Business situation

A Vinnytsia sugar factory considers year-round digestion of 90,000 t of pressed beet pulp using existing silage infrastructure.

Operating assumptions

  • Pressed sugar-beet pulp (ensiled): 90,000 t/yr · DM: 23 % · 12 months · We sell it (e.g. as feed) · What you sell it for today: 200 UAH/t
  • Electricity: 20,000,000 kWh/yr · Electricity price on your bill (if known): 8.6 UAH/kWh
  • Winter: space heating · We use natural gas: 9,000,000 m³/yr · Gas price (if known): 22 UAH/m³
  • Land available for spreading digestate: 8,000 ha · Distance to the gas grid (for biomethane): 1 km
  • Existing lagoon / store that could be covered: 60,000 m³
  • Grid connection? Yes

What to verify

Survey silage clamps, losses and leachate; meter campaign heat demand. Confirm that local energy prices, grid capacity and spreading agreements apply to this site.

Strong candidate

Worth detailed work: the project holds up even under conservative assumptions.

  • Simple payback ≈ 2.6 yrs (base) and ≈ 5.4 yrs in the conservative case; base NPV €11M; minimum DSCR 3.82.

Largest benefit — “electricity savings (self-consumption)”: ≈ 62 % of all revenue and savings.

What would change the verdict
  • → Confirm with a laboratory feedstock analysis (BMP) and real energy invoices.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

Robust: profitable even in the conservative case (lower gas yield, higher CAPEX, lower prices). The next step is worth paying for.

NPV: conservative €950K · base €11M · optimistic €16M

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in > 99 % of cases.

Biggest drivers of the result (stress tests):
  1. Get an offer for exported power (PPA or tariff) · Energy prices −20 % (-€4.7M)
  2. CH₄ −20 % · Already entered (-€3.2M)
  3. Feedstock potential −20 % (-€2.7M)

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

To reach a bankable estimate (±15 %)
  1. Laboratory methane-potential (BMP) test of 2–3 feedstock samples — ≈ €300–800 each · Already entered
  2. 2–3 supplier quotes for the plant
  3. Grid or gas-network connection conditions from the operator
  4. Letters of intent for feedstock supply and for heat, power or biomethane offtake
  5. Then a feasibility study with permits and financing (±15 %)
From screening to construction

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€7.1M – €9.5M
≈ UAH 400M (base)
Payback
1.9 yr – 5.4 yr
base: 2.6 yr · no subsidies
NPV (base)
€11M
range: €950K … €16M
Chosen route
CHP (power + heat)
Confidence: Medium

Feedstock and energy

Feedstock potential
90,000 t/yr
energy ≈ 707 kWh CH₄/t
Biogas
9.7M – 13M Nm³/yr
≈ 1,534 Nm³/h (base)
Net energy
19,000 – 26,000 MWh/yr
useful heat: 7,400 – 16,000 MWh · ≈ 85 % of your electricity use
Candidate capacity
3,400 kWe
large (1–5 MW)

How far you can rely on these numbers

Medium · 82/100
  • Backed by your data and our sources82
  • You can still add+8
  • Needs a feasibility study (lab, quotes, contracts)10

82/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainRoute-specific CAPEX lacks independent local validation — obtain comparable supplier quotations+8

With all of it: up to 90/100

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • CHP performance uses a 50 Hz biogas full-load catalogue reference (03/2025), interpolated between ratings; part-load and ambient derating require supplier confirmation.
  • CHP rating is outside the 20–2,300 kW reference curve; endpoint efficiency is only a proxy. Obtain a multi-engine or equipment-specific design.
Country conditions
  • No subsidy for new small plants: the case rests on own electricity and heat, avoided disposal and energy resilience. Biomethane export to the EU (ISCC) is open to large producers.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 4,700 MWh a year, valued at ≈ UAH 2.57 per kWh.
Strong candidate€12M+€1.5Mheat ≥ UAH 1.87 per kWh
Order of action
  1. 1Find a heat buyer for ≈ 4,700 MWh a year (heat ≥ UAH 1.87 per kWh).
  2. 2Ask 3–5 suppliers for quotes: the project breaks even up to an investment of €17M. →

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Check how your bill splits energy and capacity charges€8M … €13M—
Get supplier quotes for the plant€8.1M … €13M—
Verify the market price€8.9M … €12M—
Confirm a reliable heat buyer and demand€9.7M … €11M—
Fix feedstock prices and gate fees in contracts€10M … €11M—
Check the fertiliser value of the digestate€11M … €11M—
How to check: Check how your bill splits energy and capacity charges
  1. Take the last 12 electricity invoices.
  2. Split each into the energy part (per kWh) and capacity, network and fixed charges; own generation saves mainly the energy part.

Then enter it in: Energy step: electricity price per kWh (energy part, excl. VAT)

How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Ukraine.
Feedstock (screening values, to be confirmed):
- pressed sugar-beet pulp (ensiled): 90,000 t/year, DM ≈ 23.0 %
Design basis from the screening: raw biogas ≈ 1,500 Nm³/h at ≈ 52 % CH₄; digester working volume ≈ 15,000 m³; combined heat and power ≈ 3,400 kWe; new digestate storage ≈ 0 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Confirm a reliable heat buyer and demand
  1. Confirm the buyer's monthly heat demand and the temperature they need.
  2. Agree a price per kWh linked to their current fuel, and a term of at least the loan period.
Request to send
Offer of renewable heat
Site: Ukraine. A biogas plant can supply ≈ 22,000 MWh of heat a year (hot water, ≈ 80–90 °C) all year round. Please tell us your monthly heat use, the temperature you need, your current fuel and its price, and the price per kWh and term you would accept.

Then enter it in: Energy step: price the heat buyer pays per kWh

How to check: Fix feedstock prices and gate fees in contracts
  1. For every purchased stream and every gate fee, note today's price and its range over the last three years.
  2. Fix prices or gate fees with indexation for the loan period, and check that the plan still pays with prices 25 % worse.
Request to send
Request for a feedstock supply agreement
Site: Ukraine. A biogas plant would take:
- pressed sugar-beet pulp (ensiled): 90,000 t/year, DM ≈ 23.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Electricity value at NPV = 0
€0.0566/kWh
now €0.127/kWh
Highest installed cost at NPV = 0
€17M
now €7.9M
Feedstock price headroom
€17.6/t
can pay up to €17.6 per tonne more for every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
€7M
Median NPV
€9.3M
NPV P90 (1 in 10 better)
€11M
Chance that NPV > 0
> 99 %
Median payback
2.8 yr

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: 11M)

  1. Energy prices −20 %-4.7M
  2. CH₄ −20 %-3.2M
  3. Feedstock potential −20 %-2.7M
  4. Useful heat (economic) −50 %-2M
  5. CHP downtime +10 pp-1.9M
  6. CAPEX +20 %-1.8M
  7. Maintenance +30 %-660K
  8. Feedstock transport +50 %0
NPV = 0 if CAPEX falls by
already positive
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
already positive
relative to the base case

Scenarios

Route: CHP (power + heat). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€3.9M
  • Electricity self-consumption savings2.4M
  • Electricity sales660K
  • Useful heat (economic)640K
  • Incremental digestate value190K
OPEX / yr€890K
  • Foregone alternative revenue350K
  • CHP service and overhaul reserve220K
  • Digestate handling120K
  • Maintenance100K
Operating margin (EBITDA)€3.1M
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr9,650.612,268.713,250.2
CAPEX€9.5M€7.9M€7.1M
OPEX / yr€920K€890K€840K
Revenue + savings / yr€2.7M€3.9M€4.7M
Operating margin (EBITDA)€1.8M€3.1M€3.8M
Simple payback5.4 yr2.6 yr1.9 yr
Discounted payback11.9 yr3.9 yr2.7 yr
NPV€950K€11M€16M
IRR16.8 %36.7 %50 %
DSCR (min)1.83.85.3

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 50 % debt (no taxes).

Cumulative cash flow, €
-14M5.1M24M42M61M03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) chosen€7.9M€3.1M2.6 yr€11M€950K … €16M
Boiler (heat only) €4.5M€650K6.9 yr-€910K-€7.3M … €3.9M
Biomethane €7.7M€2.5M3.1 yr€6.9M-€9.8M … €21M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 1,437 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 45,000CHP (power + heat)1,690€4.6M€5.7M
× 0.75 68,000CHP (power + heat)2,550€6.3M€9M
× 1 your input90,000CHP (power + heat)3,400€7.9M€11M
× 1.5 140,000CHP (power + heat)5,100€11M€14M
× 2 180,000CHP (power + heat)6,800€15M€16M
× 3 270,000Biomethane8,458€21M€24M

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

There is a scheme, but support is awarded by competition

On the scheme's terms the NPV is above zero.

Best option: Аукціон з ринковою премією (інші ВДЕ) — market-premium auction Details ↓

NPV change
+€990K
NPV with support
€12M
Payback
2.4 yr
IRR
38.9 %

Next step: Prepare for the next round: permits are usually required before you bid, and an award is not guaranteed.

Country overviewchecked 30 Oct 2026

The only route for new plants is market-premium auctions (bid cap 12 €c/kWh; the 'other RES' lot of 30.10.2026 did not take place; indicative biogas quotas 21–29 MW a year for 2027–2030). The green tariff ends on 01.01.2030 and has no EUR floor for plants commissioned after 2024. Biomethane: export, no subsidy.

Running, awarded by competition (1)

Support goes to the winners of a round or auction. The case assumes an award at the stated value.

Аукціон з ринковою премією (інші ВДЕ) — market-premium auction

Competitive
Electricity tariff
Meets every condition we checked
NPV change
+€990K
NPV with support
€12M
Payback
2.4 yr
IRR
38.9 %
Conditions
  • met: CHP of a practical size, from 25 kW (project ≈ 3,400 kW)
What the case uses
  • Route: CHP (power + heat)
  • Tariff: €0.12/kWh
Scheme terms

Bid cap 12 €c/kWh; your own winning bid is guaranteed via a market premium. The 30.10.2026 lot did not take place (Prozorro).

Next step: Prepare for the next round: permits are usually required before you bid, and an award is not guaranteed.

Source: Guaranteed Buyer notice 03.09.2026 (150 MW, cap 12 €c); Prozorro: auction did not take place; CMU order 298-р (508-р); Law 555-IV Art. 9-3 · checked 30 Oct 2026 · Data confidence: Low

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

58/100

Of every 100 kWh of energy in the methane, 58 become a product that earns money or replaces a purchase.

100 % = 64,000 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Electricity sold to the grid7,600 MWh 12 %
  • Electricity used on site17,000 MWh 27 %
  • Heat for a user13,000 MWh 20 %

Runs the plant

  • Plant’s own electricity2,000 MWh 3 %
  • Digester heating2,700 MWh 4 %

Produced, not used

  • Heat with no buyer9,100 MWh 14 %

Losses

  • Conversion losses (engine, boiler)10,000 MWh 16 %
  • Gas sent to the flare1,500 MWh 2 %
  • Methane leaks950 MWh 2 %

What this means for the project

  • 9,100 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income. At the heat value used in this case that is about €460K a year.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Engine efficiency: electricity / heat
43 % / 43 %Assumption
Heat need
9,000,000 m³Your data
Site electricity use
20,000 MWhYour data
Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
19,000 – 26,000 MWhCalculated

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 5 % of that month’s methane energy, in July 3 %.

January: methane energy 5,300 MWh · digester heating 280 MWh (5 %) · heat for a user 1,400 MWh

  • Methane energy of the month
  • Digester heating
  • Heat for a user

How it works: from feedstock to products

  1. Feedstock90,000 t/yr
  2. Biogas12M Nm³/yr
  3. Electricity25,000 MWh
  4. Useful heat13,000 MWh
  5. Heat without demand9,100 MWh
  6. Digestate74,000 t/yr
Heat produced (gross)
24,431 MWh
Digester heat demand
2,740 MWh
Useful heat (economic)
12,623 MWh of 21,692
Power: own use / sold
17,000 / 7,551 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
26 g CO₂e/MJ
gas-tight digestate storage
Fossil comparator
183 g CO₂e/MJ
Greenhouse-gas saving
86 %
RED minimum: 80 %
Avoided emissions
17,131 t CO₂e
  • Meets the RED minimum.
  • RED sustainability criteria apply (rated input ≥ 2 MW).
  • Residues other than manure, maize and food waste use the RED biowaste values.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
96/100
  • Energy equivalent ≈ 3400 kWe (scale score 100/100)
  • Feedstock energy ≈ 707 kWh of methane per tonne (score 80/100)
  • Feedstock available 12 of 12 months
Energy fit
74/100
  • Own consumption absorbs 69 % of the electricity produced
  • Useful heat 12623 MWh of 21692 MWh available after digester needs
Location & logistics
100/100
  • No critical site constraints found from your answers
Technical feasibility
100/100
  • Standard layout for this scale, no critical obstacles
Economics
100/100
  • Base-case simple payback ≈ 2.6 years
  • NPV positive even in the conservative case
Regulatory complexity
36/100 risk
  • Number and weight of permitting / regulatory steps: 13 points (more = harder)
Environmental risk
24/100 risk
  • Expected methane loss 2.5 % (good practice ≤ 2 %)
Overall project viability
91/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Location & logistics (100); weakest: Regulatory complexity (64).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Pressed sugar-beet pulp (ensiled)90,0002370.9on site≈ 186 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Wet mesophilic digestion with solids feeding

CSTR with a solids feeder and recirculation, or horizontal plug-flow for dairy manure

Working volume
≈ 15,000 m³
Retention time
60.5 days
Loading rate
3.5 kg VS/(m³·d)
Digestate storage
≈ 37,000 m³
  • Dry matter 23 % is above the pumpable limit without a solids feeder (12 %).
  • Continuous feed — continuous operation gives steady gas and the simplest control.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Two-stage layout (main + post-digester) for stability with fats or larger flows.
Alternatives
  • Horizontal plug-flow (good for 10–14 % DM cattle manure)

Climate: Vinnytsia oblast, mean 9.8 °C, ≈ 3,206 heating degree-days. Closest climate analogues: Kraków (PL) (Δ 1 °C), Prague (CZ) (Δ 1.1 °C), Rzeszów (PL) (Δ 1.1 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan7,6395,3172751,4392,084
Feb6,9614,8462491,3131,899
Mar7,6395,3172671,4452,084
Apr7,3925,1462291,4222,016
May7,6395,3172131,4882,084
Jun7,3925,14617802,016
Jul7,6395,31717902,084
Aug7,6395,31717902,084
Sept7,3925,1461991,2102,016
Oct7,6395,3172391,4682,084
Nov7,3925,1462601,3972,016
Dec7,6395,3172731,4402,084
Σ90,00062,6522,74012,62324,551
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester1.6M
Covering existing storage460K
Feedstock reception and preparation130K
Gas handling and cleaning180K
CHP (power + heat)2.9M
Heat network310K
Backup boiler18K
Electrical systems and controls340K
Pipework220K
Civil works340K
Grid connection190K
Engineering and permits530K
Contingency720K
Total7.9M
OPEX / yr (EUR)
Staff45K
CHP service and overhaul reserve220K
Maintenance100K
Insurance40K
Testing and monitoring5K
Foregone alternative revenue350K
Digestate handling120K
Total890K
Revenue + savings / yr (EUR)
Electricity self-consumption savings2.4M
Electricity sales660K
Useful heat (economic)640K
Incremental digestate value190K
Total3.9M

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: asset · 73,783 t/yr · nitrogen ≈ 204,844 kg/yr · land needed ≈ 1,205 ha (available 8,000 ha).

Incremental fertiliser value €190K/yr, handling €120K/yr, net €76K/yr.

  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 2.5 % of methane produced (range 1.6 % – 4 %) ≈ 3,098 t CO₂e/yr; fossil emissions displaced ≈ 8,688 t CO₂/yr. Losses vs benefit: 36 %.

  • Expected loss 2.5 % is above good practice (2 %): budget for monitoring.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: medium. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Urban-planning conditions and construction permit (consequence class to be confirmed)
    New installation · effort: medium · to verify
  • Environmental impact assessment / screening (thresholds to be confirmed)
    Biogas plant as an organic-waste facility · effort: medium · to verify
  • Registration of high-hazard equipment and gas-system expert review
    Gas holders, CHP under pressure · effort: medium · to verify
  • Fire safety and explosion-hazard zoning
    Methane in the gas phase · effort: medium · to verify
  • Air-emission permit for stationary sources (CHP, flare)
    Biogas combustion · effort: lower · to verify
  • Digestate use as fertiliser: status under the pesticides & agrochemicals law and application rules
    Digestate goes to fields · effort: medium · to verify
  • Generator licence/registration and grid-connection agreement
    Electricity export · effort: medium · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (162)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: The only route for new plants is market-premium auctions (bid cap 12 €c/kWh; the 'other RES' lot of 30.10.2026 did not take place; indicative biogas quotas 21–29 MW a year for 2027–2030). The green tariff ends on 01.01.2030 and has no EUR floor for plants commissioned after 2024. Biomethane: export, no subsidy.
  • No subsidy for new small plants: the case rests on own electricity and heat, avoided disposal and energy resilience. Biomethane export to the EU (ISCC) is open to large producers.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

CHP: local CAPEX factor
0.595 … 1.105 —
NPV low…high: €8.1M … €13M
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country & war risk)
0.139 … 0.169 —
NPV low…high: €8.9M … €12M
Mineral potassium price
0.713 … 0.8099 EUR/kg K₂O
NPV low…high: €11M … €11M
Mineral nitrogen price
1.045 … 1.818 EUR/kg N
NPV low…high: €11M … €11M
Mineral phosphorus price
1.419 … 1.847 EUR/kg P₂O₅
NPV low…high: €11M … €11M
Avoidable share of an unsplit customer electricity bill
0.7 … 1 —
NPV low…high: €8M … €13M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base (EU export netback): 0.68 EUR/Nm³ · CALCULATED_VALUE · LOW
EU export: TTF 46.49 €/MWh HHV × 1.11 HHV/LHV + 20 €/MWh LHV green-gas premium (engineering assumption, no official GO price); World Bank Pink Sheet (2026-10-02), Natural gas Europe (TTF), mean Q4 2025 – Q3 2026 15.25 $/mmbtu GCV ÷ 0.2931 MWh/mmbtu at 1.1193 USD/EUR; minus Ukrainian GTS exit tariff 1.5113 EUR/MWh HHV (NEURC 2387); × 9.67 kWh/Nm³. EU entry, onward transport and certification not deducted; no guaranteed offtake
2025-07 / 2026-06 · checked 2026-11-11 · Unsupported biomethane: domestic gas parity (conservative) or EU export netback (base); exports were 65 % of Ukrainian biomethane in Q2 2026
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
CHP: local CAPEX factor: 0.85 — · CALCULATED_VALUE · LOW
Provisional fit to published Ukrainian CHP projects; no independent validation. Does not calibrate upgrading/injection costs or quantify war-risk construction premiums.
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR): 0.1 — · ENGINEERING_ASSUMPTION · LOW
Indicative financing assumption informed by EBRD / IFC-backed credit programmes; not a bank term sheet
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt share for DSCR test: 0.5 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical EBRD/IFI-style lending for agrifood
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 7 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical for agri/energy credit lines (EBRD, IFC, EIB programmes)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 3.6 EUR/t · CALCULATED_VALUE · MEDIUM
2.5 €/t + 0.22 h/t × 4.9 €/h labour (same formula as every market)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 1.6 EUR/t · CALCULATED_VALUE · MEDIUM
1.2 €/t machinery + 0.08 h/t × 4.9 €/h labour (same formula as every market)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country & war risk): 0.149 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 14.85 % (Ca; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.1255 EUR/kWh · CALCULATED_VALUE · MEDIUM
Market Operator (OREE), DAM BASE index, IPS of Ukraine, mean of monthly values Oct 2025 – Sep 2026: 6 377 UAH/MWh excl. VAT; converted at 50.8152 UAH/EUR (2026-11-10)
2026-09-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 6.377 UAH (ENGINEERING_ASSUMPTION); FX (2026-11-10): 50.82 UAH/EUR (MARKET_DATA)
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
Conservative; UAH price rises offset by depreciation (EUR terms)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
30 % profile & balancing discount for a small seller (assumption)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 50.82 UAH/EUR · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-10
2026-11-10 · checked 2026-11-10 · UAH per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-y technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Historical hourly labour-cost reference (wages + employer costs): 4.975 EUR/h · CALCULATED_VALUE · MEDIUM
Derzhstat: average wage of full-time employees Sep 2026 33 153 UAH/month × 1.22 employer contributions ÷ 160 h; skilled operator premium 1.14; converted at 50.8152 UAH/EUR (2026-11-10)
2026-09-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 252.8 UAH (ENGINEERING_ASSUMPTION); FX (2026-11-10): 50.82 UAH/EUR (MARKET_DATA)
Plant operator wage relative to the economy-wide average: 1.14 — · ENGINEERING_ASSUMPTION · MEDIUM
Skilled plant operator ≈ 30 k UAH/month gross vs the 26.5 k average → ≈ 4.9 €/h operator cost
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.03 — · ENGINEERING_ASSUMPTION · MEDIUM
Wage growth > CPI in UA (NBU inflation report)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of liquid/solid organic feedstock: 0.11 EUR/(t·km) · ENGINEERING_ASSUMPTION · LOW
Tanker/tipper rate incl. empty return; diesel-driven; TO VERIFY with 3 hauliers
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Loading/unloading per tonne: 0.7 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × 4.9 €/h labour (same KTBL-based formula as every market)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.1692 EUR/kWh · USER_INPUT · MEDIUM
USER_INPUT 8.6 UAH/kWh / FX 50.8152; Official EUR reference rate, 2026-11-10. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
Useful heat displaced at customer gas price: 0.05064 EUR/kWh th · USER_INPUT · MEDIUM
USER_INPUT 22 UAH/m3 / assumed natural-gas LHV / boiler efficiency / FX 50.8152. Not independently verified (no contract or invoice date supplied).
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
sugar_beet_pulp_pressed: dry matter: 23 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
sugar_beet_pulp_pressed: volatile solids: 92 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
sugar_beet_pulp_pressed: BMP (scenarios ± inter-laboratory spread): 335 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.