Sample report · Latvia

Municipality / waste operator · Municipal biowaste: 600 t/yr

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

A small Latgale municipality has to collect biowaste separately (mandatory in the EU since 2024) and asks whether to build its own digester. With 600 t a year the volume is too small.

Operating assumptions

  • Municipal biowaste: 600 t/yr · DM: 30 % · 12 months · Other / don't know · Delivered from another site: 10 km · Purchase price / gate fee: -40 EUR/t
  • Electricity: 40,000 kWh/yr · Electricity price on your bill (if known): 0.14 EUR/kWh
  • No heat needed
  • Land available for spreading digestate: 30 ha · Distance to the gas grid (for biomethane): —
  • Grid connection? Yes

What to verify

Compare a composting site with a contract at a regional digester, and check collection quality before any investment.

Not recommended at this scale

For this amount of feedstock a stand-alone plant makes no economic sense.

  • Energy equivalent ≈ 17 kWe — below 25 kW — and the base-case NPV is negative (-€560K).

Main reason — small scale: the feedstock supports only ≈ 17 kW, while the plant costs ≈ €24K per kW. Digester, storage and CHP are expensive even at small capacity.

What would change the verdict
  • → Consider the simplest option — a biogas boiler for a constant heat need — or supplying feedstock to a larger plant.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

A clear no under these conditions: even the optimistic case does not pay back. Don't spend money on a feasibility study unless one of the changes above happens.

NPV: conservative -€770K · base -€560K · optimistic -€470K

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in < 1 % of cases.

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€370K – €490K
Payback
no payback
base: no payback · no subsidies
NPV (base)
-€560K
range: -€770K … -€470K
Chosen route
Boiler (heat only)
Confidence: Medium

Feedstock and energy

Feedstock potential
600 t/yr
energy ≈ 628 kWh CH₄/t
Biogas
48K – 74K Nm³/yr
≈ 8 Nm³/h (base)
Net energy
0 MWh/yr
Useful heat
Candidate capacity
17 kWe
micro (< 50 kW)

How far you can rely on these numbers

Medium · 82/100
  • Backed by your data and our sources82
  • Limits of our data−8
  • Needs a feasibility study (lab, quotes, contracts)10

82/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

You have entered everything this screening can use.

Limits on our side

  • Scale outside the CAPEX calibration range (30 kW – 5 MW electrical equivalent)−8

These come from our country price and cost data or the screening scope, not from your project. We update them.

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Parameters for "municipal biowaste (food + garden)" have low confidence — a laboratory analysis (BMP) is needed.
  • Animal by-products (Cat. 3) → pasteurisation and veterinary approval required.
  • No heat buyer was quantified, so the boiler route earns almost nothing: it is only the cheapest of routes that all lose money. This is not a recommendation to build it — find a heat or power buyer, or add energy-dense feedstock.
Country conditions
  • Poultry-manure biomethane (Balticovo) proves the industrial route.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 240 MWh a year, valued at ≈ €0.0685 per kWh.
Not recommended at this scale-€430K+€130Kheat ≥ €0.244 per kWh
Order of action
  1. 1Find a heat buyer for ≈ 240 MWh a year (heat ≥ €0.244 per kWh).

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Get supplier quotes for the plant-€710K … -€400K—
Fix feedstock prices and gate fees in contracts-€620K … -€490K—
Secure the feedstock supply in writing-€590K … -€560K—
Verify the market price-€570K … -€540K—
Check the fertiliser value of the digestate-€560K … -€550K—
Lab test of the methane yield (BMP)-€560K … -€560K—
How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Latvia.
Feedstock (screening values, to be confirmed):
- municipal biowaste (food + garden): 600 t/year, DM ≈ 30.0 %
Design basis from the screening: raw biogas ≈ 8 Nm³/h at ≈ 58 % CH₄; digester working volume ≈ 99 m³; biogas boiler ≈ 38 kWth; new digestate storage ≈ 260 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Fix feedstock prices and gate fees in contracts
  1. For every purchased stream and every gate fee, note today's price and its range over the last three years.
  2. Fix prices or gate fees with indexation for the loan period, and check that the plan still pays with prices 25 % worse.
Request to send
Request for a feedstock supply agreement
Site: Latvia. A biogas plant would take:
- municipal biowaste (food + garden): 600 t/year, DM ≈ 30.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Secure the feedstock supply in writing
  1. List every stream you do not produce yourself: supplier, tonnes per month, season and contract term.
  2. Get letters of intent or contracts for at least the loan period, and size the plant on the tonnage that is signed, not promised.
Request to send
Request for a feedstock supply agreement
Site: Latvia. A biogas plant would take:
- municipal biowaste (food + garden): 600 t/year, DM ≈ 30.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

How to check: Lab test of the methane yield (BMP)
  1. Take 3–5 subsamples of each stream over 2–4 weeks, mix them, keep them at 4 °C and deliver within 24 h.
  2. Order dry matter (DM), volatile solids (VS) and a methane potential test (BMP, VDI 4630) with the cellulose control reported.
  3. A valid test reports cellulose at 340–395 NL CH₄/kg VS; ask for a repeat otherwise.
Request to send
Request for quotation: biogas potential analysis
Site: Latvia.
Feedstock (screening values, to be confirmed):
- municipal biowaste (food + garden): 600 t/year, DM ≈ 30.0 %
Design basis from the screening: raw biogas ≈ 8 Nm³/h at ≈ 58 % CH₄; digester working volume ≈ 99 m³; biogas boiler ≈ 38 kWth; new digestate storage ≈ 260 m³.
Per sample please quote: dry matter (DM, % of fresh mass), volatile solids (VS, % of DM) and biochemical methane potential (BMP, NL CH₄ per kg VS) to VDI 4630, with the cellulose control result and the test duration. Please state price, turnaround time and sampling and shipping instructions.

Then enter it in: Feedstock step: DM, VS and BMP on each stream

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Highest installed cost at NPV = 0
not reachable
now €410K
Feedstock price headroom
€87.2/t
needs €87.2 per tonne less cost, or a gate fee, on every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-€650K
Median NPV
-€600K
NPV P90 (1 in 10 better)
-€550K
Chance that NPV > 0
< 1 %
Median payback
no payback

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: -560K)

  1. CAPEX +20 %-100K
  2. Maintenance +30 %-26K
  3. Feedstock potential −20 %-24K
  4. Feedstock transport +50 %-5.6K
  5. CH₄ −20 %-360
  6. Useful heat (economic) −50 %0
  7. CHP downtime +10 pp0
  8. Energy prices −20 %3.5K
NPV = 0 if CAPEX falls by
not reachable
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
not reachable
relative to the base case

Scenarios

Route: Boiler (heat only). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€3.4K
  • Incremental digestate value3.4K
OPEX / yr€17K
  • Disposal of pre-treatment rejects12K
  • Staff8.6K
  • Maintenance8.2K
  • Testing and monitoring5K
Operating margin (EBITDA)-€13K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr48.365.273.9
CAPEX€490K€410K€370K
OPEX / yr€28K€17K€13K
Revenue + savings / yr€2.2K€3.4K€4.2K
Operating margin (EBITDA)-€26K-€13K-€8.6K
Simple paybackno paybackno paybackno payback
Discounted paybackno paybackno paybackno payback
NPV-€770K-€560K-€470K
IRR———
DSCR (min)-0.7-0.4-0.3

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 50 % debt (no taxes).

Cumulative cash flow, €
-1M-750K-480K-210K58K03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) €480K-€8.4Kno payback-€580K-€840K … -€460K
Boiler (heat only) chosen€410K-€13Kno payback-€560K-€770K … -€470K
Biomethane €1.1M-€14Kno payback-€1.3M-€1.8M … -€960K
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 7 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 300Boiler (heat only)8€360K-€540K
× 0.75 450Boiler (heat only)13€380K-€550K
× 1 your input600Boiler (heat only)17€410K-€560K
× 1.5 900Boiler (heat only)25€460K-€570K
× 2 1,200CHP (power + heat)30€620K-€610K
× 3 1,800CHP (power + heat)50€760K-€650K

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

No support scheme is open for your project right now

The verdict rests on market prices only, so it does not change. Closed or unconfirmed schemes, if any, are listed below for reference.

Country overviewchecked 30 Oct 2026

Biomethane-only ALTUM loan with a capital rebate (≈ 50 % of principal, ≤ €4.2 m) is fully booked; no operating support for new small CHP.

Closed schemes (1)

Intake has ended. Shown for reference only.

ALTUM biometāna programma

Closed
Investment grant
Does not qualify
Raw biogas ≈ 7 Nm³/h is below the practical upgrading minimum (60 Nm³/h) — consider a cluster.
NPV change
-€320K
NPV with support
-€880K
Payback
no payback
IRR
—

Reference figures: intake is closed.

Conditions
  • not met: Raw biogas for upgrading from 60 Nm³/h (project ≈ 7 Nm³/h)
What the case uses
  • Route: Biomethane
  • Grant: 35 % of CAPEX
Scheme terms

Loan with ≈ 50 % principal write-off (≤ €4.2 m); funds reserved, waiting list only; completion by 31.03.2029.

Next step: Do not plan on it. Watch the operator's announcements for a successor scheme.

Source: ALTUM programme rules 25.11.2025; Cabinet Regulation No. 21 (07.01.2025) · checked 30 Oct 2026 · Data confidence: Medium

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

0/100

Of every 100 kWh of energy in the methane, 0 become a product that earns money or replaces a purchase.

100 % = 380 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Runs the plant

  • Digester heating30 MWh 8 %

Produced, not used

  • Heat with no buyer300 MWh 81 %

Losses

  • Conversion losses (engine, boiler)37 MWh 10 %
  • Methane leaks5.7 MWh 2 %

What this means for the project

  • 300 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income.
  • The plant buys 12 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Heat need
no heat userYour data
Methane leaks, base case
2 %Assumption

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 10 % of that month’s methane energy, in July 6 %.

January: methane energy 32 MWh · digester heating 3.1 MWh (10 %) · heat for a user 0 MWh

  • Methane energy of the month
  • Digester heating

How it works: from feedstock to products

  1. Feedstock600 t/yr
  2. Biogas65K Nm³/yr
  3. Useful heat0 MWh
  4. Heat without demand300 MWh
  5. Digestate520 t/yr
Heat produced (gross)
334 MWh
Digester heat demand
30 MWh
Useful heat (economic)
0 MWh of 304
Power: own use / sold
0 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
63 g CO₂e/MJ
open digestate storage
Fossil comparator
80 g CO₂e/MJ
Greenhouse-gas saving
21 %
RED minimum: 80 %
Avoided emissions
0 t CO₂e
  • Below the RED minimum: a gas-tight digestate store, off-gas combustion or more manure in the mix raise the saving.
  • Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
61/100
  • Energy equivalent ≈ 17 kWe (scale score 13/100)
  • Feedstock energy ≈ 628 kWh of methane per tonne (score 76/100)
  • Feedstock available 12 of 12 months
  • Most feedstock has low-confidence parameters
Energy fit
0/100
  • Own consumption absorbs 0 % of the electricity produced
  • Useful heat 0 MWh of 304 MWh available after digester needs
Location & logistics
100/100
  • No critical site constraints found from your answers
Technical feasibility
40/100
  • Energy equivalent below 25 kWe: hardly sensible technically
  • ABP pasteurisation adds complexity
  • Dry digestion — fewer suppliers
Economics
0/100
  • Operating margin ≤ 0 — no payback
  • Base-case NPV is negative
  • Minimum DSCR -0.43 — below the usual bank threshold of 1.2–1.3
Regulatory complexity
18/100 risk
  • Number and weight of permitting / regulatory steps: 9 points (more = harder)
Environmental risk
20/100 risk
  • Expected methane loss 1.5 % — within good practice if gas-tight and monitored
Overall project viability
38/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Location & logistics (100); weakest: Economics (0).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Municipal biowastedelivered 10 km60030637 %≈ 125 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Dry (high-solids) digestion, mesophilic

Garage (box) batch digesters with percolate recirculation, or horizontal plug-flow

Working volume
≈ 99 m³
Retention time
60 days
Loading rate
3.5 kg VS/(m³·d)
Digestate storage
≈ 260 m³
  • Average mix dry matter 30 % ≥ 22 %: wet digestion would need dilution, increasing volume and heat losses.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Single stage plus a gas-tight digestate store as post-digester: sufficient at this scale.
Alternatives
  • Wet digestion diluted with slurry/effluent — cheaper equipment, larger digester
  • Separate pasteurisation (70 °C / 1 h) ahead of a mesophilic digester instead of thermophilic operation

Climate: Latgale (Rēzekne), mean 7.3 °C, ≈ 3,910 heating degree-days. Closest climate analogues: Vilnius (LT) (Δ 0.7 °C), Rzeszów (PL) (Δ 1.8 °C), Salzburg (AT) (Δ 1.9 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan5132300
Feb4629300
Mar5132300
Apr4930300
May5132200
Jun4930200
Jul5132200
Aug5132200
Sept4930200
Oct5132300
Nov4930300
Dec5132300
Σ6003713000
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester32K
New covered storage13K
New open storage6.5K
Feedstock reception and preparation150K
Pasteurisation (70 °C / 1 h)60K
Gas handling and cleaning25K
Boiler (heat only)3.4K
Electrical systems and controls17K
Pipework12K
Civil works17K
Grid connection8.2K
Engineering and permits27K
Contingency37K
Total410K
OPEX / yr (EUR)
Staff8.6K
Maintenance8.2K
Insurance2K
Testing and monitoring5K
Feedstock purchase, net of gate fees-23K
Feedstock transport1.1K
Disposal of pre-treatment rejects12K
Digestate handling1.1K
Purchased electricity1.7K
Total17K
Revenue + savings / yr (EUR)
Incremental digestate value3.4K
Total3.4K

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: asset · 519 t/yr · nitrogen ≈ 3,420 kg/yr · land needed ≈ 20 ha (available 30 ha).

Incremental fertiliser value €3.4K/yr, handling €1.1K/yr, net €2.3K/yr.

  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 1.5 % of methane produced (range 0.5 % – 3 %) ≈ 11 t CO₂e/yr; fossil emissions displaced ≈ 0 t CO₂/yr.

  • Methane losses could cancel the climate benefit. Do not claim emission reductions without measurements.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Building permit and environmental permit; EIA screening (Directive 2011/92/EU as transposed)
    New installation · effort: medium · to verify
  • Nitrates Directive (91/676/EEC): 170 kg N/ha from organic manures in vulnerable zones; closed spreading periods
    Digestate is spread on land · effort: medium · confirmed
  • ATEX hazardous-area zoning (Directives 2014/34/EU, 1999/92/EC)
    Methane in the gas phase · effort: medium · confirmed
  • Animal by-products approval: pasteurisation 70 °C / 1 h (Cat. 3) or pressure sterilisation (Cat. 2), veterinary registration
    Slaughter / dairy / food residues in the feed · effort: high · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Biological hazards: pathogens in animal by-products and food waste high
    Condition: Animal by-products / food waste in the mix
    • Pasteurisation 70 °C / 1 h (Cat. 3) with time–temperature control
    • Separate dirty and clean zones, vehicle disinfection
    • Veterinary supervision and traceability
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (166)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: Biomethane-only ALTUM loan with a capital rebate (≈ 50 % of principal, ≤ €4.2 m) is fully booked; no operating support for new small CHP.
  • Poultry-manure biomethane (Balticovo) proves the industrial route.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

boiler: local CAPEX factor
0.574 … 1.066 —
NPV low…high: -€710K … -€400K
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.059 … 0.089 —
NPV low…high: -€570K … -€540K
Mineral potassium price
0.713 … 0.8099 EUR/kg K₂O
NPV low…high: -€560K … -€560K
Mineral nitrogen price
1.045 … 1.818 EUR/kg N
NPV low…high: -€560K … -€550K
Mineral phosphorus price
1.419 … 1.847 EUR/kg P₂O₅
NPV low…high: -€560K … -€560K
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.6925 EUR/Nm³ · CALCULATED_VALUE · LOW
CALCULATION: TTF 46.49 €/MWh HHV × 1.11 HHV/LHV + 20 €/MWh LHV green-gas premium (engineering assumption, no official GO price); World Bank Pink Sheet (2026-10-02), Natural gas Europe (TTF), mean Q4 2025 – Q3 2026 15.25 $/mmbtu GCV ÷ 0.2931 MWh/mmbtu at 1.1193 USD/EUR; × 9.6709 kWh LHV/Nm³. No guaranteed offtake or certificate eligibility.
2025-10 / 2026-09 · checked 2026-11-11 · Grid-injected biomethane, HHV prices converted to LHV; without feed-in tariffs, quotas or tax relief
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
boiler: local CAPEX factor: 0.82 — · CALCULATED_VALUE · MEDIUM
0.72 traded equipment + 0.28 × local/German labour cost (11.4/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.054 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.5 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 7 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 5.01 EUR/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 2.11 EUR/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.069 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 1.48 % (A3; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.09772 EUR/kWh · MARKET_DATA · HIGH
ENTSO-E day-ahead (via Energy-Charts), zone LV, average 97.7 €/MWh, 2025-10-01 – 2026-10-01
2025-10-01 / 2026-10-01 · checked 2026-10-31 · Wholesale bidding zone LV; not a guaranteed export PPA
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 1 EUR/EUR · MARKET_DATA · HIGH
Euro
CONSTANT: EUR reporting currency; no currency conversion
Value of useful heat (displaced gas / boiler efficiency): 0.06845 EUR/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 61.605000000000004 €/MWh LHV ÷ 0.9
2026-S1 · checked 2026-10-31 · GJ10000-99999; reference band, customer gas use unknown
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 16.3 EUR/h · MARKET_DATA · HIGH
Eurostat lc_lci_lev: hourly labour cost (wages + employer costs), industry, construction & services, 2025
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.094 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 0.83 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.14 EUR/kWh · USER_INPUT · MEDIUM
USER_INPUT 0.14 EUR/kWh / FX 1; Euro. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
municipal_biowaste: dry matter: 30 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified