Business situation

Hypothetical Swedish RAS sludge project. NIBIO research establishes resource potential, not an operating Swedish commercial project. Inputs are assumptions requiring site sampling.

Operating assumptions

  • Operating days: 350 d/a
  • Active months: 12 1–12
  • Starting month: 1 1–12
  • CAPEX: 12,000,000 SEK
  • OPEX: 800,000 SEK/a
  • Residuals disposal cost: 150 SEK/t
  • Upstream electricity use: 150,000 kWh/a
  • Additional process heat: 0 kWh_th/a
  • Scenario uncertainty: 40 %
  • Collected wet material: 5,000 t/a
  • ρ = m/V: 1,000 kg/m³
  • DM / TS: 6 % FM
  • VS / DM: 75 % DM
  • BMP: 280 L CH₄/kg VS
  • CH₄: 60 % vol
  • N: 4 kg N/t FM
  • HRT: 40 d
  • OLR: 2 kg/(m³·d)
  • Electricity: 3,000,000 kWh/yr · Electricity price on your bill (if known): —
  • All year: hot water, steam, process · Heat needed per year (if known): 500,000 kWh/yr
  • Land available for spreading digestate: — · Distance to the gas grid (for biomethane): 10 km
  • Grid connection? Yes

What to verify

Confirm collected sludge mass, salinity, BMP, nitrogen/ammonia inhibition and legal residuals disposal; compare centralised co-digestion.

Weak economics

Under current conditions the investment won't pay back in a reasonable time. Below is what could change that.

  • Base-case operating margin does not cover costs.
  • Even the optimistic case has a negative NPV (-€2.4M).

Main reason — small scale: the feedstock supports only ≈ 28 kW, while the plant costs ≈ €43K per kW. Digester, storage and CHP are expensive even at small capacity.

What would change the verdict
  • → Verify the inlet analysis and operating history, seasonal availability, and a supplier guarantee for the proposed treatment train.
  • → Confirm complete installed-cost quotations, residuals disposal, final effluent treatment and the energy offtake contract. Check the downside case before investment.
  • → Obtain site-specific permits and grid gas-quality requirements; extend this pre-tax screening to tax, working capital and lender cash-flow modelling.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

A clear no under these conditions: even the optimistic case does not pay back. Don't spend money on a feasibility study unless one of the changes above happens.

NPV: conservative -€3.6M · base -€2.9M · optimistic -€2.4M

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€1.2M – €1.2M
≈ SEK 13M (base)
Payback
no payback
base: no payback · no subsidies
NPV (base)
-€2.9M
range: -€3.6M … -€2.4M
Chosen route
Boiler (heat only)
Confidence: Medium

Feedstock and energy

Analysed organic residues
5,000 t/a
BMP: 280 L CH₄/kg VS
Biogas
54K – 110K Nm³/yr
≈ 13 Nm³/h (base)
Net energy
62 – 370 MWh/yr
Useful heat
Candidate capacity
28 kWe
micro (< 50 kW)

How far you can rely on these numbers

Medium · 75/100
  • Backed by your data and our sources75
  • You can still add+1
  • Limits of our data−14
  • Needs a feasibility study (lab, quotes, contracts)10

75/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainElectricity price on your bill (if known) (SEK/kWh)Small effectTotal of one bill divided by the kWh on it+1

With all of it: up to 76/100

Limits on our side

  • Scale outside the CAPEX calibration range (30 kW – 5 MW electrical equivalent)−8
  • Process inputs and project budgets require document verification; ranges are assumptions, not validated accuracy.−6

These come from our country price and cost data or the screening scope, not from your project. We update them.

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Upstream budgets must include pretreatment, logistics, storage and final treatment; they are not independently verified installed quotations.
  • BMP/COD and retention time alone do not verify salinity, ammonia inhibition, toxic contaminants or treatment stability; confirm with representative analysis and continuous pilot/vendor data.
Country conditions
  • Low electricity prices make CHP unattractive; upgraded biogas for vehicles is the usual route.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Possible with conditions”
  • The base-case NPV is negative (-€2.9M).
  • Payback in the base case is no payback; it needs to be 10 yr or less.

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Heat price at NPV = 0
€1.03/kWh th
now €0.138/kWh th
Highest installed cost at NPV = 0
not reachable
now €1.2M

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: -2.9M)

  1. OPEX +30 %-630K
  2. CAPEX +20 %-260K
  3. Useful heat (economic) −50 %-220K
  4. CH₄ −20 %-140K
  5. Energy prices −20 %-54K
  6. Maintenance +30 %-7.3K
  7. CHP downtime +10 pp0
  8. Feedstock potential −20 %19K
NPV = 0 if CAPEX falls by
not reachable
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
not reachable
relative to the base case

Scenarios

Route: Boiler (heat only). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€42K
  • Useful heat (economic)42K
OPEX / yr€190K
  • OPEX73K
  • Residuals disposal cost66K
  • Staff23K
  • Purchased electricity16K
Operating margin (EBITDA)-€150K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr53.9105105
CAPEX€1.2M€1.2M€1.2M
OPEX / yr€220K€190K€160K
Revenue + savings / yr€7.3K€42K€55K
Operating margin (EBITDA)-€210K-€150K-€110K
Simple paybackno paybackno paybackno payback
Discounted paybackno paybackno paybackno payback
NPV-€3.6M-€2.9M-€2.4M
IRR———
DSCR (min)-2.7-1.9-1.4

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).

Cumulative cash flow, €
-5.4M-3.9M-2.5M-1.1M300K03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) €1.3M-€160Kno payback-€3.2M-€3.8M … -€2.8M
Boiler (heat only) chosen€1.2M-€150Kno payback-€2.9M-€3.6M … -€2.4M
Biomethane €2M-€190Kno payback-€4.1M-€4.9M … -€3.6M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 9 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

Schemes are running, but your project does not meet their conditions

Main obstacle — Produktionsstöd biogas: Raw biogas ≈ 9 Nm³/h is below the practical upgrading minimum (60 Nm³/h) — consider a cluster. Details ↓

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Country overviewchecked 30 Oct 2026

Annual production premium for manure biogas and upgrading (budget-capped, pro-rated), plus competitive Klimatklivet investment grants for farm biogas.

Running, awarded by competition (1)

Support goes to the winners of a round or auction. The case assumes an award at the stated value.

Produktionsstöd biogas

Competitive
Biomethane support
Does not qualify
Raw biogas ≈ 9 Nm³/h is below the practical upgrading minimum (60 Nm³/h) — consider a cluster.

Not calculated: the project does not meet the conditions.

Conditions
  • not met: Raw biogas for upgrading from 60 Nm³/h (project ≈ 9 Nm³/h)
Not checked by the model — confirm with the operator:
  • no data: The manure premium is paid only on gas from manure
What the case uses
  • Route: Biomethane
  • Biomethane price: €0.95/Nm³
Scheme terms

≤ 0.40 SEK/kWh for manure + ≤ 0.30 for upgrading (≤ 0.45 with liquefaction) on top of the market price; paid only within the annual budget.

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Source: SFS 2022:225 §4–5 (as amended to SFS 2023:596) · checked 30 Oct 2026 · Data confidence: Low

Closed schemes (1)

Intake has ended. Shown for reference only.

Klimatklivet – biogas på gård

Closed
Investment grant
For reference
NPV change
+€280K
NPV with support
-€2.6M
Payback
no payback
IRR
—

Reference figures: intake is closed.

Conditions
  • met: Applicant is a farm
Not checked by the model — confirm with the operator:
  • no data: Gas produced on the farm and burnt in a stationary engine for electricity and heat
What the case uses
  • Route: CHP (power + heat)
  • Grant: 40 % of CAPEX
Scheme terms

Competitive CAPEX grant; 2026 farm awards ≈ 60–65 %, 40 % assumed; next round date not set.

Next step: Do not plan on it. Watch the operator's announcements for a successor scheme.

Source: Naturvårdsverket Klimatklivet: farm biogas round 25.05–05.06.2026, SEK 150 m (regleringsbrev 2026); county board notices 2026-05 · checked 30 Oct 2026 · Data confidence: Low

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

48/100

Of every 100 kWh of energy in the methane, 48 become a product that earns money or replaces a purchase.

100 % = 630 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Heat for a user300 MWh 48 %

Runs the plant

  • Digester heating180 MWh 28 %

Produced, not used

  • Heat with no buyer76 MWh 12 %

Losses

  • Conversion losses (engine, boiler)62 MWh 10 %
  • Methane leaks9.4 MWh 2 %

What this means for the project

  • 76 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income. At the heat value used in this case that is about €10K a year.
  • The plant uses 28 % of its energy itself, mostly to heat the digester in winter. Insulation, heat recovery from the digestate and a drier feedstock mix reduce it.
  • The plant buys 150 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Heat need
500 MWhYour data
Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
62 – 370 MWhCalculated

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 33 % of that month’s methane energy, in July 23 %.

January: methane energy 53 MWh · digester heating 17 MWh (33 %) · heat for a user 24 MWh

  • Methane energy of the month
  • Digester heating
  • Heat for a user

How it works: from feedstock to products

Heat produced (gross)
557 MWh
Digester heat demand
177 MWh
Useful heat (economic)
304 MWh of 379
Power: own use / sold
0 / 0 MWh

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
54/100
  • Energy equivalent ≈ 28 kWe (scale score 23/100)
  • Process-specific inlet basis; no generic feedstock energy-density score.
  • Feedstock available 12 of 12 months
Energy fit
80/100
  • Own consumption absorbs 0 % of the electricity produced
  • Useful heat 304 MWh of 379 MWh available after digester needs
Location & logistics
100/100
  • Land for digestate unknown
Technical feasibility
75/100
  • Micro scale (< 50 kWe): high specific cost and complexity
Economics
0/100
  • Operating margin ≤ 0 — no payback
  • Base-case NPV is negative
  • Minimum DSCR -1.91 — below the usual bank threshold of 1.2–1.3
Regulatory complexity
9/100 risk
  • Number and weight of permitting / regulatory steps: 7 points (more = harder)
Environmental risk
20/100 risk
  • Expected methane loss 1.5 % — within good practice if gas-tight and monitored
  • Unknown where the digestate will go
Overall project viability
40/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Capped at 40: weak economics is not offset by other factors.
  • Strongest: Location & logistics (100); weakest: Economics (0).

Calculation details

Analysed organic residues

Leave unknown costs and auxiliary loads blank. Economics require these inputs.

VS
225 t VS/a
m in
5,000 t/a
m gas
128.205 t/a
V
571.429 m³
HRT
40 d
OLR
1.125 kg VS/m³/d
N
20,000 kg N/a
CH₄ → CHP / Upgrading / Boiler
63,000 Nm³ CH₄/a
CH₄ loss
0 Nm³ CH₄/a
m residual
4,871.8 t/a

Enter the project budget for the upstream process, including pretreatment, logistics, storage and final treatment. Gas conversion equipment and energy are calculated separately. Enter zero only for a confirmed zero cost. Exclude from this budget; calculated separately: residuals disposal cost, biogas purchase price.

Technology & digester

Wet mesophilic digestion (CSTR)

Vertical CSTR with mechanical mixing and a membrane gas holder

Working volume
≈ 570 m³
Retention time
40 days
Loading rate
1.1 kg VS/(m³·d)
Digestate storage
≈ 2,400 m³
  • Dry matter 6.0 %: a liquid mix suited to wet mesophilic digestion.
  • Continuous feed — continuous operation gives steady gas and the simplest control.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Single stage plus a gas-tight digestate store as post-digester: sufficient at this scale.

Climate: Skåne (Kristianstad), mean 9.2 °C, ≈ 3,189 heating degree-days. Closest climate analogues: Copenhagen (DK) (Δ 0.6 °C), Munich (DE, Bavaria) (Δ 1.7 °C), Salzburg (AT) (Δ 1.8 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan4245317240
Feb3874816220
Mar4245317240
Apr4115116240
May4245314260
Jun4115112270
Jul4245312280
Aug4245312280
Sept4115113260
Oct4245315260
Nov4115116240
Dec4245317240
Σ5,0006191773040
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Analysed organic residues1.1M
Gas handling and cleaning31K
Boiler (heat only)7.1K
Heat network31K
Electrical systems and controls4.2K
Pipework2.8K
Civil works4.2K
Grid connection9.9K
Engineering and permits7.3K
Contingency9.8K
Total1.2M
OPEX / yr (EUR)
Staff23K
Maintenance2.2K
Insurance6K
Testing and monitoring5K
Purchased electricity16K
OPEX73K
Residuals disposal cost66K
Total190K
Revenue + savings / yr (EUR)
Useful heat (economic)42K
Total42K

Unit costs are estimates. Replace them with supplier quotations.

Digestate and residues

Digestate ≈ 4,872 t/yr with ≈ 20,000 kg N/yr. Its route and cost are your inputs (OPEX); no fertiliser credit is claimed.

Methane losses & climate

Expected losses: 1.5 % of methane produced (range 0.5 % – 3 %) ≈ 18 t CO₂e/yr; fossil emissions displaced ≈ 61 t CO₂/yr. Losses vs benefit: 30 %.

  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Building permit and environmental permit; EIA screening (Directive 2011/92/EU as transposed)
    New installation · effort: medium · to verify
  • ATEX hazardous-area zoning (Directives 2014/34/EU, 1999/92/EC)
    Methane in the gas phase · effort: medium · confirmed
  • Confirm material classification, pretreatment requirements and lawful residuals disposal
    Process-specific site conditions; no automatic legal eligibility · effort: high · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (120)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: Annual production premium for manure biogas and upgrading (budget-capped, pro-rated), plus competitive Klimatklivet investment grants for farm biogas.
  • Low electricity prices make CHP unattractive; upgraded biogas for vehicles is the usual route.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

Illustrative project assumptions, not an operator account or supplier quotation

  • Operating days: 350 d/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • Active months: 12 1–12 · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • Starting month: 1 1–12 · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • CAPEX: 12,000,000 SEK · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • OPEX: 800,000 SEK/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • Residuals disposal cost: 150 SEK/t · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • Upstream electricity use: 150,000 kWh/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • Additional process heat: 0 kWh_th/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • Scenario uncertainty: 40 % · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • Collected wet material: 5,000 t/a · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • ρ = m/V: 1,000 kg/m³ · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • DM / TS: 6 % FM · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • VS / DM: 75 % DM · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • BMP: 280 L CH₄/kg VS · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • CH₄: 60 % vol · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • N: 4 kg N/t FM · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • HRT: 40 d · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE
  • OLR: 2 kg/(m³·d) · ENGINEERING_ASSUMPTION · LOW · 2026-10-28 · SE

What could break the economics

Each stress test applied to the base case on its own.

boiler: local CAPEX factor
0.693 … 1.287 —
NPV low…high: -€2.9M … -€2.9M
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.05 … 0.08 —
NPV low…high: -€3M … -€2.7M
BMP
168 … 392
NPV low…high: -€3.2M … -€2.8M
Collected wet material
3,000 … 7,000
NPV low…high: -€3.1M … -€2.8M
HRT
24 … 56
NPV low…high: -€2.9M … -€2.9M
OPEX
480,000 … 1,120,000
NPV low…high: -€3.2M … -€2.6M
Residuals disposal cost
90 … 210
NPV low…high: -€3.2M … -€2.6M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.65 EUR/Nm³ · CALCULATED_VALUE · LOW
National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
boiler: local CAPEX factor: 0.99 — · CALCULATED_VALUE · MEDIUM
0.72 traded equipment + 0.28 × local/German labour cost (30.2/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.045 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.06 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.00 % (Aaa; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Business electricity reference, excl. VAT (default if the customer gives none): 0.1056 EUR/kWh · MARKET_DATA · HIGH
Eurostat nrg_pc_205, non-household, MWH2000-19999, excl. VAT, 2026-S1
2026-S1 · checked 2026-10-31 · Consumer band MWH2000-19999; 3000 MWh/year customer load; existing-site load, new plant auxiliary load may change the applicable band
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.08248 EUR/kWh · MARKET_DATA · HIGH
ENTSO-E day-ahead (via Energy-Charts), zone SE4, average 82.5 €/MWh, 2025-10-01 – 2026-10-01
2025-10-01 / 2026-10-01 · checked 2026-10-30 · Wholesale bidding zone SE4; not a guaranteed export PPA
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Exchange rate: 11 SEK/EUR · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-09
2026-11-09 · checked 2026-11-10 · SEK per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Value of useful heat (displaced gas / boiler efficiency): 0.1379 EUR/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 124.09800000000001 €/MWh LHV ÷ 0.9
2026-S1 · checked 2026-10-31 · GJ10000-99999; reference band, customer gas use unknown
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 43.1 EUR/h · MARKET_DATA · HIGH
Eurostat lc_lci_lev: hourly labour cost (wages + employer costs), industry, construction & services, 2025
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the bill actually avoided by self-generation: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
TOU reference: energy/Ft portion only, demand/service charges retained. Else 85% engineering allowance. User invoice uses the generic allowance until its energy/demand split is known.
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity