Business situation

A large integrated pig complex in Timiș (where Smithfield alone runs some 25 farms) considers digesting its slurry. A 2023 review found no operating on-farm biogas plants in Romanian agriculture.

Operating assumptions

  • Pig slurry: 39,900 t/yr · DM: 5.5 % · 12 months
  • Pig slurry: 14,250 t/yr · DM: 5.5 % · 12 months
  • Electricity: 4,000,000 kWh/yr · Electricity price on your bill (if known): 0.94 RON/kWh
  • Winter: space heating · Heat needed per year (if known): 3,000,000 kWh/yr
  • Land available for spreading digestate: 3,000 ha · Distance to the gas grid (for biomethane): 5 km
  • Existing lagoon / store that could be covered: 60,000 m³
  • Grid connection? Yes

What to verify

Check co-substrates available nearby, grid connection capacity, and any national or EU-funded support for agricultural biogas.

Possible with conditions

It can pay off, but only if the key conditions hold — confirm them in a feasibility study.

  • Base NPV positive (€630K), payback ≈ 7.4 yrs.
  • Conservative-case NPV is negative (-€1.5M) — sensitive to key assumptions.

Largest benefit — “electricity savings (self-consumption)”: ≈ 84 % of all revenue and savings.

What would change the verdict
  • → Secure long-term heat and power offtake; benchmark CAPEX with 3–5 suppliers.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

Grey zone: the answer flips between the conservative and the optimistic case. Before paying for a feasibility study, check these first:

NPV: conservative -€1.5M · base €630K · optimistic €1.7M

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in 76 % of cases.

  1. Feedstock potential −20 % (-€830K)
  2. Lab test of the methane yield (BMP) · CH₄ −20 % (-€760K)
  3. Get an offer for exported power (PPA or tariff) · Energy prices −20 % (-€740K)

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

To reach a bankable estimate (±15 %)
  1. Laboratory methane-potential (BMP) test of 2–3 feedstock samples — ≈ €300–800 each
  2. 2–3 supplier quotes for the plant
  3. Grid or gas-network connection conditions from the operator
  4. Letters of intent for feedstock supply and for heat, power or biomethane offtake
  5. Then a feasibility study with permits and financing (±15 %)
From screening to construction

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€2.1M – €2.8M
≈ RON 12M (base)
Payback
5.2 yr – 20.3 yr
base: 7.4 yr · no subsidies
NPV (base)
€630K
range: -€1.5M … €1.7M
Chosen route
CHP (power + heat)
Confidence: Medium

Feedstock and energy

Feedstock potential
54,000 t/yr
energy ≈ 122 kWh CH₄/t
Biogas
840K – 1.2M Nm³/yr
≈ 134 Nm³/h (base)
Net energy
1,800 – 2,500 MWh/yr
useful heat: 160 – 650 MWh · ≈ 59 % of your electricity use
Candidate capacity
330 kWe
medium (0.25–1 MW)

How far you can rely on these numbers

Medium · 75/100
  • Backed by your data and our sources75
  • You can still add+15
  • Needs a feasibility study (lab, quotes, contracts)10

75/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainLaboratory DM, VS and BMP results for every feedstock streamLarge effectSend a sample to a laboratory: dry matter and VS take a few days, BMP several weeksValues equal to the typical ones shown in the form do not count as a laboratory result.+15

With all of it: up to 90/100

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • CHP performance uses a 50 Hz biogas full-load catalogue reference (03/2025), interpolated between ratings; part-load and ambient derating require supplier confirmation.
Compared with the market
Our estimate: ≈ 7,000 €/kW at ≈ 330 kW
  • 8,000–10,000 EUR/kW — Cattle-manure plant, IEA Task 37 · below rangeIEA Bioenergy Task 37, presentation by P. Kornatz (DBFZ): ≈ €1.81 m for 200 kW · ≈2022–2023 · Single project
  • 3,400–7,500 EUR/kW — Flexible plant, Germany · within rangeDBFZ / Fraunhofer IEE for BMWK (February 2024): €7,521 per kW rated (≈ €3,400 per kW installed) capacity · 2023 · Official study
  • 2,800–7,000 EUR/kW — Agricultural plants, Poland · within rangePolish trade press 2023–2024 (PLN 7–20 m for 500 kW; PLN 12–16 m for 1 MW); IOŚ-PIB: ≈ PLN 30 m for 1 MW · 2023–2024 · Trade press

Market figures are mostly trade press and supplier estimates, not audited budgets. Real prices come from 3–5 supplier quotes.

Country conditions
  • Early-stage market with high potential: first movers face grid-connection and permitting uncertainty.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Strong candidate”
  • Payback in the base case is 7.4 yr; it needs to be 6.5 yr or less.
  • The conservative case must stay profitable too (its NPV is -€1.5M).
ChangeVerdictNPV (base)Δ NPVBreak-even
Take in food waste
≈ 5,100 t a year of source-separated food waste from ≈ 15 km away, with a gate fee of RON 32 per tonne.
Possible with conditions€1.6M+€1Mpays even at a cost of RON 75.1 per tonne
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 450 MWh a year, valued at ≈ RON 0.355 per kWh.
Possible with conditions€920K+€290Kheat ≥ RON 0.183 per kWh
Pool manure with neighbours
100 % more manure from neighbouring farms, trucked ≈ 5 km, into one shared plant.
Possible with conditions€840K+€210K—
Strongest combination
Take in food waste + Sell the spare heat
Possible with conditionsPossible with conditionsΔ NPV +€1.6M
Order of action
  1. 1Verify first: Get supplier quotes for the plant. Up to €2.1K of this decision depends on it. →
  2. 2Secure ≈ 5,100 t a year of food waste (pays even at a cost of RON 75.1 per tonne).
  3. 3Find a heat buyer for ≈ 450 MWh a year (heat ≥ RON 0.183 per kWh).
  4. 4Agree supply with neighbouring farms: 100 % more manure within ≈ 5 km.
  5. 5Ask 3–5 suppliers for quotes: the project breaks even up to an investment of €2.8M. →
Scenario assumptions
  • Co-substrate share of the organic matter (VS) after it is added: 30 % · ASSUMPTION · LOW · 2026-11-02 · Judgement: usual co-digestion share at manure plants; the model applies pasteurisation, rejects and inhibition checks to the new mix.
  • Haul distance of the co-substrate: 15 km · ASSUMPTION · LOW · 2026-11-02 · Judgement: food processors within a regional collection radius.
  • Gate fee received for source-separated food waste: €6/t · ASSUMPTION · LOW · 2026-11-02 · Judgement, deliberately low. WRAP UK Gate Fees Report 2025/26 (3 July 2026): AD gate fees fell from 2024/25 and several councils paid £0 or less. The paid report gives the gate fee at which the scenario breaks even.
  • Haul distance of the neighbours' feedstock: 5 km · ASSUMPTION · LOW · 2026-11-02 · Judgement: neighbouring farms within a few kilometres; slurry hauled much further rarely pays (see the maximum distance per stream).

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Get supplier quotes for the plantcan change the answer-€210K … €1.5M€2.1K
Check how your bill splits energy and capacity charges€27K … €1.2M—
Verify the market price€270K … €830K—
Check the fertiliser value of the digestate€550K … €760K—
Confirm a reliable heat buyer and demand€550K … €690K—
How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Romania.
Feedstock (screening values, to be confirmed):
- pig slurry: 40,000 t/year, DM ≈ 5.5 %
- pig slurry: 14,000 t/year, DM ≈ 5.5 %
Design basis from the screening: raw biogas ≈ 130 Nm³/h at ≈ 62 % CH₄; digester working volume ≈ 5,200 m³; combined heat and power ≈ 330 kWe; new digestate storage ≈ 0 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Check how your bill splits energy and capacity charges
  1. Take the last 12 electricity invoices.
  2. Split each into the energy part (per kWh) and capacity, network and fixed charges; own generation saves mainly the energy part.

Then enter it in: Energy step: electricity price per kWh (energy part, excl. VAT)

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

How to check: Confirm a reliable heat buyer and demand
  1. Confirm the buyer's monthly heat demand and the temperature they need.
  2. Agree a price per kWh linked to their current fuel, and a term of at least the loan period.
Request to send
Offer of renewable heat
Site: Romania. A biogas plant can supply ≈ 1,200 MWh of heat a year (hot water, ≈ 80–90 °C) all year round. Please tell us your monthly heat use, the temperature you need, your current fuel and its price, and the price per kWh and term you would accept.

Then enter it in: Energy step: price the heat buyer pays per kWh

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Electricity value at NPV = 0
€0.122/kWh
now €0.15/kWh
Highest installed cost at NPV = 0
€2.8M
now €2.3M
Feedstock price headroom
€1.14/t
can pay up to €1.14 per tonne more for every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-€180K
Median NPV
€270K
NPV P90 (1 in 10 better)
€590K
Chance that NPV > 0
76 %
Median payback
8.5 yr

Reality check: on 39 German farm plants with metered feed and methane (FNR Biogas-Messprogramm III), measured output was 1–1.3 × this model's estimate for 8 in 10 plants. The model sizes the plant itself and stays on the cautious side; with feedstock that is not lab-tested, one plant can still miss by more.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: 630K)

  1. Feedstock potential −20 %-830K
  2. CH₄ −20 %-760K
  3. Energy prices −20 %-740K
  4. CAPEX +20 %-560K
  5. CHP downtime +10 pp-450K
  6. Maintenance +30 %-250K
  7. Useful heat (economic) −50 %-150K
  8. Feedstock transport +50 %0
NPV = 0 if CAPEX falls by
already positive
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
already positive
relative to the base case

Flip the NPV sign: Feedstock potential −20 %; CH₄ −20 %; Energy prices −20 %.

Scenarios

Route: CHP (power + heat). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€420K
  • Electricity self-consumption savings350K
  • Incremental digestate value36K
  • Useful heat (economic)32K
OPEX / yr€110K
  • CHP service and overhaul reserve46K
  • Maintenance37K
  • Staff14K
  • Insurance11K
Operating margin (EBITDA)€310K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr843.71,072.71,158.5
CAPEX€2.8M€2.3M€2.1M
OPEX / yr€130K€110K€110K
Revenue + savings / yr€260K€420K€500K
Operating margin (EBITDA)€140K€310K€400K
Simple payback20.3 yr7.4 yr5.2 yr
Discounted paybackno payback10.7 yr6.9 yr
NPV-€1.5M€630K€1.7M
IRR-2.5 %11.4 %18.2 %
DSCR (min)0.61.52.2

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 50 % debt (no taxes).

Cumulative cash flow, €
-3.2M-1.1M940K3M5.1M03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) chosen€2.3M€310K7.4 yr€630K-€1.5M … €1.7M
Boiler (heat only) €1.7M€52K> 25 yr-€1.3M-€2.5M … -€440K
Biomethane €2.9M€9.2K> 25 yr-€2.9M-€4.7M … -€1.5M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 98 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 27,000CHP (power + heat)160€1.3M-€28K
× 0.75 41,000CHP (power + heat)250€1.8M€320K
× 1 your input54,000CHP (power + heat)330€2.3M€630K
× 1.5 81,000CHP (power + heat)490€3.2M€1.3M
× 2 110,000CHP (power + heat)710€4.1M€1.9M
× 3 160,000CHP (power + heat)1,050€7M€1.1M

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

There is no support for new projects that we could calculate — see the country overview

No support scheme for new projects is modelled for this country.

Country overviewchecked 30 Oct 2026

No support open for new biogas or biomethane: the PNRR manure-biogas scheme ended in June 2026; OUG 9/2026 only enables future biomethane aid schemes.

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

43/100

Of every 100 kWh of energy in the methane, 43 become a product that earns money or replaces a purchase.

100 % = 6,600 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Electricity used on site2,400 MWh 36 %
  • Heat for a user480 MWh 7 %

Runs the plant

  • Plant’s own electricity210 MWh 3 %
  • Digester heating1,500 MWh 23 %

Produced, not used

  • Heat with no buyer690 MWh 10 %

Losses

  • Conversion losses (engine, boiler)1,200 MWh 18 %
  • Gas sent to the flare98 MWh 1 %
  • Methane leaks99 MWh 2 %

What this means for the project

  • 690 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income. At the heat value used in this case that is about €46K a year.
  • The plant uses 26 % of its energy itself, mostly to heat the digester in winter. Insulation, heat recovery from the digestate and a drier feedstock mix reduce it.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Engine efficiency: electricity / heat
40 % / 45 %Assumption
Heat need
3,000 MWhYour data
Site electricity use
4,000 MWhYour data
Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
1,800 – 2,500 MWhCalculated

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 29 % of that month’s methane energy, in July 18 %.

January: methane energy 550 MWh · digester heating 160 MWh (29 %) · heat for a user 55 MWh

  • Methane energy of the month
  • Digester heating
  • Heat for a user

How it works: from feedstock to products

  1. Feedstock54,000 t/yr
  2. Biogas1.1M Nm³/yr
  3. Electricity2,400 MWh
  4. Useful heat480 MWh
  5. Heat without demand690 MWh
  6. Digestate53,000 t/yr
Heat produced (gross)
2,690 MWh
Digester heat demand
1,524 MWh
Useful heat (economic)
480 MWh of 1,166
Power: own use / sold
2,368 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
-197 g CO₂e/MJ
gas-tight digestate storage
Fossil comparator
183 g CO₂e/MJ
Greenhouse-gas saving
207 %
RED minimum: 80 %
Avoided emissions
3,496 t CO₂e
  • Meets the RED minimum.
  • Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
80/100
  • Energy equivalent ≈ 330 kWe (scale score 88/100)
  • Feedstock energy ≈ 122 kWh of methane per tonne (score 26/100)
  • Feedstock available 12 of 12 months
Energy fit
81/100
  • Own consumption absorbs 100 % of the electricity produced
  • Useful heat 480 MWh of 1166 MWh available after digester needs
Location & logistics
100/100
  • No critical site constraints found from your answers
Technical feasibility
100/100
  • Standard layout for this scale, no critical obstacles
Economics
69/100
  • Base-case simple payback ≈ 7.4 years
Regulatory complexity
18/100 risk
  • Number and weight of permitting / regulatory steps: 9 points (more = harder)
Environmental risk
24/100 risk
  • Expected methane loss 2.5 % (good practice ≤ 2 %)
Overall project viability
81/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Location & logistics (100); weakest: Economics (69).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Pig slurry39,9005.512.3on site≈ 32 km
Pig slurry14,2505.512.3on site≈ 32 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Wet mesophilic digestion (CSTR)

Vertical CSTR with mechanical mixing and a membrane gas holder

Working volume
≈ 5,200 m³
Retention time
35 days
Loading rate
1.2 kg VS/(m³·d)
Digestate storage
≈ 26,000 m³
  • Dry matter 5.5 %: a liquid mix suited to wet mesophilic digestion.
  • Continuous feed — continuous operation gives steady gas and the simplest control.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Two-stage layout (main + post-digester) for stability with fats or larger flows.
Alternatives
  • Horizontal plug-flow as a simpler option for small cattle-manure plants

Climate: Banat (Timișoara), mean 13 °C, ≈ 2,319 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 3 °C), Prague (CZ) (Δ 3.2 °C), Kraków (PL) (Δ 3.6 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan4,59655415955201
Feb4,18850514253183
Mar4,59655414567201
Apr4,44853612676195
May4,59655411832201
Jun4,448536990195
Jul4,596554970201
Aug4,596554970201
Sept4,4485361090195
Oct4,59655413178201
Nov4,44853614263195
Dec4,59655415856201
Σ54,1506,5311,5244802,368
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester650K
Covering existing storage400K
Feedstock reception and preparation20K
Gas handling and cleaning37K
CHP (power + heat)470K
Heat network50K
Backup boiler10K
Electrical systems and controls98K
Pipework66K
Civil works98K
Grid connection32K
Engineering and permits150K
Contingency210K
Total2.3M
OPEX / yr (EUR)
Staff14K
CHP service and overhaul reserve46K
Maintenance37K
Insurance11K
Testing and monitoring5K
Total110K
Revenue + savings / yr (EUR)
Electricity self-consumption savings350K
Useful heat (economic)32K
Incremental digestate value36K
Total420K

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: asset · 52,867 t/yr · nitrogen ≈ 257,213 kg/yr · land needed ≈ 1,513 ha (available 3,000 ha).

Incremental fertiliser value €36K/yr, handling €0/yr, net €36K/yr.

  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 2.5 % of methane produced (range 1.5 % – 4 %) ≈ 322 t CO₂e/yr; fossil emissions displaced ≈ 691 t CO₂/yr. Losses vs benefit: 47 %.

  • Expected loss 2.5 % is above good practice (2 %): budget for monitoring.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Building permit and environmental permit; EIA screening (Directive 2011/92/EU as transposed)
    New installation · effort: medium · to verify
  • Industrial Emissions Directive (2010/75/EU) permit — anaerobic digestion of waste above ~100 t/day
    Throughput above the IED threshold · effort: high · to verify
  • Nitrates Directive (91/676/EEC): 170 kg N/ha from organic manures in vulnerable zones; closed spreading periods
    Digestate is spread on land · effort: medium · confirmed
  • ATEX hazardous-area zoning (Directives 2014/34/EU, 1999/92/EC)
    Methane in the gas phase · effort: medium · confirmed
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (159)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: No support open for new biogas or biomethane: the PNRR manure-biogas scheme ended in June 2026; OUG 9/2026 only enables future biomethane aid schemes.
  • Early-stage market with high potential: first movers face grid-connection and permitting uncertainty.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

chp: local CAPEX factor
0.56 … 1.04 —
NPV low…high: -€210K … €1.5M
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.066 … 0.096 —
NPV low…high: €270K … €830K
Mineral potassium price
0.713 … 0.8099 EUR/kg K₂O
NPV low…high: €630K … €630K
Mineral nitrogen price
1.045 … 1.818 EUR/kg N
NPV low…high: €550K … €760K
Mineral phosphorus price
1.419 … 1.847 EUR/kg P₂O₅
NPV low…high: €630K … €630K
Avoidable share of an unsplit customer electricity bill
0.7 … 1 —
NPV low…high: €27K … €1.2M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.4 EUR/Nm³ · CALCULATED_VALUE · LOW
National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
chp: local CAPEX factor: 0.8 — · CALCULATED_VALUE · MEDIUM
0.72 traded equipment + 0.28 × local/German labour cost (9.5/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.061 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.5 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 7 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 4.59 EUR/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 1.96 EUR/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.076 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 2.72 % (Baa3; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.1246 EUR/kWh · MARKET_DATA · HIGH
ENTSO-E day-ahead (via Energy-Charts), zone RO, average 124.6 €/MWh, 2025-10-01 – 2026-10-01
2025-10-01 / 2026-10-01 · checked 2026-10-30 · Wholesale bidding zone RO; not a guaranteed export PPA
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 5.343 RON/EUR · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-09
2026-11-09 · checked 2026-11-10 · RON per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Value of useful heat (displaced gas / boiler efficiency): 0.06648 EUR/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 59.829000000000015 €/MWh LHV ÷ 0.9
2026-S1 · checked 2026-10-31 · GJ10000-99999; reference band, customer gas use unknown
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 13.6 EUR/h · MARKET_DATA · HIGH
Eurostat lc_lci_lev: hourly labour cost (wages + employer costs), industry, construction & services, 2025
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.088 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 0.79 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.1759 EUR/kWh · USER_INPUT · MEDIUM
USER_INPUT 0.94 RON/kWh / FX 5.343; Official EUR reference rate, 2026-11-09. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
pig_slurry: dry matter: 5.5 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
pig_slurry: volatile solids: 77 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
pig_slurry: BMP (scenarios ± inter-laboratory spread): 290 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
pig_slurry: dry matter: 5.5 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
pig_slurry: volatile solids: 77 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
pig_slurry: BMP (scenarios ± inter-laboratory spread): 290 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.