Sample report · Italy

Municipality / waste operator · Municipal biowaste: 40,000 t/yr

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

An operator in Lazio treats the organic fraction of municipal waste (FORSU) under a long municipal contract. Italian FORSU plants earn mainly from gate fees, because treatment capacity in central and southern Italy is short.

Operating assumptions

  • Municipal biowaste: 40,000 t/yr · DM: 28 % · 12 months · Other / don't know · Delivered from another site: 30 km · Purchase price / gate fee: -110 EUR/t
  • Electricity: 1,800,000 kWh/yr · Electricity price on your bill (if known): 0.22 EUR/kWh
  • No heat needed
  • Land available for spreading digestate: 1,200 ha · Distance to the gas grid (for biomethane): 1 km
  • Grid connection? Yes

What to verify

Confirm the contract term and gate-fee indexation, impurity levels, the reject outlet and its price, and the composting requirement for the digestate.

Strong candidate

Worth detailed work: the project holds up even under conservative assumptions.

  • Simple payback ≈ 2.1 yrs (base) and ≈ 4.1 yrs in the conservative case; base NPV €32M; minimum DSCR 5.59.

Largest benefit — “surplus electricity sold”: ≈ 64 % of all revenue and savings.

What would change the verdict
  • → Confirm with a laboratory feedstock analysis (BMP) and real energy invoices.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

Robust: profitable even in the conservative case (lower gas yield, higher CAPEX, lower prices). The next step is worth paying for.

NPV: conservative €14M · base €32M · optimistic €38M

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in > 99 % of cases.

Biggest drivers of the result (stress tests):
  1. Secure the feedstock supply in writing · Feedstock potential −20 % (-€8.3M)
  2. Get an offer for exported power (PPA or tariff) · Energy prices −20 % (-€2.3M)
  3. Get supplier quotes for the plant · CAPEX +20 % (-€2.1M)

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

To reach a bankable estimate (±15 %)
  1. Laboratory methane-potential (BMP) test of 2–3 feedstock samples — ≈ €300–800 each
  2. 2–3 supplier quotes for the plant
  3. Grid or gas-network connection conditions from the operator
  4. Letters of intent for feedstock supply and for heat, power or biomethane offtake
  5. Then a feasibility study with permits and financing (±15 %)
From screening to construction

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€7.6M – €10M
Payback
1.7 yr – 4.1 yr
base: 2.1 yr · no subsidies
NPV (base)
€32M
range: €14M … €38M
Chosen route
CHP (power + heat)
Confidence: Medium

Feedstock and energy

Feedstock potential
40,000 t/yr
energy ≈ 586 kWh CH₄/t
Biogas
3M – 4.6M Nm³/yr
≈ 507 Nm³/h (base)
Net energy
6,500 – 9,500 MWh/yr
useful heat: 0 MWh · ≈ 85 % of your electricity use
Candidate capacity
1,300 kWe
large (1–5 MW)

How far you can rely on these numbers

Medium · 63/100
  • Backed by your data and our sources63
  • You can still add+27
  • Needs a feasibility study (lab, quotes, contracts)10

63/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainLaboratory DM, VS and BMP results for every feedstock streamLarge effectSend a sample to a laboratory: dry matter and VS take a few days, BMP several weeks+27

With all of it: up to 90/100

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Parameters for "municipal biowaste (food + garden)" have low confidence — a laboratory analysis (BMP) is needed.
  • Animal by-products (Cat. 3) → pasteurisation and veterinary approval required.
  • In this configuration the digestate is a cost rather than an asset.
  • CHP performance uses a 50 Hz biogas full-load catalogue reference (03/2025), interpolated between ratings; part-load and ambient derating require supplier confirmation.
Compared with the market
Our estimate: ≈ 6,800 €/kW at ≈ 1,250 kW
  • 2,800–7,000 EUR/kW — Agricultural plants, Poland · within rangePolish trade press 2023–2024 (PLN 7–20 m for 500 kW; PLN 12–16 m for 1 MW); IOŚ-PIB: ≈ PLN 30 m for 1 MW · 2023–2024 · Trade press
  • 3,000–4,500 EUR/kW — Biogas plants, Ukraine · above rangeSupplier estimate (Zorg Biogas, ≈ €3,500/kW at 1 MW — primary source not found); Ecodevelop 333 kW ≈ €1.5 m (older project) · ≈2013–2020 · Supplier estimate

Market figures are mostly trade press and supplier estimates, not audited budgets. Real prices come from 3–5 supplier quotes.

Country conditions
  • Large agricultural biogas fleet in the Po valley; the strategic question is CHP-to-biomethane conversion.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 6,800 MWh a year, valued at ≈ €0.0725 per kWh.
Strong candidate€36M+€4.6Mheat ≥ €0.00381 per kWh
Order of action
  1. 1Find a heat buyer for ≈ 6,800 MWh a year (heat ≥ €0.00381 per kWh).
  2. 2Ask 3–5 suppliers for quotes: the project breaks even up to an investment of €34M. →

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Fix feedstock prices and gate fees in contracts€20M … €43M—
Secure the feedstock supply in writing€19M … €32M—
Verify the market price€27M … €34M—
Get supplier quotes for the plant€28M … €35M—
Lab test of the methane yield (BMP)€29M … €32M—
Check how your bill splits energy and capacity charges€31M … €32M—
How to check: Fix feedstock prices and gate fees in contracts
  1. For every purchased stream and every gate fee, note today's price and its range over the last three years.
  2. Fix prices or gate fees with indexation for the loan period, and check that the plan still pays with prices 25 % worse.
Request to send
Request for a feedstock supply agreement
Site: Italy. A biogas plant would take:
- municipal biowaste (food + garden): 40,000 t/year, DM ≈ 28.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Secure the feedstock supply in writing
  1. List every stream you do not produce yourself: supplier, tonnes per month, season and contract term.
  2. Get letters of intent or contracts for at least the loan period, and size the plant on the tonnage that is signed, not promised.
Request to send
Request for a feedstock supply agreement
Site: Italy. A biogas plant would take:
- municipal biowaste (food + garden): 40,000 t/year, DM ≈ 28.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Italy.
Feedstock (screening values, to be confirmed):
- municipal biowaste (food + garden): 40,000 t/year, DM ≈ 28.0 %
Design basis from the screening: raw biogas ≈ 510 Nm³/h at ≈ 58 % CH₄; digester working volume ≈ 6,100 m³; combined heat and power ≈ 1,300 kWe; new digestate storage ≈ 17,000 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Lab test of the methane yield (BMP)
  1. Take 3–5 subsamples of each stream over 2–4 weeks, mix them, keep them at 4 °C and deliver within 24 h.
  2. Order dry matter (DM), volatile solids (VS) and a methane potential test (BMP, VDI 4630) with the cellulose control reported.
  3. A valid test reports cellulose at 340–395 NL CH₄/kg VS; ask for a repeat otherwise.
Request to send
Request for quotation: biogas potential analysis
Site: Italy.
Feedstock (screening values, to be confirmed):
- municipal biowaste (food + garden): 40,000 t/year, DM ≈ 28.0 %
Design basis from the screening: raw biogas ≈ 510 Nm³/h at ≈ 58 % CH₄; digester working volume ≈ 6,100 m³; combined heat and power ≈ 1,300 kWe; new digestate storage ≈ 17,000 m³.
Per sample please quote: dry matter (DM, % of fresh mass), volatile solids (VS, % of DM) and biochemical methane potential (BMP, NL CH₄ per kg VS) to VDI 4630, with the cellulose control result and the test duration. Please state price, turnaround time and sampling and shipping instructions.

Then enter it in: Feedstock step: DM, VS and BMP on each stream

How to check: Check how your bill splits energy and capacity charges
  1. Take the last 12 electricity invoices.
  2. Split each into the energy part (per kWh) and capacity, network and fixed charges; own generation saves mainly the energy part.

Then enter it in: Energy step: electricity price per kWh (energy part, excl. VAT)

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Electricity value at NPV = 0
positive even if the product earns nothing
now €0.128/kWh
Highest installed cost at NPV = 0
€34M
now €8.4M
Feedstock price headroom
€76.7/t
can pay up to €76.7 per tonne more for every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
€24M
Median NPV
€28M
NPV P90 (1 in 10 better)
€30M
Chance that NPV > 0
> 99 %
Median payback
2.4 yr

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: 32M)

  1. Feedstock potential −20 %-8.3M
  2. Energy prices −20 %-2.3M
  3. CAPEX +20 %-2.1M
  4. CH₄ −20 %-1.9M
  5. CHP downtime +10 pp-1.1M
  6. Feedstock transport +50 %-1M
  7. Maintenance +30 %-780K
  8. Useful heat (economic) −50 %0
NPV = 0 if CAPEX falls by
already positive
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
already positive
relative to the base case

Scenarios

Route: CHP (power + heat). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€1.4M
  • Electricity sales870K
  • Electricity self-consumption savings290K
  • Incremental digestate value200K
OPEX / yr-€2.7M
  • Disposal of pre-treatment rejects800K
  • Feedstock transport190K
  • Maintenance140K
  • CHP service and overhaul reserve110K
Operating margin (EBITDA)€4M
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr3,004.94,055.24,595.9
CAPEX€10M€8.4M€7.6M
OPEX / yr-€1.6M-€2.7M-€3M
Revenue + savings / yr€870K€1.4M€1.6M
Operating margin (EBITDA)€2.5M€4M€4.6M
Simple payback4.1 yr2.1 yr1.7 yr
Discounted payback5.3 yr2.7 yr2.2 yr
NPV€14M€32M€38M
IRR23.8 %45.2 %55.6 %
DSCR (min)2.95.67

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).

Cumulative cash flow, €
-15M7.9M31M54M77M03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) chosen€8.4M€4M2.1 yr€32M€14M … €38M
Boiler (heat only) €6.6M€2.9M2.3 yr€22M€8.8M … €26M
Biomethane €9.3M€4M2.3 yr€30M€10M … €42M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 473 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 20,000CHP (power + heat)620€4.7M€16M
× 0.75 30,000CHP (power + heat)930€6.6M€24M
× 1 your input40,000CHP (power + heat)1,250€8.4M€32M
× 1.5 60,000CHP (power + heat)1,890€12M€46M
× 2 80,000CHP (power + heat)2,510€16M€60M
× 3 120,000CHP (power + heat)3,760€23M€87M

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

Schemes are running, but your project does not meet their conditions

Main obstacle — DM FER 2 – biogas ≤ 300 kW: Plant ≈ 1250 kWe exceeds the 300 kW limit. Details ↓

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Country overviewchecked 30 Oct 2026

Small farm biogas ≤ 300 kW: FER 2 tariff ≈ 226 €/MWh via annual rounds (next expected 2027). The PNRR biomethane incentive closed on 30.06.2026; a new decree is pending.

Running, awarded by competition (1)

Support goes to the winners of a round or auction. The case assumes an award at the stated value.

DM FER 2 – biogas ≤ 300 kW

Competitive
Electricity tariff
Does not qualify
Plant ≈ 1250 kWe exceeds the 300 kW limit.

Not calculated: the project does not meet the conditions.

Conditions
  • not met: Electrical capacity up to 300 kW (project ≈ 1,250 kW)
  • met: CHP of a practical size, from 25 kW (project ≈ 1,250 kW)
Not checked by the model — confirm with the operator:
  • no data: ≥ 80 % by-products and farm residues (GSE rules)
What the case uses
  • Route: CHP (power + heat)
  • Tariff: €0.226/kWh
Scheme terms

233 €/MWh −3 % (2026), 20 years; all-inclusive tariff only ≤ 200 kW, 200–300 kW premium only; ≥ 80 % by-products; works start after the ranking.

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Source: DM MASE 19.06.2024 (FER 2); GSE Regole Operative FER 2 §3.3, §5 · checked 30 Oct 2026 · Data confidence: Medium

Closed schemes (1)

Intake has ended. Shown for reference only.

DM 15/9/2022 + PNRR (40 % grant)

Closed
Biomethane supportInvestment grant
For reference
NPV change
+€10M
NPV with support
€42M
Payback
1.2 yr
IRR
75.5 %

Reference figures: intake is closed.

Conditions
  • met: Raw biogas for upgrading from 60 Nm³/h (project ≈ 473 Nm³/h)
What the case uses
  • Route: Biomethane
  • Biomethane price: €1.05/Nm³
  • Grant: 40 % of CAPEX
Scheme terms

Window closed 30.06.2026; shown for reference. A CfD-type successor decree is being drafted, no tariff yet.

Next step: Do not plan on it. Watch the operator's announcements for a successor scheme.

Source: GSE, DM 15/9/2022; Decree-Law 19/2026 · checked 30 Oct 2026 · Data confidence: Medium

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

38/100

Of every 100 kWh of energy in the methane, 38 become a product that earns money or replaces a purchase.

100 % = 23,000 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Electricity sold to the grid7,500 MWh 32 %
  • Electricity used on site1,500 MWh 7 %

Runs the plant

  • Plant’s own electricity740 MWh 3 %
  • Digester heating1,100 MWh 5 %

Produced, not used

  • Heat with no buyer8,500 MWh 36 %

Losses

  • Conversion losses (engine, boiler)3,300 MWh 14 %
  • Gas sent to the flare360 MWh 2 %
  • Methane leaks350 MWh 2 %

What this means for the project

  • 8,500 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Engine efficiency: electricity / heat
43 % / 46 %Assumption
Heat need
no heat userYour data
Site electricity use
1,800 MWhYour data
Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
6,500 – 9,500 MWhCalculated

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 6 % of that month’s methane energy, in July 4 %.

January: methane energy 2,000 MWh · digester heating 110 MWh (6 %) · heat for a user 0 MWh

  • Methane energy of the month
  • Digester heating

How it works: from feedstock to products

  1. Feedstock40,000 t/yr
  2. Biogas4.1M Nm³/yr
  3. Electricity9,000 MWh
  4. Useful heat0 MWh
  5. Heat without demand8,500 MWh
  6. Digestate35,000 t/yr
Heat produced (gross)
9,636 MWh
Digester heat demand
1,097 MWh
Useful heat (economic)
0 MWh of 8,538
Power: own use / sold
1,530 / 7,494 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
102 g CO₂e/MJ
open digestate storage
Fossil comparator
183 g CO₂e/MJ
Greenhouse-gas saving
44 %
RED minimum: 80 %
Avoided emissions
2,616 t CO₂e
  • Below the RED minimum: a gas-tight digestate store, off-gas combustion or more manure in the mix raise the saving.
  • RED sustainability criteria apply (rated input ≥ 2 MW).

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
95/100
  • Energy equivalent ≈ 1250 kWe (scale score 100/100)
  • Feedstock energy ≈ 586 kWh of methane per tonne (score 74/100)
  • Feedstock available 12 of 12 months
  • Most feedstock has low-confidence parameters
Energy fit
34/100
  • Own consumption absorbs 17 % of the electricity produced
  • Useful heat 0 MWh of 8538 MWh available after digester needs
Location & logistics
75/100
  • Not enough land for the digestate
Technical feasibility
85/100
  • ABP pasteurisation adds complexity
  • Dry digestion — fewer suppliers
Economics
100/100
  • Base-case simple payback ≈ 2.1 years
  • NPV positive even in the conservative case
Regulatory complexity
50/100 risk
  • Number and weight of permitting / regulatory steps: 16 points (more = harder)
Environmental risk
39/100 risk
  • Expected methane loss 2.5 % (good practice ≤ 2 %)
  • Surplus digestate: risk of nitrogen over-application
Overall project viability
78/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Economics (100); weakest: Energy fit (34).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Municipal biowastedelivered 30 km40,0002858.817 %≈ 107 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Dry (high-solids) digestion, mesophilic

Garage (box) batch digesters with percolate recirculation, or horizontal plug-flow

Working volume
≈ 6,100 m³
Retention time
56 days
Loading rate
3.5 kg VS/(m³·d)
Digestate storage
≈ 17,000 m³
  • Average mix dry matter 28 % ≥ 22 %: wet digestion would need dilution, increasing volume and heat losses.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Two-stage layout (main + post-digester) for stability with fats or larger flows.
Alternatives
  • Wet digestion diluted with slurry/effluent — cheaper equipment, larger digester
  • Separate pasteurisation (70 °C / 1 h) ahead of a mesophilic digester instead of thermophilic operation

Climate: Lazio (Latina), mean 17.4 °C, ≈ 1,107 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 7.4 °C), Prague (CZ) (Δ 7.7 °C), Copenhagen (DK) (Δ 8 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan3,3951,9601100766
Feb3,0941,786970698
Mar3,3951,9601030766
Apr3,2851,897930741
May3,3951,960880766
Jun3,2851,897780741
Jul3,3951,960770766
Aug3,3951,960770766
Sept3,2851,897800741
Oct3,3951,960890766
Nov3,2851,897950741
Dec3,3951,9601070766
Σ40,00023,0981,09709,024
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester990K
New covered storage990K
New open storage470K
Feedstock reception and preparation1.8M
Pasteurisation (70 °C / 1 h)250K
Gas handling and cleaning84K
CHP (power + heat)1.5M
Backup boiler8K
Electrical systems and controls360K
Pipework240K
Civil works360K
Grid connection87K
Engineering and permits570K
Contingency770K
Total8.4M
OPEX / yr (EUR)
Staff86K
CHP service and overhaul reserve110K
Maintenance140K
Insurance42K
Testing and monitoring5K
Feedstock purchase, net of gate fees-4.2M
Feedstock transport190K
Disposal of pre-treatment rejects800K
Digestate handling110K
Total-2.7M
Revenue + savings / yr (EUR)
Electricity self-consumption savings290K
Electricity sales870K
Incremental digestate value200K
Total1.4M

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: liability / cost · 34,946 t/yr · nitrogen ≈ 212,800 kg/yr · land needed ≈ 1,252 ha (available 1,200 ha).

Incremental fertiliser value €200K/yr, handling €110K/yr, net €94K/yr.

  • Not enough land: ≈ 1252 ha needed at 170 kg N/ha. Surplus digestate is a cost (agreements with neighbours, separation, pelletising).
  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 2.5 % of methane produced (range 1.6 % – 4 %) ≈ 1,138 t CO₂e/yr; fossil emissions displaced ≈ 2,572 t CO₂/yr. Losses vs benefit: 44 %.

  • Expected loss 2.5 % is above good practice (2 %): budget for monitoring.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: medium. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Building permit and environmental permit; EIA screening (Directive 2011/92/EU as transposed)
    New installation · effort: medium · to verify
  • Industrial Emissions Directive (2010/75/EU) permit — anaerobic digestion of waste above ~100 t/day
    Throughput above the IED threshold · effort: high · to verify
  • Nitrates Directive (91/676/EEC): 170 kg N/ha from organic manures in vulnerable zones; closed spreading periods
    Digestate is spread on land · effort: medium · confirmed
  • ATEX hazardous-area zoning (Directives 2014/34/EU, 1999/92/EC)
    Methane in the gas phase · effort: medium · confirmed
  • Medium Combustion Plant Directive (2015/2193): registration and emission limits for CHP ≥ 1 MW thermal input
    CHP above 1 MWth input · effort: medium · to verify
  • Grid-connection agreement with the DSO and generator registration
    Surplus electricity is exported · effort: medium · to verify
  • Animal by-products approval: pasteurisation 70 °C / 1 h (Cat. 3) or pressure sterilisation (Cat. 2), veterinary registration
    Slaughter / dairy / food residues in the feed · effort: high · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Biological hazards: pathogens in animal by-products and food waste high
    Condition: Animal by-products / food waste in the mix
    • Pasteurisation 70 °C / 1 h (Cat. 3) with time–temperature control
    • Separate dirty and clean zones, vehicle disinfection
    • Veterinary supervision and traceability
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (164)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: Small farm biogas ≤ 300 kW: FER 2 tariff ≈ 226 €/MWh via annual rounds (next expected 2027). The PNRR biomethane incentive closed on 30.06.2026; a new decree is pending.
  • Large agricultural biogas fleet in the Po valley; the strategic question is CHP-to-biomethane conversion.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

chp: local CAPEX factor
0.644 … 1.196 —
NPV low…high: €28M … €35M
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.064 … 0.094 —
NPV low…high: €27M … €34M
Mineral potassium price
0.713 … 0.8099 EUR/kg K₂O
NPV low…high: €32M … €32M
Mineral nitrogen price
1.045 … 1.818 EUR/kg N
NPV low…high: €31M … €32M
Mineral phosphorus price
1.419 … 1.847 EUR/kg P₂O₅
NPV low…high: €31M … €32M
Avoidable share of an unsplit customer electricity bill
0.7 … 1 —
NPV low…high: €31M … €32M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.6925 EUR/Nm³ · CALCULATED_VALUE · LOW
CALCULATION: TTF 46.49 €/MWh HHV × 1.11 HHV/LHV + 20 €/MWh LHV green-gas premium (engineering assumption, no official GO price); World Bank Pink Sheet (2026-10-02), Natural gas Europe (TTF), mean Q4 2025 – Q3 2026 15.25 $/mmbtu GCV ÷ 0.2931 MWh/mmbtu at 1.1193 USD/EUR; × 9.6709 kWh LHV/Nm³. No guaranteed offtake or certificate eligibility.
2025-10 / 2026-09 · checked 2026-11-11 · Grid-injected biomethane, HHV prices converted to LHV; without feed-in tariffs, quotas or tax relief
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
chp: local CAPEX factor: 0.92 — · CALCULATED_VALUE · MEDIUM
0.72 traded equipment + 0.28 × local/German labour cost (22.4/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.059 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 7.43 EUR/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 2.99 EUR/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.074 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 2.36 % (Baa2; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.1365 EUR/kWh · MARKET_DATA · MEDIUM
ENTSO-E day-ahead (via Energy-Charts), zone IT-North, average 138.3 €/MWh, 2025-10-01 – 2026-10-01; × 0.987 for IT.07 (ENTSO-E day-ahead by Italian market zone (via Energy-Charts), mean Nov 2025 – Oct 2026 (NORD 148.6, CNOR 149.1, CSUD 146.7, SUD 143.2, CALA 142.5, SICI 148.6, SARD 141.3 €/MWh) ÷ NORD)
2025-10-01 / 2026-10-01 · checked 2026-10-31 · Wholesale bidding zone IT-North; not a guaranteed export PPA
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 1 EUR/EUR · MARKET_DATA · HIGH
Euro
CONSTANT: EUR reporting currency; no currency conversion
Value of useful heat (displaced gas / boiler efficiency): 0.07252 EUR/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 65.268 €/MWh LHV ÷ 0.9
2026-S1 · checked 2026-10-31 · GJ10000-99999; reference band, customer gas use unknown
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 32 EUR/h · MARKET_DATA · HIGH
Eurostat lc_lci_lev: hourly labour cost (wages + employer costs), industry, construction & services, 2025
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.127 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 1.05 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.22 EUR/kWh · USER_INPUT · MEDIUM
USER_INPUT 0.22 EUR/kWh / FX 1; Euro. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
municipal_biowaste: dry matter: 28 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified