Sample report · Mexico
Pig farm · Pig slurry: 33,250 t/yr · Pig slurry: 11,880 t/yr
Business situation
A Yucatán pig integrator covers its lagoons and runs generators to replace CFE power. More than 100 commercial farms in Yucatán have digesters and about half have gensets; research shows many are poorly operated and recover their investment only under good conditions.
Operating assumptions
- Pig slurry: 33,250 t/yr · DM: 5.5 % · 12 months
- Pig slurry: 11,880 t/yr · DM: 5.5 % · 12 months
- Electricity: 3,000,000 kWh/yr · Electricity price on your bill (if known): 3 MXN/kWh
- No heat needed
- Land available for spreading digestate: 200 ha · Distance to the gas grid (for biomethane): —
- Existing lagoon / store that could be covered: 40,000 m³
- Grid connection? Yes
What to verify
Confirm the CFE tariff, generator operation and maintenance, H₂S control and how the lagoon effluent is handled given the karst aquifer.
Possible with conditions
It can pay off, but only if the key conditions hold — confirm them in a feasibility study.
- Base NPV positive (US$940K), payback ≈ 5.0 yrs.
- Conservative-case NPV is negative (-US$290K) — sensitive to key assumptions.
Largest benefit — “electricity savings (self-consumption)”: ≈ 88 % of all revenue and savings.
- → Secure long-term heat and power offtake; benchmark CAPEX with 3–5 suppliers.
Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.
How firm is this answer?
Grey zone: the answer flips between the conservative and the optimistic case. Before paying for a feasibility study, check these first:
NPV: conservative -US$290K · base US$940K · optimistic US$1.5M
The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in > 99 % of cases.
- Feedstock potential −20 % (-US$500K)
- Get an offer for exported power (PPA or tariff) · Energy prices −20 % (-US$490K)
- Lab test of the methane yield (BMP) · CH₄ −20 % (-US$430K)
These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.
To reach a bankable estimate (±15 %)
- Laboratory methane-potential (BMP) test of 2–3 feedstock samples — ≈ US$336–US$895 each
- 2–3 supplier quotes for the plant
- Grid or gas-network connection conditions from the operator
- Letters of intent for feedstock supply and for heat, power or biomethane offtake
- Then a feasibility study with permits and financing (±15 %)
Key figures
Ranges: conservative — base — optimistic. We don't show fake precision.
Economics
1 EUR = 1.1193 USD · ECB · 2026-11-09
Feedstock and energy
How far you can rely on these numbers
Medium · 67/100- Backed by your data and our sources67
- You can still add+23
- Needs a feasibility study (lab, quotes, contracts)10
67/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.
What you can add
- Biggest gainLaboratory DM, VS and BMP results for every feedstock streamLarge effectSend a sample to a laboratory: dry matter and VS take a few days, BMP several weeksValues equal to the typical ones shown in the form do not count as a laboratory result.+15
- Route-specific CAPEX lacks independent local validation — obtain comparable supplier quotations+8
With all of it: up to 90/100
High requires verified laboratory and project documents, so a screening stops at 90/100.
- In this configuration the digestate is a cost rather than an asset.
- CHP performance uses a 60 Hz biogas full-load catalogue reference (04/2025), interpolated between ratings; part-load and ambient derating require supplier confirmation.
- Both digester types were assessed for this liquid feed and climate. Chosen: Covered anaerobic lagoon (unheated, ambient temperature) (NPV US$940K); alternative: Wet mesophilic digestion (CSTR) (NPV -US$190K, CAPEX US$2M). A covered lagoon is cheaper but gives ≈ 100 % of a heated tank's gas (EPA AgSTAR) and needs land.
- 8,954–11,193 USD/kW — Cattle-manure plant, IEA Task 37 · below rangeIEA Bioenergy Task 37, presentation by P. Kornatz (DBFZ): ≈ €1.81 m for 200 kW · ≈2022–2023 · Single project
- 3,806–8,395 USD/kW — Flexible plant, Germany · within rangeDBFZ / Fraunhofer IEE for BMWK (February 2024): €7,521 per kW rated (≈ €3,400 per kW installed) capacity · 2023 · Official study
Market figures are mostly trade press and supplier estimates, not audited budgets. Real prices come from 3–5 supplier quotes.
- Warm climate allows covered lagoons for pig and dairy effluent.
Action plan: what would make it stronger
Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.
- The conservative case must stay profitable too (its NPV is -US$290K).
| Change | Verdict | NPV (base) | Δ NPV | Break-even |
|---|---|---|---|---|
Sell the spare heat A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 2,000 MWh a year, valued at ≈ MX$0.393 per kWh. | Possible with conditions | US$1.3M | +US$310K | heat ≥ MX$0.0878 per kWh |
Pool manure with neighbours 100 % more manure from neighbouring farms, trucked ≈ 5 km, into one shared plant. | Possible with conditions | US$450K | -US$490K | — |
Take in food waste ≈ 4,200 t a year of source-separated food waste from ≈ 15 km away, with a gate fee of MX$130 per tonne. | Possible with conditions | US$320K | -US$630K | gate fee ≥ MX$425 per tonne |
- 1Find a heat buyer for ≈ 2,000 MWh a year (heat ≥ MX$0.0878 per kWh).
- 2Ask 3–5 suppliers for quotes: the project breaks even up to an investment of US$1.9M. →
Scenario assumptions
- Co-substrate share of the organic matter (VS) after it is added: 30 % · ASSUMPTION · LOW · 2026-11-02 · Judgement: usual co-digestion share at manure plants; the model applies pasteurisation, rejects and inhibition checks to the new mix.
- Haul distance of the co-substrate: 15 km · ASSUMPTION · LOW · 2026-11-02 · Judgement: food processors within a regional collection radius.
- Gate fee received for source-separated food waste: US$6.72/t · ASSUMPTION · LOW · 2026-11-02 · Judgement, deliberately low. WRAP UK Gate Fees Report 2025/26 (3 July 2026): AD gate fees fell from 2024/25 and several councils paid £0 or less. The paid report gives the gate fee at which the scenario breaks even.
- Haul distance of the neighbours' feedstock: 5 km · ASSUMPTION · LOW · 2026-11-02 · Judgement: neighbouring farms within a few kilometres; slurry hauled much further rarely pays (see the maximum distance per stream).
What to verify first
Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.
| Check | NPV across the plausible range | Worth knowing |
|---|---|---|
| Check how your bill splits energy and capacity charges | US$510K … US$1.4M | — |
| Get supplier quotes for the plant | US$570K … US$1.3M | — |
| Verify the market price | US$700K … US$1.1M | — |
| Check the fertiliser value of the digestate | US$870K … US$1.1M | — |
How to check: Check how your bill splits energy and capacity charges
- Take the last 12 electricity invoices.
- Split each into the energy part (per kWh) and capacity, network and fixed charges; own generation saves mainly the energy part.
Then enter it in: Energy step: electricity price per kWh (energy part, excl. VAT)
How to check: Get supplier quotes for the plant
- Send the same request to at least three suppliers.
- Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request for quotation: turnkey biogas plant Site: Mexico. Feedstock (screening values, to be confirmed): - pig slurry: 33,000 t/year, DM ≈ 5.5 % - pig slurry: 12,000 t/year, DM ≈ 5.5 % Design basis from the screening: raw biogas ≈ 110 Nm³/h at ≈ 62 % CH₄; digester working volume ≈ 5,200 m³; combined heat and power ≈ 260 kWe; new digestate storage ≈ 0 m³. Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.
Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology
How to check: Verify the market price
- Check the official source shown for this price in the market-data table and compare it with your own contract.
Then enter it in: Energy step: your own price, if you have a contract
How to check: Check the fertiliser value of the digestate
- Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
- Check the land available for spreading against the nitrogen limit.
Then enter it in: Site step: land available for digestate
Break-even prices
Each value on its own brings the base-case NPV to zero; everything else stays as calculated.
Probability range (Monte Carlo)
160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.
Reality check: on 39 German farm plants with metered feed and methane (FNR Biogas-Messprogramm III), measured output was 1–1.3 × this model's estimate for 8 in 10 plants. The model sizes the plant itself and stays on the cautious side; with feedstock that is not lab-tested, one plant can still miss by more.
What could break the economics
Each stress test applied to the base case on its own.
Change in NPV vs base, USD (base: 940K)
- Feedstock potential −20 %-500K
- Energy prices −20 %-490K
- CH₄ −20 %-430K
- CHP downtime +10 pp-250K
- CAPEX +20 %-250K
- Maintenance +30 %-170K
- Useful heat (economic) −50 %0
- Feedstock transport +50 %0
Scenarios
Route: CHP (power + heat). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).
- Revenue + savings / yrUS$290K
- Electricity self-consumption savings250K
- Incremental digestate value34K
- OPEX / yrUS$76K
- CHP service and overhaul reserve44K
- Maintenance13K
- Staff9.3K
- Testing and monitoring5.6K
- Operating margin (EBITDA)US$210K
| Scenarios | Conservative | Base | Optimistic |
|---|---|---|---|
| Biogas, 1 000 Nm³/yr | 703.2 | 894 | 965.5 |
| CAPEX | US$1.3M | US$1.1M | US$950K |
| OPEX / yr | US$80K | US$76K | US$73K |
| Revenue + savings / yr | US$190K | US$290K | US$340K |
| Operating margin (EBITDA) | US$110K | US$210K | US$260K |
| Simple payback | 12 yr | 5 yr | 3.6 yr |
| Discounted payback | no payback | 6.7 yr | 4.7 yr |
| NPV | -US$290K | US$940K | US$1.5M |
| IRR | 4 % | 18.9 % | 26.7 % |
| DSCR (min) | 0.9 | 2.3 | 3.1 |
Pre-tax, nominal USD, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 50 % debt (no taxes).
Biogas use routes compared
Base case. The model picks the route with the best NPV among technically sensible ones.
| Route | CAPEX | EBITDA / yr | Payback | NPV (base) | NPV low…high |
|---|---|---|---|---|---|
| CHP (power + heat) chosen | US$1.1M | US$210K | 5 yr | US$940K | -US$290K … US$1.5M |
| Boiler (heat only) | US$520K | -US$22K | no payback | -US$750K | -US$1.1M … -US$580K |
| Biomethane | US$1.9M | US$81K | 23.6 yr | -US$1.2M | -US$2.9M … US$300K |
- CHP pays when you use the power yourself and the heat is really used.
- Biomethane: raw biogas ≈ 110 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.
Plant size
The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.
| Size | t/yr | Best option | kWe | CAPEX | NPV (base) |
|---|---|---|---|---|---|
| × 0.5 | 23,000 | CHP (power + heat) | 120 | US$610K | US$200K |
| × 0.75 | 34,000 | CHP (power + heat) | 190 | US$840K | US$560K |
| × 1 your input | 45,000 | CHP (power + heat) | 260 | US$1.1M | US$940K |
| × 1.5 | 68,000 | CHP (power + heat) | 400 | US$1.5M | US$1.5M |
| × 2 | 90,000 | CHP (power + heat) | 530 | US$1.9M | US$1.3M |
| × 3 | 140,000 | CHP (power + heat) | 860 | US$2.7M | US$1.1M |
National support schemes — separate cases
Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.
There is no support for new projects that we could calculate — see the country overview
No support scheme for new projects is modelled for this country.
No operating support for biogas; the 2025 Electricity Sector Law raises the distributed-generation threshold to 0.7 MW and simplifies self-supply permits.
Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.
Where the energy goes
Heat produced ≠ useful heat. Heat without a user isn't income.
34/100
Of every 100 kWh of energy in the methane, 34 become a product that earns money or replaces a purchase.
100 % = 5,500 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.
Stream by stream
CalculatedEarns money
- Electricity used on site1,900 MWh 34 %
Runs the plant
- Plant’s own electricity170 MWh 3 %
Produced, not used
- Heat with no buyer2,500 MWh 45 %
Losses
- Conversion losses (engine, boiler)890 MWh 16 %
- Gas sent to the flare52 MWh 0.9 %
- Methane leaks83 MWh 1 %
What this means for the project
- 2,500 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income.
- Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.
What the figures rest on
- Engine efficiency: electricity / heat
- 38 % / 50 %Assumption
- Heat need
- no heat userYour data
- Site electricity use
- 3,000 MWhYour data
- Methane leaks, base case
- 2 %Assumption
- Main product, conservative – optimistic
- 1,400 – 2,000 MWhCalculated
How it works: from feedstock to products
- Feedstock45,000 t/yr
- Biogas890K Nm³/yr
- Electricity1,900 MWh
- Useful heat0 MWh
- Heat without demand2,500 MWh
- Digestate44,000 t/yr
- Heat produced (gross)
- 2,470 MWh
- Digester heat demand
- 0 MWh
- Useful heat (economic)
- 0 MWh of 2,470
- Power: own use / sold
- 1,857 / 0 MWh
Climate case (EU RED method)
EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.
- Meets the RED minimum.
- Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.
Scores by dimension
No single magic number. The overall score comes with its explanation.
- Energy equivalent ≈ 260 kWe (scale score 84/100)
- Feedstock energy ≈ 122 kWh of methane per tonne (score 26/100)
- Feedstock available 12 of 12 months
- Own consumption absorbs 100 % of the electricity produced
- Useful heat 0 MWh of 2470 MWh available after digester needs
- Not enough land for the digestate
- Standard layout for this scale, no critical obstacles
- Base-case simple payback ≈ 5.0 years
- Number and weight of permitting / regulatory steps: 6 points (more = harder)
- Expected methane loss 2.5 % (good practice ≤ 2 %)
- Surplus digestate: risk of nitrogen over-application
- Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
- Strongest: Technical feasibility (100); weakest: Energy fit (43).
Calculation details
Feedstock & logistics
| Stream | t/yr | DM, % | Nm³ CH₄/t | Logistics / energy | Max. distance |
|---|---|---|---|---|---|
| Pig slurry | 33,250 | 5.5 | 12.3 | on site | ≈ 23 km |
| Pig slurry | 11,880 | 5.5 | 12.3 | on site | ≈ 23 km |
Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.
Technology & digester
Covered anaerobic lagoon (unheated, ambient temperature)
Lined lagoon with HDPE gas-tight cover, sludge removal and gas collection
- Working volume
- ≈ 5,200 m³
- Retention time
- 42.4 days
- Loading rate
- 1 kg VS/(m³·d)
- Digestate storage
- ≈ 3,700 m³
- Warm climate (annual mean ≈ 27 °C) and a liquid feed (5.5 % DM): an unheated covered lagoon is the lowest-cost proven option.
- Continuous feed — continuous operation gives steady gas and the simplest control.
- Single stage plus a gas-tight digestate store as post-digester: sufficient at this scale.
- Heated CSTR or UASB for higher, steadier gas yield per m³
Climate: Yucatán (Mérida), mean 26.9 °C, ≈ 0 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 17.5 °C), Prague (CZ) (Δ 17.9 °C), Copenhagen (DK) (Δ 17.9 °C).
Monthly energy balance
Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.
| Month | Feedstock, t | Gas energy, MWh | Digester heat, MWh | Useful heat, MWh | Net electricity, MWh |
|---|---|---|---|---|---|
| Jan | 3,830 | 462 | 0 | 0 | 158 |
| Feb | 3,491 | 421 | 0 | 0 | 144 |
| Mar | 3,830 | 462 | 0 | 0 | 158 |
| Apr | 3,707 | 447 | 0 | 0 | 152 |
| May | 3,830 | 462 | 0 | 0 | 158 |
| Jun | 3,707 | 447 | 0 | 0 | 152 |
| Jul | 3,830 | 462 | 0 | 0 | 158 |
| Aug | 3,830 | 462 | 0 | 0 | 158 |
| Sept | 3,707 | 447 | 0 | 0 | 152 |
| Oct | 3,830 | 462 | 0 | 0 | 158 |
| Nov | 3,707 | 447 | 0 | 0 | 152 |
| Dec | 3,830 | 462 | 0 | 0 | 158 |
| Σ | 45,130 | 5,443 | 0 | 0 | 1,857 |
CAPEX, OPEX, revenue (base case)
| Digester | 160K |
| Covering existing storage | 96K |
| Feedstock reception and preparation | 22K |
| Gas handling and cleaning | 38K |
| CHP (power + heat) | 430K |
| Electrical systems and controls | 45K |
| Pipework | 30K |
| Civil works | 45K |
| Grid connection | 31K |
| Engineering and permits | 71K |
| Contingency | 96K |
| Total | 1.1M |
| Staff | 9.3K |
| CHP service and overhaul reserve | 44K |
| Maintenance | 13K |
| Insurance | 5.3K |
| Testing and monitoring | 5.6K |
| Total | 76K |
| Electricity self-consumption savings | 250K |
| Incremental digestate value | 34K |
| Total | 290K |
Unit costs are estimates. Replace them with supplier quotations.
Digestate: asset or liability
Status: liability / cost · 44,061 t/yr · nitrogen ≈ 214,368 kg/yr · land needed ≈ 1,261 ha (available 200 ha).
Incremental fertiliser value US$34K/yr, handling US$0/yr, net US$34K/yr.
- Not enough land: ≈ 1261 ha needed at 170 kg N/ha. Surplus digestate is a cost (agreements with neighbours, separation, pelletising).
- Digestate storage for 3 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
- Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate
Expected losses: 2.5 % of methane produced (range 1.5 % – 4 %) ≈ 268 t CO₂e/yr; fossil emissions displaced ≈ 880 t CO₂/yr. Losses vs benefit: 30 %.
- Expected loss 2.5 % is above good practice (2 %): budget for monitoring.
- Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
- Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
- Continuous gas-holder pressure monitoring; a standby flare instead of venting.
- CHP with an oxidation catalyst and tuning regime to cut methane slip.
Avoided emissions from open manure storage are not credited (conservative).
Permits & regulation (indicative)
Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.
- Construction permit and national environmental approval / EIA screeningNew installation · effort: medium · to verify
- Gas-safety approval and hazardous-area classification (IECEx or national code)Methane in the gas phase · effort: medium · to verify
- Effluent / digestate discharge or land-application permitDigestate or treated effluent leaves the site · effort: medium · to verify
Safety (risk register)
- Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
- Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
- Fixed gas detectors in the CHP room and near tanks
- Flame arresters, over/under-pressure relief, safety flare
- Ignition-source control and hot-work permits
- Hydrogen sulphide (H₂S): acute toxicity, corrosion high
- Biological / chemical desulphurisation of the biogas
- Personal H₂S monitors, no lone working
- H₂S monitoring upstream of the CHP (engine protection)
- Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
- Entry only under permit, ventilation, standby person
- Self-contained breathing apparatus for rescue
- Over/under-pressure: membrane roof rupture, tank deformation medium
- Liquid seals / relief valves venting to a safe location
- Gas-holder level and pressure sensors
- CHP: carbon monoxide, fire, high temperatures medium
- CHP room ventilation, CO detectors
- Emergency stop, fire suppression
- Soil and water pollution: slurry/digestate spills, lagoon overflow high
- Bund sized for the largest tank
- Level sensors and a spill-response plan
- Digestate storage covering the closed spreading season
Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.
Assumptions used (145)
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →
- Support: No operating support for biogas; the 2025 Electricity Sector Law raises the distributed-generation threshold to 0.7 MW and simplifies self-supply permits.
- Warm climate allows covered lagoons for pig and dairy effluent.
- The verdict excludes subsidies; national support is shown as separate cases.
- This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
- Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
- Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.
What could break the economics
Each stress test applied to the base case on its own.
- chp: local CAPEX factor
- 0.546 … 1.014 —
- NPV low…high: US$570K … US$1.3M
- Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
- 0.066 … 0.096 —
- NPV low…high: US$700K … US$1.1M
- Mineral potassium price
- 0.7981 … 0.9065 USD/kg K₂O
- NPV low…high: US$940K … US$940K
- Mineral nitrogen price
- 1.17 … 2.035 USD/kg N
- NPV low…high: US$870K … US$1.1M
- Mineral phosphorus price
- 1.588 … 2.068 USD/kg P₂O₅
- NPV low…high: US$940K … US$940K
- Avoidable share of an unsplit customer electricity bill
- 0.7 … 1 —
- NPV low…high: US$510K … US$1.4M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
- Biomethane price without support, base: 0.4477 USD/Nm³ · CALCULATED_VALUE · LOW
- National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- chp: local CAPEX factor: 0.78 — · CALCULATED_VALUE · LOW
- 0.72 traded equipment + 0.28 × local/German labour cost (6.7/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Debt interest rate (EUR-equivalent): 0.061 — · CALCULATED_VALUE · MEDIUM
- Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Debt share for DSCR test: 0.5 — · ENGINEERING_ASSUMPTION · MEDIUM
- Typical agri / project lending (KfW, EBRD, IFC practice)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Debt tenor: 7 a · ENGINEERING_ASSUMPTION · MEDIUM
- Typical
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Digestate that has no adequate land: 4.444 USD/t · CALCULATED_VALUE · MEDIUM
- Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Incremental digestate handling on adequate land: 1.948 USD/t · CALCULATED_VALUE · MEDIUM
- Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.076 — · CALCULATED_VALUE · MEDIUM
- Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 2.72 % (Baa3; Damodaran, 2026-07); not a bank offer
- 2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Wholesale electricity price (market average): 0.04085 USD/kWh · CALCULATED_VALUE · MEDIUM
- CENACE day-ahead market (MDA) zonal prices (PND), unweighted mean of 96 SIN load zones, Oct 2025 – Sep 2026: 760.45 MXN/MWh; converted at 20.8343 MXN/EUR (2026-11-09)
- 2026-09-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
- WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
- Documented nominal reference (may include estimated adders): 0.7605 MXN (ENGINEERING_ASSUMPTION); FX (2026-11-09): 20.83 MXN/EUR (MARKET_DATA)
- Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
- At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
- 15 % profile & balancing discount for a small seller (assumption, same for all markets)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Mineral potassium price: 0.8519 USD/kg K₂O · CALCULATED_VALUE · MEDIUM
- World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
- 2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
- Mineral nitrogen price: 1.489 USD/kg N · CALCULATED_VALUE · MEDIUM
- World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
- 2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
- Mineral phosphorus price: 1.878 USD/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
- World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
- 2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
- Exchange rate: 18.61 MXN/USD · MARKET_DATA · HIGH
- Official EUR reference rate, 2026-11-09
- 2026-11-09 · checked 2026-11-10 · MXN per EUR; dated reference, not a guaranteed transaction rate
- WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
- Value of useful heat (displaced gas / boiler efficiency): 0.02109 USD/kWh th · CALCULATED_VALUE · MEDIUM
- Business gas 16.95792012865184 €/MWh LHV ÷ 0.9
- 2025-12-31 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Documented nominal reference (may include estimated adders): 17.1 USD (ENGINEERING_ASSUMPTION); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA)
- Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
- Shorter than the 20-year technical life — conservative
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Official hourly labour cost, economy-wide (wages + employer costs): 7.546 USD/h · CALCULATED_VALUE · MEDIUM
- IMSS/STPS: average daily contribution salary Sep 2026 666.0 MXN × 365 × 1.30 employer contributions ÷ 2 250 h; converted at 20.8343 MXN/EUR (2026-11-09)
- 2026-09-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
- WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
- Documented nominal reference (may include estimated adders): 140.5 MXN (ENGINEERING_ASSUMPTION); FX (2026-11-09): 20.83 MXN/EUR (MARKET_DATA)
- Plant operator wage relative to the economy-wide average: 1 — · ENGINEERING_ASSUMPTION · MEDIUM
- Plant operator ≈ economy-wide average (middle-income economy; no premium)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
- Inflation target + 0.5 pp wage drift
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Road transport of organic feedstock: 0.08954 USD/(t·km) · CALCULATED_VALUE · MEDIUM
- 0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Loading/unloading per tonne: 0.8171 USD/t · CALCULATED_VALUE · MEDIUM
- 0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
- Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Customer electricity price (invoice split not verified): 0.1612 USD/kWh · USER_INPUT · MEDIUM
- USER_INPUT 3 MXN/kWh / FX 20.8343; Official EUR reference rate, 2026-11-09. Invoice date not supplied; energy/demand split assumed separately.
- REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
- pig_slurry: dry matter: 5.5 % FM · MEASURED · MEDIUM
- MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
- REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
- pig_slurry: volatile solids: 77 % DM · MEASURED · MEDIUM
- MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
- REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
- pig_slurry: BMP (scenarios ± inter-laboratory spread): 290 L CH₄/kg VS · MEASURED · MEDIUM
- MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
- REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
- pig_slurry: dry matter: 5.5 % FM · MEASURED · MEDIUM
- MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
- REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
- pig_slurry: volatile solids: 77 % DM · MEASURED · MEDIUM
- MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
- REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
- pig_slurry: BMP (scenarios ± inter-laboratory spread): 290 L CH₄/kg VS · MEASURED · MEDIUM
- MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
- REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified