • Feedstock available 12 of 12 months
    Energy fit
    0/100
    • Own consumption absorbs 0 % of the electricity produced
    • Useful heat 0 MWh of 25320 MWh available after digester needs
    Location & logistics
    100/100
    • Land for digestate unknown
    Technical feasibility
    100/100
    • Standard layout for this scale, no critical obstacles
    Economics
    0/100
    • Operating margin ≤ 0 — no payback
    • Base-case NPV is negative
    • Minimum DSCR -2.13 — below the usual bank threshold of 1.2–1.3
    Regulatory complexity
    18/100 risk
    • Number and weight of permitting / regulatory steps: 9 points (more = harder)
    Environmental risk
    20/100 risk
    • Expected methane loss 1.5 % — within good practice if gas-tight and monitored
    • Unknown where the digestate will go
    Overall project viability
    40/100
    • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
    • Capped at 40: weak economics is not offset by other factors.
    • Strongest: Feedstock fit (100); weakest: Economics (0).

    Calculation details

    Gas from a closed landfill

    Leave unknown costs and auxiliary loads blank. Economics require these inputs.

    L₀(t)
    82,693,000 Nm³ CH₄
    L₀(t + 1)
    76,717,900 Nm³ CH₄
    M
    2,000,000 t
    CH₄ → CHP / Upgrading / Boiler
    2,864,780 Nm³ CH₄/a
    CH₄ loss
    3,110,330 Nm³ CH₄/a
    CH₄ total
    5,975,110 Nm³ CH₄/a
    m residual
    0 t/a

    Enter the project budget for the upstream process, including pretreatment, logistics, storage and final treatment. Gas conversion equipment and energy are calculated separately. Enter zero only for a confirmed zero cost. Exclude from this budget; calculated separately: residuals disposal cost, biogas purchase price.

    Technology & digester

    LFG / FOD

      Climate: Wisconsin (Green Bay), mean 8.8 °C, ≈ 3,662 heating degree-days. Closest climate analogues: Vilnius (LT) (Δ 2.5 °C), Rzeszów (PL) (Δ 2.6 °C), Kraków (PL) (Δ 2.9 °C).

      Monthly energy balance

      Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

      MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
      Jan02,388000
      Feb02,176000
      Mar02,388000
      Apr02,311000
      May02,388000
      Jun02,311000
      Jul02,388000
      Aug02,388000
      Sept02,311000
      Oct02,388000
      Nov02,311000
      Dec02,388000
      Σ028,133000
      CAPEX, OPEX, revenue (base case)
      CAPEX (USD)
      Gas from a closed landfill2.5M
      Gas handling and cleaning140K
      Boiler (heat only)390K
      Electrical systems and controls31K
      Pipework21K
      Civil works31K
      Grid connection12K
      Engineering and permits50K
      Contingency67K
      Total3.2M
      OPEX / yr (USD)
      Staff170K
      Maintenance15K
      Insurance16K
      Testing and monitoring5.6K
      Purchased electricity29K
      OPEX220K
      Total460K
      Revenue + savings / yr (USD)
      Total0

      Unit costs are estimates. Replace them with supplier quotations.

      Digestate and residues

      No digestate: the project uses gas from an existing source; residues stay with the existing site.

      Methane losses & climate

      Expected losses: 1.5 % of methane produced (range 0.5 % – 3 %) ≈ 832 t CO₂e/yr; fossil emissions displaced ≈ 0 t CO₂/yr.

      Methane not captured by the project: ≈ 3,110,332 Nm³ CH₄/yr. It is outside the plant loss figure above.

      • Methane losses could cancel the climate benefit. Do not claim emission reductions without measurements.
      • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
      • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
      • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
      • CHP with an oxidation catalyst and tuning regime to cut methane slip.

      Avoided emissions from open manure storage are not credited (conservative).

      Permits & regulation (indicative)

      Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

      • State air permit (CHP/flare) and possibly Title V; EPA NSPS/NESHAP for engines
        Combustion of biogas · effort: medium · to verify
      • CAFO / NPDES and state nutrient-management plan for digestate
        Manure / digestate land application · effort: medium · to verify
      • County zoning / conditional-use permit and building permits
        New installation · effort: medium · to verify
      • Confirm landfill permit, gas collection obligations and aftercare responsibilities
        Process-specific site conditions; no automatic legal eligibility · effort: high · to verify
      Safety (risk register)
      • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
        • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
        • Fixed gas detectors in the CHP room and near tanks
        • Flame arresters, over/under-pressure relief, safety flare
        • Ignition-source control and hot-work permits
      • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
        • Biological / chemical desulphurisation of the biogas
        • Personal H₂S monitors, no lone working
        • H₂S monitoring upstream of the CHP (engine protection)
      • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
        • Entry only under permit, ventilation, standby person
        • Self-contained breathing apparatus for rescue
      • Over/under-pressure: membrane roof rupture, tank deformation medium
        • Liquid seals / relief valves venting to a safe location
        • Gas-holder level and pressure sensors
      • CHP: carbon monoxide, fire, high temperatures medium
        • CHP room ventilation, CO detectors
        • Emergency stop, fire suppression
      • Soil and water pollution: slurry/digestate spills, lagoon overflow high
        • Bund sized for the largest tank
        • Level sensors and a spill-response plan
        • Digestate storage covering the closed spreading season

      Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

      Assumptions used (95)

      Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

      • Support: New RNG used as transport fuel earns federal RFS D3 RINs (realised ≈ $2.45–2.50 in Q2 2026, volatile); manure RNG piped into California can also earn LCFS credits (book-and-claim). The 45Z credit applies to fuel sold by the end of 2029; from 2026 only manure RNG may have a negative carbon intensity (rates for dairy and swine manure are published, beef and poultry pending; IRS Notice 2026-53). It is not included in the support cases. The biogas ITC and REAP digester support are closed.
      • Low gas prices make biogas without credits unattractive; transport-fuel credits, not electricity savings, decide most US projects.
      • The verdict excludes subsidies; national support is shown as separate cases.
      • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
      • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
      • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

      Illustrative project assumptions, not an operator account or supplier quotation; k 0.075 for Wisconsin rainfall ≈ 865 mm/a (NOAA 1991–2020) per the form help (Jain et al. 2021)

      • Operating days: 350 d/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Active months: 12 1–12 · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Starting month: 1 1–12 · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • CAPEX: 2,500,000 USD · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • OPEX: 220,000 USD/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Residuals disposal cost: 0 USD/t · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Upstream electricity use: 250,000 kWh/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Additional process heat: 0 kWh_th/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Scenario uncertainty: 35 % · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • N₂: 6 % vol · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • O₂: 1 % vol · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • H₂S: 500 ppmv · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Upgrading · CAPEX: 4,000,000 USD · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Upgrading · η CH₄: 96 % CH₄ · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Upgrading · kWh/Nm³: 0.4 kWh/Nm³ raw · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Upgrading → CH₄: 97 % CH₄ · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Waste deposited per year: 100,000 t/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Years of waste deposition: 20 a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Years since closure: 3 a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • k: 0.075 1/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • L₀: 100 Nm³ CH₄/t · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Gas collection efficiency: 50 % · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • CH₄: 50 % vol · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · US
      • Annual integral of first-order decay: 0.075 1/a · ENGINEERING_ASSUMPTION · LOW · 2021-07-01 · US · https://www.epa.gov/system/files/documents/2021-07/pdh_chapter2.pdf

      What could break the economics

      Each stress test applied to the base case on its own.

      boiler: local CAPEX factor
      0.742 … 1.378 —
      NPV low…high: -US$8.6M … -US$8.1M
      Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
      0.051 … 0.081 —
      NPV low…high: -US$8.7M … -US$7.7M
      Business electricity reference, excl. VAT (default if the customer gives none)
      0.096 … 0.1373 USD/kWh
      NPV low…high: -US$8.3M … -US$8.3M
      k
      0.04875 … 0.1013
      NPV low…high: -US$8.4M … -US$8.1M
      L₀
      65 … 135
      NPV low…high: -US$9.1M … -US$7.5M
      Gas collection efficiency
      32.5 … 67.5
      NPV low…high: -US$9.1M … -US$7.5M
      OPEX
      143,000 … 297,000
      NPV low…high: -US$9.2M … -US$7.5M
      Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
      Biomethane price without support, base: 0.2239 USD/Nm³ · CALCULATED_VALUE · LOW
      National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
      WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
      boiler: local CAPEX factor: 1.06 — · CALCULATED_VALUE · LOW
      0.72 traded equipment + 0.28 × local/German labour cost (38.4/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
      ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
      Debt interest rate (EUR-equivalent): 0.046 — · CALCULATED_VALUE · MEDIUM
      Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
      WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
      Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
      Typical agri / project lending (KfW, EBRD, IFC practice)
      ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
      Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
      Typical
      ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
      Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.061 — · CALCULATED_VALUE · MEDIUM
      Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.22 % (Aa1; Damodaran, 2026-07); not a bank offer
      2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
      WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
      Business electricity reference, excl. VAT (default if the customer gives none): 0.1167 USD/kWh · CALCULATED_VALUE · MEDIUM
      EIA Electric Power Monthly 5.6.B, Wisconsin, 2026-01/2026-08: commercial 13.73 ¢, industrial 9.60 ¢/kWh → midpoint for farms and food processors, excl. taxes; converted at 1.1193 USD/EUR
      2026-01/2026-08 · checked 2026-10-31 · Wisconsin; sector averages, not the customer's tariff
      WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
      Wholesale electricity price (market average): 0.05264 USD/kWh · CALCULATED_VALUE · MEDIUM
      EIA STEO table 7a: Midcontinent ISO Illinois hub, 2025-10 – 2026-09 mean $52.64/MWh (hub serving Wisconsin); converted at 1.1193 USD/EUR
      2025-10-01 / 2026-09-30 · checked 2026-10-31 · Wholesale hub assigned to Wisconsin; not a guaranteed export price
      WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
      Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
      At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
      ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
      Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
      15 % profile & balancing discount for a small seller (assumption, same for all markets)
      ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
      Exchange rate: 1.119 USD/EUR · MARKET_DATA · HIGH
      Official EUR reference rate, 2026-11-09
      2026-11-09 · checked 2026-11-10 · USD per EUR; dated reference, not a guaranteed transaction rate
      WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
      Value of useful heat (displaced gas / boiler efficiency): 0.02768 USD/kWh th · CALCULATED_VALUE · MEDIUM
      Business gas 22.257518091664434 €/MWh LHV ÷ 0.9
      2025-09 / 2026-08 · checked 2026-10-31 · Wisconsin
      WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
      Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
      Shorter than the 20-year technical life — conservative
      ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
      Official hourly labour cost, economy-wide (wages + employer costs): 46.89 USD/h · CALCULATED_VALUE · HIGH
      BLS Employer Costs for Employee Compensation, private industry, 2026-Q02: $46.89 per hour worked; converted at 1.1193 USD/EUR
      WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
      Plant operator wage relative to the economy-wide average: 0.9385 — · CALCULATED_VALUE · MEDIUM
      BLS OEWS May 2025, water & wastewater treatment plant operators, Wisconsin: mean $30.8/h ÷ ECEC private-industry wages $32.82/h (2026-Q02)
      May 2025 · checked 2026-10-31 · Wisconsin
      WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
      Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
      Inflation target + 0.5 pp wage drift
      ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
      Share of the bill actually avoided by self-generation: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
      TOU reference: energy/Ft portion only, demand/service charges retained. Else 85% engineering allowance. User invoice uses the generic allowance until its energy/demand split is known.
      ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity