Sample report · United Kingdom

Grain distillery / bioethanol · Grain stillage: 35,000 t/yr

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

A Speyside malt distillery digests pot ale and spent lees on site and uses the biogas to cut gas for distillation steam; draff is still sold as cattle feed. Diageo's Roseisle and Dailuaine distilleries use this model.

Operating assumptions

  • Grain stillage: 35,000 t/yr · DM: 4.5 % · 11 months · Season starts: September · We pay for collection / disposal · What you pay for disposal: 6 GBP/t
  • Electricity: 2,500,000 kWh/yr · Electricity price on your bill (if known): 0.245 GBP/kWh
  • All year: hot water, steam, process · We use natural gas: 3,500,000 m³/yr
  • Land available for spreading digestate: 0 ha · Distance to the gas grid (for biomethane): 3 km
  • Existing lagoon / store that could be covered: 8,000 m³
  • Grid connection? Yes

What to verify

Confirm current pot-ale disposal (sea discharge consent, land spreading or syrup) and its cost, the steam profile and the SEPA permit.

Possible with conditions

It can pay off, but only if the key conditions hold — confirm them in a feasibility study.

  • Base NPV positive (€2.2M), payback ≈ 4.3 yrs.
  • Conservative-case NPV is negative (-€600K) — sensitive to key assumptions.

Largest benefit — “electricity savings (self-consumption)”: ≈ 61 % of all revenue and savings.

What would change the verdict
  • → Secure long-term heat and power offtake; benchmark CAPEX with 3–5 suppliers.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

Grey zone: the answer flips between the conservative and the optimistic case. Before paying for a feasibility study, check these first:

NPV: conservative -€600K · base €2.2M · optimistic €3.6M

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in > 99 % of cases.

  1. CH₄ −20 % · Already entered (-€1.1M)
  2. Get an offer for exported power (PPA or tariff) · Energy prices −20 % (-€1.1M)
  3. Feedstock potential −20 % (-€1M)

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

To reach a bankable estimate (±15 %)
  1. Laboratory methane-potential (BMP) test of 2–3 feedstock samples — ≈ €300–800 each · Already entered
  2. 2–3 supplier quotes for the plant
  3. Grid or gas-network connection conditions from the operator
  4. Letters of intent for feedstock supply and for heat, power or biomethane offtake
  5. Then a feasibility study with permits and financing (±15 %)
From screening to construction

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€1.5M – €2M
≈ £1.4M (base)
Payback
3 yr – 13.5 yr
base: 4.3 yr · no subsidies
NPV (base)
€2.2M
range: -€600K … €3.6M
Chosen route
CHP (power + heat)
Confidence: Medium

Feedstock and energy

Feedstock potential
35,000 t/yr
energy ≈ 149 kWh CH₄/t
Biogas
730K – 1M Nm³/yr
≈ 116 Nm³/h (base)
Net energy
1,400 – 1,900 MWh/yr
useful heat: 380 – 1,100 MWh · ≈ 73 % of your electricity use
Candidate capacity
280 kWe
medium (0.25–1 MW)

How far you can rely on these numbers

Medium · 90/100
  • Backed by your data and our sources90
  • Needs a feasibility study (lab, quotes, contracts)10

90/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

You have entered everything this screening can use.

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • "grain distillery stillage" is very dilute: consider a high-rate reactor (UASB / covered lagoon) instead of a CSTR — the model's CSTR costing is conservative here.
  • In this configuration the digestate is a cost rather than an asset.
  • CHP performance uses a 50 Hz biogas full-load catalogue reference (03/2025), interpolated between ratings; part-load and ambient derating require supplier confirmation.
  • Market data require review (econ.electricity_spot_eur_kwh). Observation dates and validity are shown in the evidence; these are not verified current customer quotations.
Compared with the market
Our estimate: ≈ 6,000 €/kW at ≈ 280 kW
  • 3,400–7,500 EUR/kW — Flexible plant, Germany · within rangeDBFZ / Fraunhofer IEE for BMWK (February 2024): €7,521 per kW rated (≈ €3,400 per kW installed) capacity · 2023 · Official study
  • 2,800–7,000 EUR/kW — Agricultural plants, Poland · within rangePolish trade press 2023–2024 (PLN 7–20 m for 500 kW; PLN 12–16 m for 1 MW); IOŚ-PIB: ≈ PLN 30 m for 1 MW · 2023–2024 · Trade press

Market figures are mostly trade press and supplier estimates, not audited budgets. Real prices come from 3–5 supplier quotes.

Country conditions
  • High electricity prices make on-site CHP for own use attractive; policy favours food waste over manure.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Strong candidate”
  • The conservative case must stay profitable too (its NPV is -€600K).
Order of action
  1. 1Ask 3–5 suppliers for quotes: the project breaks even up to an investment of €3.5M. →

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Check how your bill splits energy and capacity charges€1.4M … €3.1M—
Get supplier quotes for the plant€1.6M … €2.8M—
Verify the market price€1.7M … €2.5M—
Confirm a reliable heat buyer and demand€2.1M … €2.3M—
How to check: Check how your bill splits energy and capacity charges
  1. Take the last 12 electricity invoices.
  2. Split each into the energy part (per kWh) and capacity, network and fixed charges; own generation saves mainly the energy part.

Then enter it in: Energy step: electricity price per kWh (energy part, excl. VAT)

How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: United Kingdom.
Feedstock (screening values, to be confirmed):
- grain distillery stillage: 35,000 t/year, DM ≈ 4.5 %
Design basis from the screening: raw biogas ≈ 120 Nm³/h at ≈ 56 % CH₄; digester working volume ≈ 2,600 m³; combined heat and power ≈ 280 kWe; new digestate storage ≈ 0 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Confirm a reliable heat buyer and demand
  1. Confirm the buyer's monthly heat demand and the temperature they need.
  2. Agree a price per kWh linked to their current fuel, and a term of at least the loan period.
Request to send
Offer of renewable heat
Site: United Kingdom. A biogas plant can supply ≈ 1,100 MWh of heat a year (hot water, ≈ 80–90 °C) all year round. Please tell us your monthly heat use, the temperature you need, your current fuel and its price, and the price per kWh and term you would accept.

Then enter it in: Energy step: price the heat buyer pays per kWh

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Electricity value at NPV = 0
€0.134/kWh
now €0.25/kWh
Highest installed cost at NPV = 0
€3.5M
now €1.7M
Feedstock price headroom
€5.76/t
can pay up to €5.76 per tonne more for every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
€1.1M
Median NPV
€1.7M
NPV P90 (1 in 10 better)
€2.1M
Chance that NPV > 0
> 99 %
Median payback
5 yr

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: 2.2M)

  1. CH₄ −20 %-1.1M
  2. Energy prices −20 %-1.1M
  3. Feedstock potential −20 %-1M
  4. CHP downtime +10 pp-660K
  5. CAPEX +20 %-400K
  6. Useful heat (economic) −50 %-270K
  7. Maintenance +30 %-200K
  8. Feedstock transport +50 %0
NPV = 0 if CAPEX falls by
already positive
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
already positive
relative to the base case

Scenarios

Route: CHP (power + heat). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€750K
  • Electricity self-consumption savings460K
  • Avoided disposal cost240K
  • Useful heat (economic)52K
OPEX / yr€360K
  • Digestate handling260K
  • CHP service and overhaul reserve37K
  • Staff31K
  • Maintenance24K
Operating margin (EBITDA)€380K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr732.7931.51,006
CAPEX€2M€1.7M€1.5M
OPEX / yr€350K€360K€360K
Revenue + savings / yr€500K€750K€860K
Operating margin (EBITDA)€150K€380K€500K
Simple payback13.5 yr4.3 yr3 yr
Discounted paybackno payback5.6 yr3.8 yr
NPV-€600K€2.2M€3.6M
IRR1.8 %21.4 %31.3 %
DSCR (min)0.92.84.1

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).

Cumulative cash flow, €
-2.5M-50K2.4M4.9M7.4M03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) chosen€1.7M€380K4.3 yr€2.2M-€600K … €3.6M
Boiler (heat only) €1.1M€42K> 25 yr-€760K-€2.5M … €380K
Biomethane €2.4M-€36Kno payback-€2.9M-€5.1M … -€1.4M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 88 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 18,000CHP (power + heat)130€1M€620K
× 0.75 26,000CHP (power + heat)210€1.4M€1.5M
× 1 your input35,000CHP (power + heat)280€1.7M€2.2M
× 1.5 53,000CHP (power + heat)420€2.2M€2.5M
× 2 70,000CHP (power + heat)600€2.8M€2.6M
× 3 110,000CHP (power + heat)900€3.9M€3M

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

There is a scheme your project can apply for

It pays no more than the market, so it does not improve the economics.

Best option: Green Gas Support Scheme Details ↓

NPV change
-€3.1M
NPV with support
-€850K
Payback
13.4 yr
IRR
1.9 %

Next step: Confirm the current rate and conditions with the scheme operator (source below), then prepare the application.

Country overviewchecked 30 Oct 2026

GGSS pays 7.09 p/kWh (2026/27, Tier 1) for 15 years on injected biomethane (≥ 50 % waste feedstock); applications until March 2028, commissioning by March 2030; no CHP tariff for new plants.

Open for applications (1)

You can apply now on the published terms.

Green Gas Support Scheme

Open
Biomethane support
Meets every condition we checked
NPV change
-€3.1M
NPV with support
-€850K
Payback
13.4 yr
IRR
1.9 %
Conditions
  • met: Wastes and residues: at least 50 % of biogas energy (project 100 %)
  • met: Biomethane injected into the gas grid (included in the case)
  • met: Raw biogas for upgrading from 60 Nm³/h (project ≈ 88 Nm³/h)
What the case uses
  • Route: Biomethane
  • Biomethane price: €1.18/Nm³
Scheme terms

Tier 1 7.09 p/kWh in 2026/27 (CPI-linked) + gas and certificate sales; 15 years, ≥ 50 % waste; budget-capped queue.

Next step: Confirm the current rate and conditions with the scheme operator (source below), then prepare the application.

Source: Ofgem GGSS tariff table 2026/27; Ofgem GGSS guidance v3.0 (13.10.2026) · checked 30 Oct 2026 · Data confidence: Medium

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

52/100

Of every 100 kWh of energy in the methane, 52 become a product that earns money or replaces a purchase.

100 % = 5,200 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Electricity used on site1,800 MWh 35 %
  • Heat for a user860 MWh 17 %

Runs the plant

  • Plant’s own electricity160 MWh 3 %
  • Digester heating1,100 MWh 20 %

Produced, not used

  • Heat with no buyer220 MWh 4 %

Losses

  • Conversion losses (engine, boiler)890 MWh 17 %
  • Gas sent to the flare88 MWh 2 %
  • Methane leaks78 MWh 1 %

What this means for the project

  • The plant uses 24 % of its energy itself, mostly to heat the digester in winter. Insulation, heat recovery from the digestate and a drier feedstock mix reduce it.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Engine efficiency: electricity / heat
40 % / 46 %Assumption
Heat need
3,500,000 m³Your data
Site electricity use
2,500 MWhYour data
Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
1,400 – 1,900 MWhCalculated

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 23 % of that month’s methane energy, in July 18 %.

January: methane energy 480 MWh · digester heating 110 MWh (23 %) · heat for a user 72 MWh

  • Methane energy of the month
  • Digester heating
  • Heat for a user

How it works: from feedstock to products

  1. Feedstock35,000 t/yr
  2. Biogas930K Nm³/yr
  3. Electricity1,800 MWh
  4. Useful heat860 MWh
  5. Heat without demand220 MWh
  6. Digestate34,000 t/yr
Heat produced (gross)
2,142 MWh
Digester heat demand
1,061 MWh
Useful heat (economic)
865 MWh of 1,081
Power: own use / sold
1,837 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
28 g CO₂e/MJ
gas-tight digestate storage
Fossil comparator
183 g CO₂e/MJ
Greenhouse-gas saving
85 %
RED minimum: 80 %
Avoided emissions
1,241 t CO₂e
  • Meets the RED minimum.
  • Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.
  • Residues other than manure, maize and food waste use the RED biowaste values.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
79/100
  • Energy equivalent ≈ 280 kWe (scale score 85/100)
  • Feedstock energy ≈ 149 kWh of methane per tonne (score 32/100)
  • Feedstock available 11 of 12 months
Energy fit
93/100
  • Own consumption absorbs 100 % of the electricity produced
  • Useful heat 865 MWh of 1081 MWh available after digester needs
Location & logistics
75/100
  • Not enough land for the digestate
Technical feasibility
100/100
  • Standard layout for this scale, no critical obstacles
Economics
92/100
  • Base-case simple payback ≈ 4.3 years
Regulatory complexity
23/100 risk
  • Number and weight of permitting / regulatory steps: 10 points (more = harder)
Environmental risk
39/100 risk
  • Expected methane loss 2.5 % (good practice ≤ 2 %)
  • Surplus digestate: risk of nitrogen over-application
Overall project viability
85/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Technical feasibility (100); weakest: Environmental risk (61).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Grain stillage35,0004.514.9on site≈ 48 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Wet mesophilic digestion (CSTR)

Vertical CSTR with mechanical mixing and a membrane gas holder

Working volume
≈ 2,600 m³
Retention time
25 days
Loading rate
1.7 kg VS/(m³·d)
Digestate storage
≈ 2,800 m³
  • Dry matter 4.5 %: a liquid mix suited to wet mesophilic digestion.
  • Feedstock is seasonal: a continuous plant would sit idle; a campaign-based or buffered design is more flexible.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Single stage plus a gas-tight digestate store as post-digester: sufficient at this scale.

Climate: Scotland (Stirling), mean 9.9 °C, ≈ 2,938 heating degree-days. Closest climate analogues: Copenhagen (DK) (Δ 2 °C), Dresden (DE, east) (Δ 2.9 °C), Munich (DE, Bavaria) (Δ 3.1 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan3,24647510972170
Feb2,9584339767155
Mar3,24647510575170
Apr3,1414609776165
May3,2464759385170
Jun3,1414608586165
Jul3,2464758591170
Aug00000
Sept3,1414608784165
Oct3,2464759682170
Nov3,14146010173165
Dec3,24647510674170
Σ35,0005,1231,0618651,837
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester440K
Covering existing storage79K
Feedstock reception and preparation79K
Gas handling and cleaning41K
CHP (power + heat)480K
Heat network54K
Backup boiler7.9K
Electrical systems and controls71K
Pipework47K
Civil works71K
Grid connection34K
Engineering and permits110K
Contingency150K
Total1.7M
OPEX / yr (EUR)
Staff31K
CHP service and overhaul reserve37K
Maintenance24K
Insurance8.3K
Testing and monitoring5K
Digestate handling260K
Total360K
Revenue + savings / yr (EUR)
Electricity self-consumption savings460K
Useful heat (economic)52K
Avoided disposal cost240K
Total750K

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: liability / cost · 33,816 t/yr · nitrogen ≈ 74,813 kg/yr · land needed ≈ 440 ha (available 0 ha).

Incremental fertiliser value €0/yr, handling €260K/yr, net -€260K/yr.

  • Not enough land: ≈ 440 ha needed at 170 kg N/ha. Surplus digestate is a cost (agreements with neighbours, separation, pelletising).
  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 2.5 % of methane produced (range 1.5 % – 4 %) ≈ 253 t CO₂e/yr; fossil emissions displaced ≈ 573 t CO₂/yr. Losses vs benefit: 44 %.

  • Expected loss 2.5 % is above good practice (2 %): budget for monitoring.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Planning permission (local planning authority) incl. odour, traffic and landscape
    New installation · effort: high · to verify
  • Environmental Permit (Environment Agency / SEPA / NRW / NIEA): standard rules or bespoke
    Treatment of waste or manure · effort: high · to verify
  • DSEAR hazardous-area assessment
    Methane in the gas phase · effort: medium · confirmed
  • Nitrate Vulnerable Zone rules and Farming Rules for Water
    Digestate is spread on land · effort: medium · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (161)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: GGSS pays 7.09 p/kWh (2026/27, Tier 1) for 15 years on injected biomethane (≥ 50 % waste feedstock); applications until March 2028, commissioning by March 2030; no CHP tariff for new plants.
  • High electricity prices make on-site CHP for own use attractive; policy favours food waste over manure.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

chp: local CAPEX factor
0.651 … 1.209 —
NPV low…high: €1.6M … €2.8M
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.054 … 0.084 —
NPV low…high: €1.7M … €2.5M
Avoidable share of an unsplit customer electricity bill
0.7 … 1 —
NPV low…high: €1.4M … €3.1M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.6 EUR/Nm³ · CALCULATED_VALUE · LOW
National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
chp: local CAPEX factor: 0.93 — · CALCULATED_VALUE · MEDIUM
0.72 traded equipment + 0.28 × local/German labour cost (23.5/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.049 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 7.67 EUR/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 3.08 EUR/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.064 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.74 % (Aa3; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.1026 EUR/kWh · CALCULATED_VALUE · MEDIUM
Ofgem wholesale market indicators: GB day-ahead baseload, monthly average weighted by volume (broker data), Jul 2025 – Jun 2026 mean £85.63/MWh; converted at 0.8343 GBP/EUR (2026-11-09)
2026-06-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
REVIEW_REQUIRED: Observation is 132 days old; exceeds the 60-day review policy
Documented nominal reference (may include estimated adders): 0.08563 GBP (ENGINEERING_ASSUMPTION); FX (2026-11-09): 0.8343 GBP/EUR (MARKET_DATA)
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 0.8343 GBP/EUR · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-09
2026-11-09 · checked 2026-11-10 · GBP per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Value of useful heat (displaced gas / boiler efficiency): 0.05957 EUR/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 53.61740381157857 €/MWh LHV ÷ 0.9
2026-06-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 40.3 GBP (ENGINEERING_ASSUMPTION); FX (2026-11-09): 0.8343 GBP/EUR (MARKET_DATA)
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 33.56 EUR/h · CALCULATED_VALUE · MEDIUM
ONS ASHE 2026 (provisional, Apr 2026): full-time median hourly pay £20.81 × 1.17 mean/median × 1.15 employer NI (15 %) and pension ≈ £28.0/h; converted at 0.8343 GBP/EUR (2026-11-09)
2026-04-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 28 GBP (ENGINEERING_ASSUMPTION); FX (2026-11-09): 0.8343 GBP/EUR (MARKET_DATA)
Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.131 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 1.07 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.2937 EUR/kWh · USER_INPUT · MEDIUM
USER_INPUT 0.245 GBP/kWh / FX 0.8343; Official EUR reference rate, 2026-11-09. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
grain_stillage: dry matter: 4.5 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
grain_stillage: volatile solids: 92 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
grain_stillage: BMP (scenarios ± inter-laboratory spread): 360 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified