Sample report · India

Biogas cooperative · dung and press mud

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

A Punjab cooperative aggregates cattle dung from nearby holdings and buys seasonal sugar press mud. Collection and offtake arrangements matter as much as the reactor size.

Operating assumptions

  • Cattle solid manure (bedded): 15,000 t/yr · DM: 16 % · 12 months · Spread on our own fields · Delivered from another site: 5 km · Purchase price / gate fee: 200 INR/t
  • Press mud / filter cake: 8,000 t/yr · DM: 25 % · 5 months · Season starts: November · Spread on our own fields · Delivered from another site: 18 km · Purchase price / gate fee: 600 INR/t
  • Electricity: 350,000 kWh/yr · Electricity price on your bill (if known): 7.5 INR/kWh
  • No heat needed
  • Land available for spreading digestate: 400 ha · Distance to the gas grid (for biomethane): 8 km
  • Grid connection? Yes

What to verify

Secure weighed collection contracts, seasonal feedstock prices and digestate acceptance. Confirm gas quality, compression, transport and a binding buyer agreement separately before relying on CBG income.

Weak economics

Under current conditions the investment won't pay back in a reasonable time. Below is what could change that.

  • Base-case operating margin does not cover costs.
  • Even the optimistic case has a negative NPV (-US$1.9M).

Operating margin (≈ -US$38K/year) is too small for an investment of ≈ US$2.8M.

What would change the verdict
  • → NPV = 0 with ≈ 91 % lower CAPEX (or an equivalent grant).
  • → NPV = 0 with ≈ 162 % higher energy prices.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

A clear no under these conditions: even the optimistic case does not pay back. Don't spend money on a feasibility study unless one of the changes above happens.

NPV: conservative -US$5.2M · base -US$3.3M · optimistic -US$1.9M

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in < 1 % of cases.

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
US$2.5M – US$3.4M
≈ ₹260M (base)
Payback
> 25 yr – no payback
base: no payback · no subsidies
NPV (base)
-US$3.3M
range: -US$5.2M … -US$1.9M
Chosen route
Biomethane
Confidence: Medium

1 EUR = 1.1193 USD · ECB · 2026-11-09

Feedstock and energy

Feedstock potential
23,000 t/yr
energy ≈ 303 kWh CH₄/t
Biogas
970K – 1.3M Nm³/yr
≈ 155 Nm³/h (base)
Net energy
480K – 670K Nm³/yr
biomethane / year
Candidate capacity
310 kWe
medium (0.25–1 MW)

How far you can rely on these numbers

Medium · 68/100
  • Backed by your data and our sources68
  • You can still add+22
  • Needs a feasibility study (lab, quotes, contracts)10

68/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainLaboratory DM, VS and BMP results for every feedstock streamMedium effectSend a sample to a laboratory: dry matter and VS take a few days, BMP several weeksValues equal to the typical ones shown in the form do not count as a laboratory result.+8
  • Route-specific CAPEX lacks independent local validation — obtain comparable supplier quotations+8
  • At least one price affecting this route relies on an unconfirmed market proxy or uncontracted offtake — confirm the applicable tariff or buyer contract+6

With all of it: up to 90/100

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Seasonal stream (5 months): equipment sits idle for the rest of the year.
  • Manure delivered from another site has no store at the plant, so new gas-tight digestate storage (≈ 5,359 m³) is costed. If the supplying farm's existing store can be covered and used, enter its volume as an existing store that could be covered.
  • Grid injection of biomethane is not yet an established pathway in this country: plan for local use (bio-CNG/LNG) or a pioneer connection.
  • Market data require review (econ.electricity_spot_eur_kwh). Observation dates and validity are shown in the evidence; these are not verified current customer quotations.
Country conditions
  • Dung collection from many small holdings is the main logistics challenge; urea is subsidised, so digestate N has low cash value.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Possible with conditions”
  • The base-case NPV is negative (-US$3.3M).
  • Payback in the base case is no payback; it needs to be 10 yr or less.
ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 1,700 MWh a year, valued at ≈ ₹4.5 per kWh.
Weak economics
Boiler (heat only)
-US$3M+US$280Kheat ≥ ₹16.4 per kWh
Order of action
  1. 1Find a heat buyer for ≈ 1,700 MWh a year (heat ≥ ₹16.4 per kWh).
  2. 2Ask 3–5 suppliers for quotes: the project breaks even up to an investment of US$240K. →

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Get supplier quotes for the plant-US$4.4M … -US$2.2M—
Get a biomethane offtake offer-US$3.8M … -US$2.6M—
Fix feedstock prices and gate fees in contracts-US$3.5M … -US$3.1M—
Secure the feedstock supply in writing-US$3.6M … -US$3.3M—
Verify the market price-US$3.4M … -US$3.3M—
Check the fertiliser value of the digestate-US$3.4M … -US$3.3M—
How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: India.
Feedstock (screening values, to be confirmed):
- cattle solid manure with bedding: 15,000 t/year, DM ≈ 16.0 %
- sugar press mud / filter cake: 8,000 t/year, DM ≈ 25.0 %
Design basis from the screening: raw biogas ≈ 230 Nm³/h at ≈ 57 % CH₄; digester working volume ≈ 4,400 m³; membrane upgrading ≈ 73 Nm³/h biomethane (≈ 230 Nm³/h raw gas); new digestate storage ≈ 5,400 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Get a biomethane offtake offer
  1. Ask two or three biomethane traders or gas suppliers for an offer without state support.
  2. Ask the gas grid operator for the injection point, pressure and connection cost.
Request to send
Request for a biomethane offtake offer
Site: India. Expected output ≈ 73 Nm³/h, ≈ 6,900 MWh (HHV) a year; ≈ 57 % of organic matter from manure (relevant for certification). Please offer a price per MWh (HHV) without state support, indexation, term, and say whether guarantees of origin or sustainability certificates are included or paid extra.

Then enter it in: Energy step: biomethane price offered by a buyer

How to check: Fix feedstock prices and gate fees in contracts
  1. For every purchased stream and every gate fee, note today's price and its range over the last three years.
  2. Fix prices or gate fees with indexation for the loan period, and check that the plan still pays with prices 25 % worse.
Request to send
Request for a feedstock supply agreement
Site: India. A biogas plant would take:
- cattle solid manure with bedding: 15,000 t/year, DM ≈ 16.0 %
- sugar press mud / filter cake: 8,000 t/year, DM ≈ 25.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Secure the feedstock supply in writing
  1. List every stream you do not produce yourself: supplier, tonnes per month, season and contract term.
  2. Get letters of intent or contracts for at least the loan period, and size the plant on the tonnage that is signed, not promised.
Request to send
Request for a feedstock supply agreement
Site: India. A biogas plant would take:
- cattle solid manure with bedding: 15,000 t/year, DM ≈ 16.0 %
- sugar press mud / filter cake: 8,000 t/year, DM ≈ 25.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Biomethane price at NPV = 0
US$0.957/Nm³US$89.1/MWh HHV
now US$0.417/Nm³ · US$38.9/MWh HHV
Highest installed cost at NPV = 0
US$240K
now US$2.8M
Feedstock price headroom
US$14.3/t
needs US$14.3 per tonne less cost, or a gate fee, on every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-US$4M
Median NPV
-US$3.5M
NPV P90 (1 in 10 better)
-US$3.1M
Chance that NPV > 0
< 1 %
Median payback
no payback

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, USD (base: -3.3M)

  1. CAPEX +20 %-730K
  2. Energy prices −20 %-410K
  3. CH₄ −20 %-380K
  4. Maintenance +30 %-210K
  5. Feedstock transport +50 %-200K
  6. Feedstock potential −20 %-150K
  7. Useful heat (economic) −50 %0
  8. CHP downtime +10 pp0
NPV = 0 if CAPEX falls by
91 %
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
162 %
relative to the base case

Scenarios

Route: Biomethane. Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yrUS$290K
  • Biomethane270K
  • Incremental digestate value22K
OPEX / yrUS$330K
  • Feedstock purchase, net of gate fees83K
  • Purchased electricity52K
  • Maintenance42K
  • Feedstock transport40K
Operating margin (EBITDA)-US$38K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr9731,2371,335.9
CAPEXUS$3.4MUS$2.8MUS$2.5M
OPEX / yrUS$350KUS$330KUS$310K
Revenue + savings / yrUS$170KUS$290KUS$390K
Operating margin (EBITDA)-US$170K-US$38KUS$78K
Simple paybackno paybackno payback> 25 yr
Discounted paybackno paybackno paybackno payback
NPV-US$5.2M-US$3.3M-US$1.9M
IRR——-8.8 %
DSCR (min)-0.7-0.20.3

Pre-tax, nominal USD, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 50 % debt (no taxes).

Cumulative cash flow, USD
-7M-5.1M-3.3M-1.4M400K03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) US$3.1M-US$130Kno payback-US$4.5M-US$5.6M … -US$3.8M
Boiler (heat only) US$2.1M-US$190Kno payback-US$4M-US$4.7M … -US$3.6M
Biomethane chosenUS$2.8M-US$38Kno payback-US$3.3M-US$5.2M … -US$1.9M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 139 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 12,000Boiler (heat only)155US$1.2M-US$2.2M
× 0.75 17,000Biomethane232US$2.3M-US$2.8M
× 1 your input23,000Biomethane309US$2.8M-US$3.3M
× 1.5 35,000Biomethane464US$3.7M-US$4.3M
× 2 46,000Biomethane618US$4.5M-US$5.3M
× 3 69,000Biomethane928US$6M-US$7.3M

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

There is a scheme your project can apply for

It improves the NPV, but the project still does not pay back its investment.

Best option: GOBARdhan administered CBG price Details ↓

NPV change
+US$2.5M
NPV with support
-US$830K
Payback
12.6 yr
IRR
2.8 %

Next step: Confirm the current rate and conditions with the scheme operator (source below), then prepare the application.

Country overviewchecked 30 Oct 2026

GOBARdhan (Cabinet, 6 Aug 2026): administered CBG price ₹2,110/MMBtu for at least ten years (FY2026-27 to FY2035-36) with CGD purchase obligations; capital aid up to ₹2 crore per TPD (not modelled). No biogas-power tariff.

Open for applications (1)

You can apply now on the published terms.

GOBARdhan administered CBG price

Open
Biomethane support
Meets every condition we checked
NPV change
+US$2.5M
NPV with support
-US$830K
Payback
12.6 yr
IRR
2.8 %
Conditions
  • met: Raw biogas for upgrading from 60 Nm³/h (project ≈ 139 Nm³/h)
What the case uses
  • Route: Biomethane
  • Biomethane price: US$0.823/Nm³
Scheme terms

₹2,110/MMBtu (≈ ₹105/kg CBG), at least ten years; CGD purchase obligation 3 % / 4 % / 5 % from FY27 / FY28 / FY29. Capital aid not added.

Next step: Confirm the current rate and conditions with the scheme operator (source below), then prepare the application.

Source: PIB GOBARdhan backgrounder 2026-08-06 · checked 30 Oct 2026 · Data confidence: Medium

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

89/100

Of every 100 kWh of energy in the methane, 89 become a product that earns money or replaces a purchase.

100 % = 7,000 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Biomethane6,200 MWh 89 %

Runs the plant

  • Digester heating560 MWh 8 %

Losses

  • Conversion losses (engine, boiler)62 MWh 0.9 %
  • Methane slip in upgrading44 MWh 0.6 %
  • Methane leaks100 MWh 2 %

What this means for the project

  • The plant buys 650 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
480K – 670K Nm³Calculated

Season: how much the digester takes for itself

In October heating the digester needs heat equal to 11 % of that month’s methane energy, in March 7 %.

October: methane energy 270 MWh · digester heating 30 MWh (11 %) · heat for a user 0 MWh

  • Methane energy of the month
  • Digester heating

How it works: from feedstock to products

  1. Feedstock23,000 t/yr
  2. Biogas1.2M Nm³/yr
  3. Gas to grid640K Nm³
  4. Useful heat0 MWh
  5. Digestate21,000 t/yr
Heat produced (gross)
559 MWh
Digester heat demand
559 MWh
Useful heat (economic)
0 MWh of 0
Power: own use / sold
0 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
6 g CO₂e/MJ
gas-tight digestate storage
Fossil comparator
94 g CO₂e/MJ
Greenhouse-gas saving
94 %
RED minimum: 65 %
Avoided emissions
1,972 t CO₂e
  • Meets the RED minimum.
  • Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.
  • Residues other than manure, maize and food waste use the RED biowaste values.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
86/100
  • Energy equivalent ≈ 309 kWe (scale score 87/100)
  • Feedstock energy ≈ 303 kWh of methane per tonne (score 55/100)
  • Feedstock available 12 of 12 months
Energy fit
43/100
  • Biomethane: raw biogas ≈ 139 Nm³/h (EU average plant ≈ 483 Nm³/h)
  • ≈ 8 km to the gas grid
Location & logistics
75/100
  • Neighbours within 300 m: odour, traffic, safety distances
Technical feasibility
100/100
  • Standard layout for this scale, no critical obstacles
Economics
0/100
  • Operating margin ≤ 0 — no payback
  • Base-case NPV is negative
  • Minimum DSCR -0.21 — below the usual bank threshold of 1.2–1.3
Regulatory complexity
18/100 risk
  • Number and weight of permitting / regulatory steps: 9 points (more = harder)
Environmental risk
41/100 risk
  • Expected methane loss 2.1 % (good practice ≤ 2 %)
  • Neighbours within 300 m: odour and incident exposure
Overall project viability
40/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Capped at 40: weak economics is not offset by other factors.
  • Strongest: Technical feasibility (100); weakest: Economics (0).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Cattle solid manure (bedded)delivered 5 km15,0001621.619 %≈ 29 km
Press mud / filter cakedelivered 18 km8,0002546.911 %≈ 117 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Wet mesophilic digestion with solids feeding

CSTR with a solids feeder and recirculation, or horizontal plug-flow for dairy manure

Working volume
≈ 4,400 m³
Retention time
46.5 days
Loading rate
3.5 kg VS/(m³·d)
Digestate storage
≈ 5,400 m³
  • Dry matter 19 % is above the pumpable limit without a solids feeder (12 %).
  • Continuous feed — continuous operation gives steady gas and the simplest control.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Two-stage layout (main + post-digester) for stability with fats or larger flows.
Alternatives
  • Horizontal plug-flow (good for 10–14 % DM cattle manure)

Climate: Punjab (Ludhiana), mean 23.7 °C, ≈ 416 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 13.8 °C), Prague (CZ) (Δ 14 °C), Kraków (PL) (Δ 14.4 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan2,9131,0258900
Feb2,6549347300
Mar2,9131,0256900
Apr1,2322622600
May1,2732712300
Jun1,2322622000
Jul1,2732712300
Aug1,2732712400
Sept1,2322622400
Oct1,2732713000
Nov2,8199927200
Dec2,9131,0258600
Σ23,0006,87255900
CAPEX, OPEX, revenue (base case)
CAPEX (USD)
Digester440K
New covered storage400K
Feedstock reception and preparation95K
Gas handling and cleaning35K
Upgrading690K
Bio-CNG (250 bar)360K
Boiler (heat only)10K
Electrical systems and controls120K
Pipework81K
Civil works120K
Grid connection6.2K
Engineering and permits190K
Contingency250K
Total2.8M
OPEX / yr (USD)
Staff2K
Maintenance42K
Maintenance (Upgrading)28K
Insurance14K
Testing and monitoring5.6K
Feedstock purchase, net of gate fees83K
Feedstock transport40K
Digestate handling11K
Purchased electricity52K
Bio-CNG transport29K
Certification and balancing22K
Total330K
Revenue + savings / yr (USD)
Biomethane270K
Incremental digestate value22K
Total290K

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: asset · 21,436 t/yr · nitrogen ≈ 76,760 kg/yr · land needed ≈ 156 ha (available 400 ha).

Incremental fertiliser value US$22K/yr, handling US$11K/yr, net US$11K/yr.

  • Digestate from delivered manure is assumed to go back to the supplying farms (return haul is in the transport cost). Fix this in the supply contracts; if farms refuse it, the plant needs its own outlet.
  • Digestate storage for 3 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 2.1 % of methane produced (range 1.2 % – 3.6 %) ≈ 288 t CO₂e/yr; fossil emissions displaced ≈ 1,254 t CO₂/yr. Losses vs benefit: 23 %.

  • Expected loss 2.1 % is above good practice (2 %): budget for monitoring.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Construction permit and national environmental approval / EIA screening
    New installation · effort: medium · to verify
  • Gas-safety approval and hazardous-area classification (IECEx or national code)
    Methane in the gas phase · effort: medium · to verify
  • Effluent / digestate discharge or land-application permit
    Digestate or treated effluent leaves the site · effort: medium · to verify
  • Setback distances, odour assessment and community consultation
    Housing within 300 m · effort: high · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season
  • Odour and noise for neighbours; blast exposure medium
    Condition: Housing within 300 m
    • Enclosed reception and storage, injection spreading
    • Community consultation before design; consequence assessment

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (163)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: GOBARdhan (Cabinet, 6 Aug 2026): administered CBG price ₹2,110/MMBtu for at least ten years (FY2026-27 to FY2035-36) with CGD purchase obligations; capital aid up to ₹2 crore per TPD (not modelled). No biogas-power tariff.
  • Dung collection from many small holdings is the main logistics challenge; urea is subsidised, so digestate N has low cash value.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

biomethane: local CAPEX factor
0.385 … 0.715 —
NPV low…high: -US$4.4M … -US$2.2M
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.066 … 0.096 —
NPV low…high: -US$3.4M … -US$3.3M
Mineral potassium price
0.3591 … 0.4079 USD/kg K₂O
NPV low…high: -US$3.3M … -US$3.3M
Mineral nitrogen price
0.5265 … 0.9159 USD/kg N
NPV low…high: -US$3.4M … -US$3.3M
Mineral phosphorus price
0.7147 … 0.9305 USD/kg P₂O₅
NPV low…high: -US$3.3M … -US$3.3M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.4172 USD/Nm³ · CALCULATED_VALUE · LOW
Uncontracted industrial gas-parity reference: 38.53977914768159 EUR/MWh LHV × product LHV; engineering range 80–130% of parity, not observed transactions. PPAC notification 30.09.2026: gas price ceiling (market-priced deepwater/HPHT gas) US$ 9.89/MMBtu GCV for Oct 2026 – Mar 2027 (APM price Oct 2026 US$ 11.22, Sep 9.00) + US$ 1.5/MMBtu pipeline & distribution adder (assumption) = US$ 11.39/MMBtu; converted at 1.1193 USD/EUR (2026-11-09); HHV × 1.11 → LHV. GOBARdhan procurement is conditional and shown only as a separate support case; buyer quotation and logistics required.
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
biomethane: local CAPEX factor: 0.55 — · CALCULATED_VALUE · LOW
biomethane only. SATAT CBG plant, Bagalkot (Karnataka): ₹ 42 crore for 10.2 t/day CBG from 200 t/day press mud ≈ 1 000 Nm³/h raw biogas → ≈ €4.3 M vs ≈ €8 M for the same plant at German prices; Indian-made digesters and upgrading. Single project — check against SATAT tenders
2025-06 · checked 2026-11-04 · Single published plant cost scaled to the model's reference plant
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.061 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.5 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 7 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 3.123 USD/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 1.455 USD/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.076 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 2.72 % (Baa3; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.04109 USD/kWh · CALCULATED_VALUE · MEDIUM
IEX day-ahead market average FY 2025-26 Rs 3.86/kWh; converted at 105.144 INR/EUR (2026-11-09)
2026-03-31 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
REVIEW_REQUIRED: Observation is 223 days old; exceeds the 60-day review policy
Documented nominal reference (may include estimated adders): 3.86 INR (ENGINEERING_ASSUMPTION); FX (2026-11-09): 105.1 INR/EUR (MARKET_DATA)
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.3833 USD/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup × 0.45 national factor
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 0.67 USD/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup × 0.45 national factor
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 0.845 USD/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup × 0.45 national factor
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 93.94 INR/USD · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-09
2026-11-09 · checked 2026-11-10 · INR per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Value of useful heat (displaced gas / boiler efficiency): 0.04793 USD/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 38.53977914768159 €/MWh LHV ÷ 0.9
2026-09-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 38.86 USD (ENGINEERING_ASSUMPTION); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA)
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 1.405 USD/h · CALCULATED_VALUE · MEDIUM
MoSPI PLFS Annual Report 2025 (press note 27.03.2026): regular wage/salaried earnings, men Rs 24 217, women Rs 18 353/month; ≈ Rs 22 000 all persons × 12 × 1.15 employer EPF/ESI ÷ 2 300 h; converted at 105.144 INR/EUR (2026-11-09)
2025-12-31 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 132 INR (ENGINEERING_ASSUMPTION); FX (2026-11-09): 105.1 INR/EUR (MARKET_DATA)
Plant operator wage relative to the economy-wide average: 1 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ economy-wide average (middle-income economy; no premium)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.07164 USD/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 0.7052 USD/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.07984 USD/kWh · USER_INPUT · MEDIUM
USER_INPUT 7.5 INR/kWh / FX 105.1435; Official EUR reference rate, 2026-11-09. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
cattle_solid_manure: dry matter: 16 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
cattle_solid_manure: volatile solids: 82 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
cattle_solid_manure: BMP (scenarios ± inter-laboratory spread): 165 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
press_mud: dry matter: 25 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
press_mud: volatile solids: 75 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
press_mud: BMP (scenarios ± inter-laboratory spread): 250 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified