Sample report · Ukraine

Mixed farm, 80 cows

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

A small mixed farm with 80 cows asks whether an individual digester is justified. This deliberately represents a project where screening can prevent an unsuitable investment.

Operating assumptions

  • Dairy cows: 80 · Grazing in summer
  • Electricity: 60,000 kWh/yr · Electricity price on your bill (if known): 8.3 UAH/kWh
  • No heat needed
  • Land available for spreading digestate: 150 ha · Distance to the gas grid (for biomethane): —
  • Grid connection? Yes

What to verify

Compare shared digestion, simpler storage improvements and the value of avoiding stand-alone operating overhead. Do not extrapolate large-plant costs to this scale.

Not recommended at this scale

For this amount of feedstock a stand-alone plant makes no economic sense.

  • Energy equivalent ≈ 5 kWe — below 25 kW — and the base-case NPV is negative (-€190K).

Main reason — small scale: the feedstock supports only ≈ 5 kW, while the plant costs ≈ €21K per kW. Digester, storage and CHP are expensive even at small capacity.

What would change the verdict
  • → Consider the simplest option — a biogas boiler for a constant heat need — or supplying feedstock to a larger plant.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

A clear no under these conditions: even the optimistic case does not pay back. Don't spend money on a feasibility study unless one of the changes above happens.

NPV: conservative -€230K · base -€190K · optimistic -€180K

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in < 1 % of cases.

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€100K – €130K
≈ UAH 5.7M (base)
Payback
no payback
base: no payback · no subsidies
NPV (base)
-€190K
range: -€230K … -€180K
Chosen route
Boiler (heat only)
Confidence: Medium

Feedstock and energy

Feedstock potential
880 t/yr
energy ≈ 134 kWh CH₄/t
Biogas
16K – 24K Nm³/yr
≈ 3 Nm³/h (base)
Net energy
0 MWh/yr
Useful heat
Candidate capacity
5 kWe
micro (< 50 kW)

How far you can rely on these numbers

Medium · 74/100
  • Backed by your data and our sources74
  • You can still add+8
  • Limits of our data−8
  • Needs a feasibility study (lab, quotes, contracts)10

74/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainRoute-specific CAPEX lacks independent local validation — obtain comparable supplier quotations+8

With all of it: up to 82/100

Limits on our side

  • Scale outside the CAPEX calibration range (30 kW – 5 MW electrical equivalent)−8

These come from our country price and cost data or the screening scope, not from your project. We update them.

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Existing storage volume not entered: the farm's current slurry store is assumed to hold its own manure (≈ 426 m³) and is only fitted with a gas-tight cover. Enter the real volume; if it is smaller, CAPEX rises by about €120 per missing m³ before overheads.
  • No heat buyer was quantified, so the boiler route earns almost nothing: it is only the cheapest of routes that all lose money. This is not a recommendation to build it — find a heat or power buyer, or add energy-dense feedstock.
Country conditions
  • No subsidy for new small plants: the case rests on own electricity and heat, avoided disposal and energy resilience. Biomethane export to the EU (ISCC) is open to large producers.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 57 MWh a year, valued at ≈ UAH 3.11 per kWh.
Not recommended at this scale-€210K-€11Kheat ≥ UAH 32.4 per kWh
Pool manure with neighbours
100 % more manure from neighbouring farms, trucked ≈ 5 km, into one shared plant.
Not recommended at this scale-€270K-€77K—
Take in food waste
≈ 500 t a year of source-separated food waste from ≈ 15 km away, with a gate fee of UAH 300 per tonne.
Not recommended at this scale-€540K-€350Kgate fee ≥ UAH 9,160 per tonne
Scenario assumptions
  • Co-substrate share of the organic matter (VS) after it is added: 30 % · ASSUMPTION · LOW · 2026-11-02 · Judgement: usual co-digestion share at manure plants; the model applies pasteurisation, rejects and inhibition checks to the new mix.
  • Haul distance of the co-substrate: 15 km · ASSUMPTION · LOW · 2026-11-02 · Judgement: food processors within a regional collection radius.
  • Gate fee received for source-separated food waste: €6/t · ASSUMPTION · LOW · 2026-11-02 · Judgement, deliberately low. WRAP UK Gate Fees Report 2025/26 (3 July 2026): AD gate fees fell from 2024/25 and several councils paid £0 or less. The paid report gives the gate fee at which the scenario breaks even.
  • Haul distance of the neighbours' feedstock: 5 km · ASSUMPTION · LOW · 2026-11-02 · Judgement: neighbouring farms within a few kilometres; slurry hauled much further rarely pays (see the maximum distance per stream).

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Get supplier quotes for the plant-€230K … -€150K—
Verify the market price-€200K … -€190K—
Check the fertiliser value of the digestate-€190K … -€190K—
Weigh or meter the manure actually collected-€190K … -€190K—
Lab test of the methane yield (BMP)-€190K … -€190K—
How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Ukraine.
Feedstock (screening values, to be confirmed):
- dairy cattle slurry: 880 t/year, DM ≈ 8.4 %
Design basis from the screening: raw biogas ≈ 3 Nm³/h at ≈ 55 % CH₄; digester working volume ≈ 84 m³; biogas boiler ≈ 12 kWth; new digestate storage ≈ 0 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

How to check: Weigh or meter the manure actually collected
  1. Count animals by group and housing period for the last 12 months.
  2. Measure slurry pit levels over 30 days (or weigh loads) and take three DM samples.

Then enter it in: Feedstock step: quantity and DM of each stream

How to check: Lab test of the methane yield (BMP)
  1. Take 3–5 subsamples of each stream over 2–4 weeks, mix them, keep them at 4 °C and deliver within 24 h.
  2. Order dry matter (DM), volatile solids (VS) and a methane potential test (BMP, VDI 4630) with the cellulose control reported.
  3. A valid test reports cellulose at 340–395 NL CH₄/kg VS; ask for a repeat otherwise.
Request to send
Request for quotation: biogas potential analysis
Site: Ukraine.
Feedstock (screening values, to be confirmed):
- dairy cattle slurry: 880 t/year, DM ≈ 8.4 %
Design basis from the screening: raw biogas ≈ 3 Nm³/h at ≈ 55 % CH₄; digester working volume ≈ 84 m³; biogas boiler ≈ 12 kWth; new digestate storage ≈ 0 m³.
Per sample please quote: dry matter (DM, % of fresh mass), volatile solids (VS, % of DM) and biochemical methane potential (BMP, NL CH₄ per kg VS) to VDI 4630, with the cellulose control result and the test duration. Please state price, turnaround time and sampling and shipping instructions.

Then enter it in: Feedstock step: DM, VS and BMP on each stream

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Highest installed cost at NPV = 0
not reachable
now €110K
Feedstock price headroom
€32.5/t
needs €32.5 per tonne less cost, or a gate fee, on every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-€210K
Median NPV
-€200K
NPV P90 (1 in 10 better)
-€190K
Chance that NPV > 0
< 1 %
Median payback
no payback

Reality check: on 41 operating US farm digesters, reported power output was 0.3–1.6 × this model's estimate for 8 in 10 plants (EPA AgSTAR, self-reported). Until feedstock is weighed and lab-tested, one plant can miss the forecast by that much — more than the range above shows.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: -190K)

  1. CAPEX +20 %-26K
  2. Maintenance +30 %-4.5K
  3. Feedstock potential −20 %-610
  4. CH₄ −20 %0
  5. Useful heat (economic) −50 %0
  6. Feedstock transport +50 %0
  7. CHP downtime +10 pp0
  8. Energy prices −20 %820
NPV = 0 if CAPEX falls by
not reachable
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
not reachable
relative to the base case

Scenarios

Route: Boiler (heat only). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€460
  • Incremental digestate value460
OPEX / yr€13K
  • Testing and monitoring5K
  • Staff4.3K
  • Maintenance2.2K
  • Purchased electricity610
Operating margin (EBITDA)-€12K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr16.121.524.2
CAPEX€130K€110K€100K
OPEX / yr€15K€13K€12K
Revenue + savings / yr€300€460€560
Operating margin (EBITDA)-€15K-€12K-€11K
Simple paybackno paybackno paybackno payback
Discounted paybackno paybackno paybackno payback
NPV-€230K-€190K-€180K
IRR———
DSCR (min)-1.3-1.3-1.3

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 50 % debt (no taxes).

Cumulative cash flow, €
-430K-320K-200K-90K25K03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) €160K-€10Kno payback-€230K-€290K … -€200K
Boiler (heat only) chosen€110K-€12Kno payback-€190K-€230K … -€180K
Biomethane €760K-€27Kno payback-€940K-€1.2M … -€830K
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 2 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 440Boiler (heat only)3€92K-€170K
× 0.75 660Boiler (heat only)4€100K-€180K
× 1 your input880Boiler (heat only)5€110K-€190K
× 1.5 1,300Boiler (heat only)8€130K-€220K
× 2 1,800Boiler (heat only)10€150K-€240K
× 3 2,600Boiler (heat only)16€180K-€270K

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

Schemes are running, but your project does not meet their conditions

Main obstacle — Аукціон з ринковою премією (інші ВДЕ) — market-premium auction: Too small for a CHP plant. Details ↓

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Country overviewchecked 30 Oct 2026

The only route for new plants is market-premium auctions (bid cap 12 €c/kWh; the 'other RES' lot of 30.10.2026 did not take place; indicative biogas quotas 21–29 MW a year for 2027–2030). The green tariff ends on 01.01.2030 and has no EUR floor for plants commissioned after 2024. Biomethane: export, no subsidy.

Running, awarded by competition (1)

Support goes to the winners of a round or auction. The case assumes an award at the stated value.

Аукціон з ринковою премією (інші ВДЕ) — market-premium auction

Competitive
Electricity tariff
Does not qualify
Too small for a CHP plant.

Not calculated: the project does not meet the conditions.

Conditions
  • not met: CHP of a practical size, from 25 kW (project ≈ 5 kW)
What the case uses
  • Route: CHP (power + heat)
  • Tariff: €0.12/kWh
Scheme terms

Bid cap 12 €c/kWh; your own winning bid is guaranteed via a market premium. The 30.10.2026 lot did not take place (Prozorro).

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Source: Guaranteed Buyer notice 03.09.2026 (150 MW, cap 12 €c); Prozorro: auction did not take place; CMU order 298-р (508-р); Law 555-IV Art. 9-3 · checked 30 Oct 2026 · Data confidence: Low

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

0/100

Of every 100 kWh of energy in the methane, 0 become a product that earns money or replaces a purchase.

100 % = 120 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Runs the plant

  • Digester heating33 MWh 28 %

Produced, not used

  • Heat with no buyer71 MWh 61 %

Losses

  • Conversion losses (engine, boiler)12 MWh 10 %
  • Methane leaks1.8 MWh 2 %

What this means for the project

  • 71 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income.
  • The plant uses 28 % of its energy itself, mostly to heat the digester in winter. Insulation, heat recovery from the digestate and a drier feedstock mix reduce it.
  • The plant buys 3.7 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Heat need
no heat userYour data
Methane leaks, base case
2 %Assumption

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 36 % of that month’s methane energy, in August 20 %.

January: methane energy 9.9 MWh · digester heating 3.6 MWh (36 %) · heat for a user 0 MWh

  • Methane energy of the month
  • Digester heating

How it works: from feedstock to products

  1. Feedstock880 t/yr
  2. Biogas22K Nm³/yr
  3. Useful heat0 MWh
  4. Heat without demand71 MWh
  5. Digestate850 t/yr
Heat produced (gross)
105 MWh
Digester heat demand
33 MWh
Useful heat (economic)
0 MWh of 71
Power: own use / sold
0 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
-99 g CO₂e/MJ
gas-tight digestate storage
Fossil comparator
80 g CO₂e/MJ
Greenhouse-gas saving
224 %
RED minimum: 80 %
Avoided emissions
0 t CO₂e
  • Meets the RED minimum.
  • Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
47/100
  • Energy equivalent ≈ 5 kWe (scale score 4/100)
  • Feedstock energy ≈ 134 kWh of methane per tonne (score 28/100)
  • Feedstock available 12 of 12 months
Energy fit
0/100
  • Own consumption absorbs 0 % of the electricity produced
  • Useful heat 0 MWh of 71 MWh available after digester needs
Location & logistics
100/100
  • No critical site constraints found from your answers
Technical feasibility
55/100
  • Energy equivalent below 25 kWe: hardly sensible technically
Economics
0/100
  • Operating margin ≤ 0 — no payback
  • Base-case NPV is negative
  • Minimum DSCR -1.27 — below the usual bank threshold of 1.2–1.3
Regulatory complexity
27/100 risk
  • Number and weight of permitting / regulatory steps: 11 points (more = harder)
Environmental risk
20/100 risk
  • Expected methane loss 1.5 % — within good practice if gas-tight and monitored
Overall project viability
36/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Location & logistics (100); weakest: Economics (0).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Dairy cattle slurry8808.413.4on site≈ 18 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Wet mesophilic digestion (CSTR)

Vertical CSTR with mechanical mixing and a membrane gas holder

Working volume
≈ 84 m³
Retention time
35 days
Loading rate
1.9 kg VS/(m³·d)
Digestate storage
≈ 430 m³
  • Dry matter 8.4 %: a liquid mix suited to wet mesophilic digestion.
  • Continuous feed — continuous operation gives steady gas and the simplest control.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Single stage plus a gas-tight digestate store as post-digester: sufficient at this scale.
Alternatives
  • Horizontal plug-flow as a simpler option for small cattle-manure plants

Climate: Zakarpattia oblast (Uzhhorod), mean 11.8 °C, ≈ 2,628 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 2 °C), Prague (CZ) (Δ 2.1 °C), Kraków (PL) (Δ 2.5 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan7510400
Feb689300
Mar7510300
Apr7210300
May7510300
Jun7210200
Jul7510200
Aug7510200
Sept7210200
Oct7510300
Nov7210300
Dec7510300
Σ8801163300
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester24K
Covering existing storage6.3K
Feedstock reception and preparation20K
Gas handling and cleaning24K
Boiler (heat only)1K
Electrical systems and controls4.4K
Pipework3K
Civil works4.4K
Grid connection7.8K
Engineering and permits7.5K
Contingency10K
Total110K
OPEX / yr (EUR)
Staff4.3K
Maintenance2.2K
Insurance560
Testing and monitoring5K
Purchased electricity610
Total13K
Revenue + savings / yr (EUR)
Incremental digestate value460
Total460

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: neutral · 852 t/yr · nitrogen ≈ 3,305 kg/yr · land needed ≈ 19 ha (available 150 ha).

Incremental fertiliser value €460/yr, handling €0/yr, net €460/yr.

  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 1.5 % of methane produced (range 0.5 % – 3 %) ≈ 3 t CO₂e/yr; fossil emissions displaced ≈ 0 t CO₂/yr.

  • Methane losses could cancel the climate benefit. Do not claim emission reductions without measurements.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Urban-planning conditions and construction permit (consequence class to be confirmed)
    New installation · effort: medium · to verify
  • Environmental impact assessment / screening (thresholds to be confirmed)
    Biogas plant as an organic-waste facility · effort: medium · to verify
  • Registration of high-hazard equipment and gas-system expert review
    Gas holders, CHP under pressure · effort: medium · to verify
  • Fire safety and explosion-hazard zoning
    Methane in the gas phase · effort: medium · to verify
  • Air-emission permit for stationary sources (CHP, flare)
    Biogas combustion · effort: lower · to verify
  • Digestate use as fertiliser: status under the pesticides & agrochemicals law and application rules
    Digestate goes to fields · effort: medium · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (161)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: The only route for new plants is market-premium auctions (bid cap 12 €c/kWh; the 'other RES' lot of 30.10.2026 did not take place; indicative biogas quotas 21–29 MW a year for 2027–2030). The green tariff ends on 01.01.2030 and has no EUR floor for plants commissioned after 2024. Biomethane: export, no subsidy.
  • No subsidy for new small plants: the case rests on own electricity and heat, avoided disposal and energy resilience. Biomethane export to the EU (ISCC) is open to large producers.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

boiler: local CAPEX factor
0.546 … 1.014 —
NPV low…high: -€230K … -€150K
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country & war risk)
0.139 … 0.169 —
NPV low…high: -€200K … -€190K
Mineral potassium price
0.713 … 0.8099 EUR/kg K₂O
NPV low…high: -€190K … -€190K
Mineral nitrogen price
1.045 … 1.818 EUR/kg N
NPV low…high: -€190K … -€190K
Mineral phosphorus price
1.419 … 1.847 EUR/kg P₂O₅
NPV low…high: -€190K … -€190K
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base (EU export netback): 0.68 EUR/Nm³ · CALCULATED_VALUE · LOW
EU export: TTF 46.49 €/MWh HHV × 1.11 HHV/LHV + 20 €/MWh LHV green-gas premium (engineering assumption, no official GO price); World Bank Pink Sheet (2026-10-02), Natural gas Europe (TTF), mean Q4 2025 – Q3 2026 15.25 $/mmbtu GCV ÷ 0.2931 MWh/mmbtu at 1.1193 USD/EUR; minus Ukrainian GTS exit tariff 1.5113 EUR/MWh HHV (NEURC 2387); × 9.67 kWh/Nm³. EU entry, onward transport and certification not deducted; no guaranteed offtake
2025-07 / 2026-06 · checked 2026-11-11 · Unsupported biomethane: domestic gas parity (conservative) or EU export netback (base); exports were 65 % of Ukrainian biomethane in Q2 2026
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
boiler: local CAPEX factor: 0.78 — · CALCULATED_VALUE · LOW
0.72 traded equipment + 0.28 × local/German labour cost (5.7/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR): 0.1 — · ENGINEERING_ASSUMPTION · LOW
Indicative financing assumption informed by EBRD / IFC-backed credit programmes; not a bank term sheet
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt share for DSCR test: 0.5 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical EBRD/IFI-style lending for agrifood
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 7 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical for agri/energy credit lines (EBRD, IFC, EIB programmes)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 3.6 EUR/t · CALCULATED_VALUE · MEDIUM
2.5 €/t + 0.22 h/t × 4.9 €/h labour (same formula as every market)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 1.6 EUR/t · CALCULATED_VALUE · MEDIUM
1.2 €/t machinery + 0.08 h/t × 4.9 €/h labour (same formula as every market)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country & war risk): 0.149 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 14.85 % (Ca; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.1255 EUR/kWh · CALCULATED_VALUE · MEDIUM
Market Operator (OREE), DAM BASE index, IPS of Ukraine, mean of monthly values Oct 2025 – Sep 2026: 6 377 UAH/MWh excl. VAT; converted at 50.8152 UAH/EUR (2026-11-10)
2026-09-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 6.377 UAH (ENGINEERING_ASSUMPTION); FX (2026-11-10): 50.82 UAH/EUR (MARKET_DATA)
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
Conservative; UAH price rises offset by depreciation (EUR terms)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
30 % profile & balancing discount for a small seller (assumption)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 50.82 UAH/EUR · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-10
2026-11-10 · checked 2026-11-10 · UAH per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Value of useful heat (displaced industrial gas / boiler efficiency): 0.06111 EUR/kWh th · CALCULATED_VALUE · MEDIUM
Business gas price: NEURC gas market monitoring Q2 2026: non-household retail price, unregulated segment, 23 697 UAH/1 000 m³ excl. VAT, transmission and distribution + NEURC tariffs: transmission exit to distribution systems 501.97 UAH per 1 000 m³/day (resolution 2387 of 30.12.2024, flat load) + non-household distribution from 01.04.2026, median of 35 operators 2.35 UAH/m³ (range 0.46–3.92) = 26 549 UAH/1 000 m³ excl. VAT; converted at 50.8152 UAH/EUR (2026-11-10)
2026-06-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 2,795 UAH (ENGINEERING_ASSUMPTION); FX (2026-11-10): 50.82 UAH/EUR (MARKET_DATA)
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-y technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Historical hourly labour-cost reference (wages + employer costs): 4.975 EUR/h · CALCULATED_VALUE · MEDIUM
Derzhstat: average wage of full-time employees Sep 2026 33 153 UAH/month × 1.22 employer contributions ÷ 160 h; skilled operator premium 1.14; converted at 50.8152 UAH/EUR (2026-11-10)
2026-09-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 252.8 UAH (ENGINEERING_ASSUMPTION); FX (2026-11-10): 50.82 UAH/EUR (MARKET_DATA)
Plant operator wage relative to the economy-wide average: 1.14 — · ENGINEERING_ASSUMPTION · MEDIUM
Skilled plant operator ≈ 30 k UAH/month gross vs the 26.5 k average → ≈ 4.9 €/h operator cost
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.03 — · ENGINEERING_ASSUMPTION · MEDIUM
Wage growth > CPI in UA (NBU inflation report)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of liquid/solid organic feedstock: 0.11 EUR/(t·km) · ENGINEERING_ASSUMPTION · LOW
Tanker/tipper rate incl. empty return; diesel-driven; TO VERIFY with 3 hauliers
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Loading/unloading per tonne: 0.7 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × 4.9 €/h labour (same KTBL-based formula as every market)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.1633 EUR/kWh · USER_INPUT · MEDIUM
USER_INPUT 8.3 UAH/kWh / FX 50.8152; Official EUR reference rate, 2026-11-10. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified