Sample report · Moldova

Fruit & vegetable processing · Fruit & vegetable residues: 400 t/yr

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

A mid-size Moldovan winery produces about 400 t of grape marc in a September–October peak; in Moldova marc is mostly landfilled. A 2011 study modelled a payback under five years for a larger winery; this calculation is much less optimistic.

Operating assumptions

  • Fruit & vegetable residues: 400 t/yr · DM: 35 % · 2 months · Season starts: September · Spread on our own fields
  • Electricity: 250,000 kWh/yr · Electricity price on your bill (if known): 3 MDL/kWh
  • No heat needed
  • Land available for spreading digestate: 120 ha · Distance to the gas grid (for biomethane): —
  • Grid connection? Yes

What to verify

Compare with composting, distillation of marc, or a shared digester serving several wineries in the district.

Not recommended at this scale

For this amount of feedstock a stand-alone plant makes no economic sense.

  • Energy equivalent ≈ 18 kWe — below 25 kW — and the base-case NPV is negative (-€630K).

Main reason — small scale: the feedstock supports only ≈ 18 kW, while the plant costs ≈ €24K per kW. Digester, storage and CHP are expensive even at small capacity.

What would change the verdict
  • → Consider the simplest option — a biogas boiler for a constant heat need — or supplying feedstock to a larger plant.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

A clear no under these conditions: even the optimistic case does not pay back. Don't spend money on a feasibility study unless one of the changes above happens.

NPV: conservative -€770K · base -€630K · optimistic -€570K

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in < 1 % of cases.

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€390K – €520K
≈ MDL 8.8M (base)
Payback
no payback
base: no payback · no subsidies
NPV (base)
-€630K
range: -€770K … -€570K
Chosen route
Boiler (heat only)
Confidence: Medium

Feedstock and energy

Feedstock potential
400 t/yr
energy ≈ 1,027 kWh CH₄/t
Biogas
56K – 83K Nm³/yr
≈ 9 Nm³/h (base)
Net energy
0 MWh/yr
Useful heat
Candidate capacity
18 kWe
micro (< 50 kW)

How far you can rely on these numbers

Medium · 74/100
  • Backed by your data and our sources74
  • You can still add+8
  • Limits of our data−8
  • Needs a feasibility study (lab, quotes, contracts)10

74/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainRoute-specific CAPEX lacks independent local validation — obtain comparable supplier quotations+8

With all of it: up to 82/100

Limits on our side

  • Scale outside the CAPEX calibration range (30 kW – 5 MW electrical equivalent)−8

These come from our country price and cost data or the screening scope, not from your project. We update them.

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Entered dry matter 35 % is far from the typical 15 % for "fruit & vegetable residues": check that it is % of fresh mass.
  • Seasonal stream (2 months): equipment sits idle for the rest of the year.
  • No heat buyer was quantified, so the boiler route earns almost nothing: it is only the cheapest of routes that all lose money. This is not a recommendation to build it — find a heat or power buyer, or add energy-dense feedstock.
Country conditions
  • High energy-import dependence makes self-consumption valuable; small market.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 280 MWh a year, valued at ≈ MDL 1.46 per kWh.
Not recommended at this scale-€530K+€100Kheat ≥ MDL 6.14 per kWh
Order of action
  1. 1Find a heat buyer for ≈ 280 MWh a year (heat ≥ MDL 6.14 per kWh).

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Get supplier quotes for the plant-€790K … -€470K—
Verify the market price-€650K … -€610K—
Check the fertiliser value of the digestate-€630K … -€630K—
Lab test of the methane yield (BMP)-€630K … -€630K—
How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Moldova.
Feedstock (screening values, to be confirmed):
- fruit & vegetable residues: 400 t/year, DM ≈ 35.0 %
Design basis from the screening: raw biogas ≈ 50 Nm³/h at ≈ 56 % CH₄; digester working volume ≈ 600 m³; biogas boiler ≈ 42 kWth; new digestate storage ≈ 150 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

How to check: Lab test of the methane yield (BMP)
  1. Take 3–5 subsamples of each stream over 2–4 weeks, mix them, keep them at 4 °C and deliver within 24 h.
  2. Order dry matter (DM), volatile solids (VS) and a methane potential test (BMP, VDI 4630) with the cellulose control reported.
  3. A valid test reports cellulose at 340–395 NL CH₄/kg VS; ask for a repeat otherwise.
Request to send
Request for quotation: biogas potential analysis
Site: Moldova.
Feedstock (screening values, to be confirmed):
- fruit & vegetable residues: 400 t/year, DM ≈ 35.0 %
Design basis from the screening: raw biogas ≈ 50 Nm³/h at ≈ 56 % CH₄; digester working volume ≈ 600 m³; biogas boiler ≈ 42 kWth; new digestate storage ≈ 150 m³.
Per sample please quote: dry matter (DM, % of fresh mass), volatile solids (VS, % of DM) and biochemical methane potential (BMP, NL CH₄ per kg VS) to VDI 4630, with the cellulose control result and the test duration. Please state price, turnaround time and sampling and shipping instructions.

Then enter it in: Feedstock step: DM, VS and BMP on each stream

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Highest installed cost at NPV = 0
not reachable
now €440K
Feedstock price headroom
€183/t
needs €183 per tonne less cost, or a gate fee, on every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-€710K
Median NPV
-€660K
NPV P90 (1 in 10 better)
-€620K
Chance that NPV > 0
< 1 %
Median payback
no payback

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: -630K)

  1. CAPEX +20 %-110K
  2. Maintenance +30 %-23K
  3. Feedstock potential −20 %-520
  4. CH₄ −20 %0
  5. Useful heat (economic) −50 %0
  6. Feedstock transport +50 %0
  7. CHP downtime +10 pp0
  8. Energy prices −20 %3.4K
NPV = 0 if CAPEX falls by
not reachable
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
not reachable
relative to the base case

Scenarios

Route: Boiler (heat only). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€310
  • Incremental digestate value310
OPEX / yr€23K
  • Maintenance8.7K
  • Staff5.2K
  • Testing and monitoring5K
  • Insurance2.2K
Operating margin (EBITDA)-€23K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr5673.682.8
CAPEX€520K€440K€390K
OPEX / yr€29K€23K€21K
Revenue + savings / yr€200€310€380
Operating margin (EBITDA)-€28K-€23K-€21K
Simple paybackno paybackno paybackno payback
Discounted paybackno paybackno paybackno payback
NPV-€770K-€630K-€570K
IRR———
DSCR (min)-0.6-0.6-0.6

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 50 % debt (no taxes).

Cumulative cash flow, €
-1.1M-810K-520K-230K62K03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) €720K-€11Kno payback-€820K-€1.1M … -€700K
Boiler (heat only) chosen€440K-€23Kno payback-€630K-€770K … -€570K
Biomethane €1.4M-€43Kno payback-€1.7M-€2.2M … -€1.5M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 9 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 200Boiler (heat only)9€340K-€500K
× 0.75 300Boiler (heat only)14€390K-€570K
× 1 your input400Boiler (heat only)18€440K-€630K
× 1.5 600Boiler (heat only)27€530K-€750K
× 2 800Boiler (heat only)36€620K-€870K
× 3 1,200Boiler (heat only)55€790K-€1.1M

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

Support may be possible, but eligibility is not confirmed

It pays no more than the market, so it does not improve the economics.

Best option: Tarif fix – biogaz (ANRE) Details ↓

NPV change
-€200K
NPV with support
-€830K
Payback
no payback
IRR
—

Next step: Ask the scheme operator in writing whether your project meets the conditions the model does not check.

Country overviewchecked 30 Oct 2026

Moldova keeps a fixed biogas tariff (2.37 MDL ≈ €0.12/kWh, 15 years) for small producers; the biogas quota is largely unused (7 MW built of 65 MW).

Open for applications (1)

You can apply now on the published terms.

Tarif fix – biogaz (ANRE)

Open
Electricity tariff
Eligibility to confirm
Some conditions of this scheme are not checked by the model (see the note): shown "if eligible". Confirm them with the scheme operator.
NPV change
-€200K
NPV with support
-€830K
Payback
no payback
IRR
—
Conditions
  • met: Electrical capacity up to 4,000 kW (project ≈ 120 kW)
  • met: CHP of a practical size, from 25 kW (project ≈ 120 kW)
Not checked by the model — confirm with the operator:
  • no data: Manure and agricultural-waste biogas only
What the case uses
  • Route: CHP (power + heat)
  • Tariff: €0.118/kWh
Scheme terms

2.37 MDL/kWh in force for manure and agricultural-waste biogas (ANRE, 07.10.2025); revised yearly per cohort; a 2026 draft is under consultation.

Next step: Ask the scheme operator in writing whether your project meets the conditions the model does not check.

Source: ANRE decision of 07.10.2025 on fixed tariffs; Law 10/2016 · checked 30 Oct 2026 · Data confidence: Medium

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

0/100

Of every 100 kWh of energy in the methane, 0 become a product that earns money or replaces a purchase.

100 % = 410 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Runs the plant

  • Digester heating15 MWh 4 %

Produced, not used

  • Heat with no buyer350 MWh 85 %

Losses

  • Conversion losses (engine, boiler)40 MWh 10 %
  • Methane leaks6.2 MWh 2 %

What this means for the project

  • 350 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income.
  • The plant buys 13 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Heat need
no heat userYour data
Methane leaks, base case
2 %Assumption

Season: how much the digester takes for itself

In October heating the digester needs heat equal to 4 % of that month’s methane energy, in September 3 %.

October: methane energy 210 MWh · digester heating 8.4 MWh (4 %) · heat for a user 0 MWh

  • Methane energy of the month
  • Digester heating

How it works: from feedstock to products

  1. Feedstock400 t/yr
  2. Biogas74K Nm³/yr
  3. Useful heat0 MWh
  4. Heat without demand350 MWh
  5. Digestate310 t/yr
Heat produced (gross)
364 MWh
Digester heat demand
15 MWh
Useful heat (economic)
0 MWh of 349
Power: own use / sold
0 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
63 g CO₂e/MJ
open digestate storage
Fossil comparator
80 g CO₂e/MJ
Greenhouse-gas saving
21 %
RED minimum: 80 %
Avoided emissions
0 t CO₂e
  • Below the RED minimum: a gas-tight digestate store, off-gas combustion or more manure in the mix raise the saving.
  • Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.
  • Residues other than manure, maize and food waste use the RED biowaste values.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
47/100
  • Energy equivalent ≈ 18 kWe (scale score 15/100)
  • Feedstock energy ≈ 1027 kWh of methane per tonne (score 90/100)
  • Feedstock available 2 of 12 months
Energy fit
0/100
  • Own consumption absorbs 0 % of the electricity produced
  • Useful heat 0 MWh of 349 MWh available after digester needs
Location & logistics
100/100
  • No critical site constraints found from your answers
Technical feasibility
35/100
  • Energy equivalent below 25 kWe: hardly sensible technically
  • Seasonal feedstock: equipment under-used
  • Dry digestion — fewer suppliers
Economics
0/100
  • Operating margin ≤ 0 — no payback
  • Base-case NPV is negative
  • Minimum DSCR -0.62 — below the usual bank threshold of 1.2–1.3
Regulatory complexity
5/100 risk
  • Number and weight of permitting / regulatory steps: 6 points (more = harder)
Environmental risk
20/100 risk
  • Expected methane loss 1.5 % — within good practice if gas-tight and monitored
Overall project viability
36/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Location & logistics (100); weakest: Economics (0).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Fruit & vegetable residues40035103on site≈ 245 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Dry (high-solids) digestion, mesophilic

Garage (box) batch digesters with percolate recirculation, or horizontal plug-flow

Working volume
≈ 600 m³
Retention time
92 days
Loading rate
3.5 kg VS/(m³·d)
Digestate storage
≈ 150 m³
  • Average mix dry matter 35 % ≥ 22 %: wet digestion would need dilution, increasing volume and heat losses.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Single stage plus a gas-tight digestate store as post-digester: sufficient at this scale.
Alternatives
  • Wet digestion diluted with slurry/effluent — cheaper equipment, larger digester

Climate: Southern Moldova (Cahul), mean 12.8 °C, ≈ 2,460 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 3.2 °C), Prague (CZ) (Δ 3.2 °C), Kraków (PL) (Δ 3.6 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan00000
Feb00000
Mar00000
Apr00000
May00000
Jun00000
Jul00000
Aug00000
Sept197199700
Oct203206800
Nov00000
Dec00000
Σ4004051500
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester130K
New covered storage4.6K
New open storage4.9K
Feedstock reception and preparation120K
Gas handling and cleaning28K
Boiler (heat only)21K
Electrical systems and controls19K
Pipework12K
Civil works19K
Grid connection7.8K
Engineering and permits29K
Contingency40K
Total440K
OPEX / yr (EUR)
Staff5.2K
Maintenance8.7K
Insurance2.2K
Testing and monitoring5K
Purchased electricity1.9K
Total23K
Revenue + savings / yr (EUR)
Incremental digestate value310
Total310

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: neutral · 306 t/yr · nitrogen ≈ 2,217 kg/yr · land needed ≈ 13 ha (available 120 ha).

Incremental fertiliser value €310/yr, handling €0/yr, net €310/yr.

  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 1.5 % of methane produced (range 0.5 % – 3 %) ≈ 12 t CO₂e/yr; fossil emissions displaced ≈ 0 t CO₂/yr.

  • Methane losses could cancel the climate benefit. Do not claim emission reductions without measurements.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Construction permit and national environmental approval / EIA screening
    New installation · effort: medium · to verify
  • Gas-safety approval and hazardous-area classification (IECEx or national code)
    Methane in the gas phase · effort: medium · to verify
  • Effluent / digestate discharge or land-application permit
    Digestate or treated effluent leaves the site · effort: medium · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (160)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: Moldova keeps a fixed biogas tariff (2.37 MDL ≈ €0.12/kWh, 15 years) for small producers; the biogas quota is largely unused (7 MW built of 65 MW).
  • High energy-import dependence makes self-consumption valuable; small market.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

boiler: local CAPEX factor
0.546 … 1.014 —
NPV low…high: -€790K … -€470K
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.091 … 0.121 —
NPV low…high: -€650K … -€610K
Mineral potassium price
0.713 … 0.8099 EUR/kg K₂O
NPV low…high: -€630K … -€630K
Mineral nitrogen price
1.045 … 1.818 EUR/kg N
NPV low…high: -€630K … -€630K
Mineral phosphorus price
1.419 … 1.847 EUR/kg P₂O₅
NPV low…high: -€630K … -€630K
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.4 EUR/Nm³ · CALCULATED_VALUE · LOW
National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
boiler: local CAPEX factor: 0.78 — · CALCULATED_VALUE · LOW
0.72 traded equipment + 0.28 × local/German labour cost (7/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.086 — · CALCULATED_VALUE · LOW
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.5 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 7 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 4.04 EUR/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 1.76 EUR/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.101 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 6.81 % (B2; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.1361 EUR/kWh · CALCULATED_VALUE · MEDIUM
OPEM day-ahead market (PZU) base price, Jul – Sep 2026 (first liquid months): 2 732 MDL/MWh; converted at 20.0749 MDL/EUR (2026-11-10)
2026-09-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 2.732 MDL (ENGINEERING_ASSUMPTION); FX (2026-11-10): 20.07 MDL/EUR (MARKET_DATA)
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 20.07 MDL/EUR · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-10
2026-11-10 · checked 2026-11-10 · MDL per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Value of useful heat (displaced gas / boiler efficiency): 0.07264 EUR/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 65.379 €/MWh LHV ÷ 0.9
2026-S1 · checked 2026-10-31 · GJ10000-99999; reference band, customer gas use unknown
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 6.958 EUR/h · CALCULATED_VALUE · MEDIUM
NBS Moldova: average gross monthly earnings Q2 2026 16 895.7 MDL × 12 × 1.24 employer contributions ÷ 1 800 h; converted at 20.0749 MDL/EUR (2026-11-10)
2026-06-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 139.7 MDL (ENGINEERING_ASSUMPTION); FX (2026-11-10): 20.07 MDL/EUR (MARKET_DATA)
Plant operator wage relative to the economy-wide average: 1 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ economy-wide average (middle-income economy; no premium)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.081 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 0.74 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.1494 EUR/kWh · USER_INPUT · MEDIUM
USER_INPUT 3 MDL/kWh / FX 20.0749; Official EUR reference rate, 2026-11-10. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
fruit_veg_residues: dry matter: 35 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified