Business situation

A small supplier of fish-processing residues considers its own plant against regional co-digestion. The reference is Creed IWMF, which mixes salmon residues with other organics. The modelled 140 t/year is a rounded scenario quantity, not a reported operating year.

Operating assumptions

  • Fish processing residues: 140 t/yr · DM: 30 % · 12 months · Other / don't know
  • Electricity: — · Electricity price on your bill (if known): —
  • No heat needed
  • Land available for spreading digestate: — · Distance to the gas grid (for biomethane): —
  • Grid connection? Yes

What to verify

Verify weighed annual supply, lab BMP, salinity, hygienisation and the alternative value as fishmeal or feed. A reference co-digestion plant does not establish the economics of a standalone installation processing fish residues alone.

Reference data: Food Nation / Landia — salmon residues at Creed IWMF

GB; Isle of Lewis · 2017–2022 · Source checked: 2026-10-29

ParameterValueType
FM per batch7 t/shiftReported
FM total835.66 t (2017–2022)Reported
Source

Not recommended at this scale

For this amount of feedstock a stand-alone plant makes no economic sense.

  • Energy equivalent ≈ 4 kWe — below 25 kW — and the base-case NPV is negative (-€720K).

Main reason — small scale: the feedstock supports only ≈ 4 kW, while the plant costs ≈ €87K per kW. Digester, storage and CHP are expensive even at small capacity.

What would change the verdict
  • → Consider the simplest option — a biogas boiler for a constant heat need — or supplying feedstock to a larger plant.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

A clear no under these conditions: even the optimistic case does not pay back. Don't spend money on a feasibility study unless one of the changes above happens.

NPV: conservative -€870K · base -€720K · optimistic -€650K

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in < 1 % of cases.

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€330K – €440K
≈ £310K (base)
Payback
no payback
base: no payback · no subsidies
NPV (base)
-€720K
range: -€870K … -€650K
Chosen route
Boiler (heat only)
Confidence: Medium

Feedstock and energy

Feedstock potential
140 t/yr
energy ≈ 684 kWh CH₄/t
Biogas
10K – 16K Nm³/yr
≈ 2 Nm³/h (base)
Net energy
0 MWh/yr
Useful heat
Candidate capacity
4 kWe
micro (< 50 kW)

How far you can rely on these numbers

Medium · 81/100
  • Backed by your data and our sources81
  • You can still add+1
  • Limits of our data−8
  • Needs a feasibility study (lab, quotes, contracts)10

81/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainLand available for spreading digestate (ha)Small effectOwn and rented fields that can take digestate+1

With all of it: up to 82/100

Limits on our side

  • Scale outside the CAPEX calibration range (30 kW – 5 MW electrical equivalent)−8

These come from our country price and cost data or the screening scope, not from your project. We update them.

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Ammonium nitrogen in the digester ≈ 17.3 g/L (about 60 % of the 28.8 kg/t total nitrogen). Above 3 g/L methane formation is inhibited (FNR): the model cuts the yield by 30 %. Measure NH₄-N, dilute with low-nitrogen water or a co-substrate, or plan a long acclimation.
  • Fats are 100 % of the organic matter: risk of foaming and long-chain fatty-acid inhibition; dose gradually.
  • Parameters for "fish processing residues" have low confidence — a laboratory analysis (BMP) is needed.
  • "fish processing residues" often has an alternative use (e.g. animal feed) — enter its sale price.
  • "fish processing residues": brine, salted product or seawater used in processing raise sodium. Above 3.5 g/L of sodium in the digester methane formation is moderately inhibited, above 8 g/L strongly (McCarty): measure sodium in this stream and check the planned mix.
  • Animal by-products (Cat. 3) → pasteurisation and veterinary approval required.
  • Fat-rich residues (grease, slaughter, fish, olive streams) make up over 25 % of the organic matter. Their lipid share is not catalogued — measure ether extract: above ≈ 30 % of VS the process is at high risk of failure.
  • No heat buyer was quantified, so the boiler route earns almost nothing: it is only the cheapest of routes that all lose money. This is not a recommendation to build it — find a heat or power buyer, or add energy-dense feedstock.
  • Market data require review (econ.electricity_spot_eur_kwh). Observation dates and validity are shown in the evidence; these are not verified current customer quotations.
Country conditions
  • High electricity prices make on-site CHP for own use attractive; policy favours food waste over manure.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 59 MWh a year, valued at ≈ £0.0497 per kWh.
Not recommended at this scale-€730K-€5.8Kheat ≥ £1.03 per kWh

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Get supplier quotes for the plant-€860K … -€580K—
Verify the market price-€750K … -€680K—
Check the fertiliser value of the digestate-€720K … -€720K—
Lab test of the methane yield (BMP)-€720K … -€720K—
How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: United Kingdom.
Feedstock (screening values, to be confirmed):
- fish processing residues: 140 t/year, DM ≈ 30.0 %
Design basis from the screening: raw biogas ≈ 2 Nm³/h at ≈ 66 % CH₄; digester working volume ≈ 37 m³; biogas boiler ≈ 10 kWth; new digestate storage ≈ 62 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

How to check: Lab test of the methane yield (BMP)
  1. Take 3–5 subsamples of each stream over 2–4 weeks, mix them, keep them at 4 °C and deliver within 24 h.
  2. Order dry matter (DM), volatile solids (VS) and a methane potential test (BMP, VDI 4630) with the cellulose control reported.
  3. A valid test reports cellulose at 340–395 NL CH₄/kg VS; ask for a repeat otherwise.
Request to send
Request for quotation: biogas potential analysis
Site: United Kingdom.
Feedstock (screening values, to be confirmed):
- fish processing residues: 140 t/year, DM ≈ 30.0 %
Design basis from the screening: raw biogas ≈ 2 Nm³/h at ≈ 66 % CH₄; digester working volume ≈ 37 m³; biogas boiler ≈ 10 kWth; new digestate storage ≈ 62 m³.
Per sample please quote: dry matter (DM, % of fresh mass), volatile solids (VS, % of DM) and biochemical methane potential (BMP, NL CH₄ per kg VS) to VDI 4630, with the cellulose control result and the test duration. Please state price, turnaround time and sampling and shipping instructions.

Then enter it in: Feedstock step: DM, VS and BMP on each stream

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Highest installed cost at NPV = 0
not reachable
now €370K
Feedstock price headroom
€467/t
needs €467 per tonne less cost, or a gate fee, on every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-€800K
Median NPV
-€750K
NPV P90 (1 in 10 better)
-€710K
Chance that NPV > 0
< 1 %
Median payback
no payback

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: -720K)

  1. CAPEX +20 %-94K
  2. Maintenance +30 %-24K
  3. Feedstock potential −20 %-1.6K
  4. CH₄ −20 %-200
  5. Useful heat (economic) −50 %0
  6. Feedstock transport +50 %0
  7. CHP downtime +10 pp0
  8. Energy prices −20 %2K
NPV = 0 if CAPEX falls by
not reachable
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
not reachable
relative to the base case

Scenarios

Route: Boiler (heat only). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€1.4K
  • Incremental digestate value1.4K
OPEX / yr€33K
  • Staff18K
  • Maintenance7.4K
  • Testing and monitoring5K
  • Insurance1.8K
Operating margin (EBITDA)-€32K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr1014.616.3
CAPEX€440K€370K€330K
OPEX / yr€40K€33K€31K
Revenue + savings / yr€920€1.4K€1.7K
Operating margin (EBITDA)-€39K-€32K-€29K
Simple paybackno paybackno paybackno payback
Discounted paybackno paybackno paybackno payback
NPV-€870K-€720K-€650K
IRR———
DSCR (min)-1.3-1.3-1.3

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).

Cumulative cash flow, €
-1.2M-890K-570K-250K69K03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) €410K-€31Kno payback-€760K-€920K … -€680K
Boiler (heat only) chosen€370K-€32Kno payback-€720K-€870K … -€650K
Biomethane €1.1M-€51Kno payback-€1.7M-€2.1M … -€1.5M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 2 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 70Boiler (heat only)2€350K-€700K
× 0.75 110Boiler (heat only)3€360K-€710K
× 1 your input140Boiler (heat only)4€370K-€720K
× 1.5 210Boiler (heat only)6€380K-€740K
× 2 280Boiler (heat only)8€400K-€760K
× 3 420Boiler (heat only)13€420K-€790K

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

Schemes are running, but your project does not meet their conditions

Main obstacle — Green Gas Support Scheme: Raw biogas ≈ 2 Nm³/h is below the practical upgrading minimum (60 Nm³/h) — consider a cluster. Details ↓

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Country overviewchecked 30 Oct 2026

GGSS pays 7.09 p/kWh (2026/27, Tier 1) for 15 years on injected biomethane (≥ 50 % waste feedstock); applications until March 2028, commissioning by March 2030; no CHP tariff for new plants.

Open for applications (1)

You can apply now on the published terms.

Green Gas Support Scheme

Open
Biomethane support
Does not qualify
Raw biogas ≈ 2 Nm³/h is below the practical upgrading minimum (60 Nm³/h) — consider a cluster.

Not calculated: the project does not meet the conditions.

Conditions
  • met: Wastes and residues: at least 50 % of biogas energy (project 100 %)
  • met: Biomethane injected into the gas grid (included in the case)
  • not met: Raw biogas for upgrading from 60 Nm³/h (project ≈ 2 Nm³/h)
What the case uses
  • Route: Biomethane
  • Biomethane price: €1.18/Nm³
Scheme terms

Tier 1 7.09 p/kWh in 2026/27 (CPI-linked) + gas and certificate sales; 15 years, ≥ 50 % waste; budget-capped queue.

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Source: Ofgem GGSS tariff table 2026/27; Ofgem GGSS guidance v3.0 (13.10.2026) · checked 30 Oct 2026 · Data confidence: Medium

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

0/100

Of every 100 kWh of energy in the methane, 0 become a product that earns money or replaces a purchase.

100 % = 96 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Runs the plant

  • Digester heating10 MWh 11 %

Produced, not used

  • Heat with no buyer75 MWh 78 %

Losses

  • Conversion losses (engine, boiler)9.4 MWh 10 %
  • Methane leaks1.4 MWh 2 %

What this means for the project

  • 75 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income.
  • The plant buys 3 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Heat need
no heat userYour data
Methane leaks, base case
2 %Assumption

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 13 % of that month’s methane energy, in July 9 %.

January: methane energy 8 MWh · digester heating 1 MWh (13 %) · heat for a user 0 MWh

  • Methane energy of the month
  • Digester heating

How it works: from feedstock to products

  1. Feedstock140 t/yr
  2. Biogas15K Nm³/yr
  3. Useful heat0 MWh
  4. Heat without demand75 MWh
  5. Digestate120 t/yr
Heat produced (gross)
85 MWh
Digester heat demand
10 MWh
Useful heat (economic)
0 MWh of 75
Power: own use / sold
0 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
63 g CO₂e/MJ
open digestate storage
Fossil comparator
80 g CO₂e/MJ
Greenhouse-gas saving
21 %
RED minimum: 80 %
Avoided emissions
0 t CO₂e
  • Below the RED minimum: a gas-tight digestate store, off-gas combustion or more manure in the mix raise the saving.
  • Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.
  • Residues other than manure, maize and food waste use the RED biowaste values.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
42/100
  • Energy equivalent ≈ 4 kWe (scale score 3/100)
  • Feedstock energy ≈ 684 kWh of methane per tonne (score 79/100)
  • Feedstock available 12 of 12 months
  • Most feedstock has low-confidence parameters
  • Ammonia / fat inhibition risk lowers the yield
  • Feedstock has an alternative use; its price is not given
Energy fit
0/100
  • Own consumption absorbs 0 % of the electricity produced
  • Useful heat 0 MWh of 75 MWh available after digester needs
  • Electricity consumption not given
Location & logistics
100/100
  • Land for digestate unknown
Technical feasibility
25/100
  • Energy equivalent below 25 kWe: hardly sensible technically
  • Ammonia / fat inhibition needs active process control
  • ABP pasteurisation adds complexity
  • Dry digestion — fewer suppliers
Economics
0/100
  • Operating margin ≤ 0 — no payback
  • Base-case NPV is negative
  • Minimum DSCR -1.29 — below the usual bank threshold of 1.2–1.3
Regulatory complexity
36/100 risk
  • Number and weight of permitting / regulatory steps: 13 points (more = harder)
Environmental risk
20/100 risk
  • Expected methane loss 1.5 % — within good practice if gas-tight and monitored
  • Unknown where the digestate will go
Overall project viability
32/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Location & logistics (100); weakest: Economics (0).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Fish processing residues14030103.2on site≈ 149 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Dry (high-solids) digestion, mesophilic

Garage (box) batch digesters with percolate recirculation, or horizontal plug-flow

Working volume
≈ 37 m³
Retention time
96 days
Loading rate
2.5 kg VS/(m³·d)
Digestate storage
≈ 62 m³
  • Average mix dry matter 30 % ≥ 22 %: wet digestion would need dilution, increasing volume and heat losses.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Two-stage layout (main + post-digester) for stability with fats or larger flows.
Alternatives
  • Wet digestion diluted with slurry/effluent — cheaper equipment, larger digester
  • Separate pasteurisation (70 °C / 1 h) ahead of a mesophilic digester instead of thermophilic operation

Climate: Scotland (Stirling), mean 9.9 °C, ≈ 2,938 heating degree-days. Closest climate analogues: Copenhagen (DK) (Δ 2 °C), Dresden (DE, east) (Δ 2.9 °C), Munich (DE, Bavaria) (Δ 3.1 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan128100
Feb117100
Mar128100
Apr118100
May128100
Jun118100
Jul128100
Aug128100
Sept118100
Oct128100
Nov118100
Dec128100
Σ140941000
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester16K
New covered storage2K
New open storage2.4K
Feedstock reception and preparation140K
Pasteurisation (70 °C / 1 h)66K
Gas handling and cleaning28K
Boiler (heat only)970
Electrical systems and controls16K
Pipework10K
Civil works16K
Grid connection9.3K
Engineering and permits25K
Contingency33K
Total370K
OPEX / yr (EUR)
Staff18K
Maintenance7.4K
Insurance1.8K
Testing and monitoring5K
Digestate handling660
Purchased electricity890
Total33K
Revenue + savings / yr (EUR)
Incremental digestate value1.4K
Total1.4K

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: neutral · 123 t/yr · nitrogen ≈ 3,857 kg/yr · land needed ≈ 23 ha (land not given).

Incremental fertiliser value €1.4K/yr, handling €660/yr, net €770/yr.

  • Enter the land area available for spreading: without it digestate is a potential liability.
  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 1.5 % of methane produced (range 0.5 % – 3 %) ≈ 3 t CO₂e/yr; fossil emissions displaced ≈ 0 t CO₂/yr.

  • Methane losses could cancel the climate benefit. Do not claim emission reductions without measurements.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: medium. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Planning permission (local planning authority) incl. odour, traffic and landscape
    New installation · effort: high · to verify
  • Environmental Permit (Environment Agency / SEPA / NRW / NIEA): standard rules or bespoke
    Treatment of waste or manure · effort: high · to verify
  • DSEAR hazardous-area assessment
    Methane in the gas phase · effort: medium · confirmed
  • Nitrate Vulnerable Zone rules and Farming Rules for Water
    Digestate is spread on land · effort: medium · to verify
  • Animal by-products approval: pasteurisation 70 °C / 1 h (Cat. 3) or pressure sterilisation (Cat. 2), veterinary registration
    Slaughter / dairy / food residues in the feed · effort: high · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Biological hazards: pathogens in animal by-products and food waste high
    Condition: Animal by-products / food waste in the mix
    • Pasteurisation 70 °C / 1 h (Cat. 3) with time–temperature control
    • Separate dirty and clean zones, vehicle disinfection
    • Veterinary supervision and traceability
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (165)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: GGSS pays 7.09 p/kWh (2026/27, Tier 1) for 15 years on injected biomethane (≥ 50 % waste feedstock); applications until March 2028, commissioning by March 2030; no CHP tariff for new plants.
  • High electricity prices make on-site CHP for own use attractive; policy favours food waste over manure.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

boiler: local CAPEX factor
0.651 … 1.209 —
NPV low…high: -€860K … -€580K
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.054 … 0.084 —
NPV low…high: -€750K … -€680K
Mineral potassium price
0.713 … 0.8099 EUR/kg K₂O
NPV low…high: -€720K … -€720K
Mineral nitrogen price
1.045 … 1.818 EUR/kg N
NPV low…high: -€720K … -€720K
Mineral phosphorus price
1.419 … 1.847 EUR/kg P₂O₅
NPV low…high: -€720K … -€720K
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.6 EUR/Nm³ · CALCULATED_VALUE · LOW
National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
boiler: local CAPEX factor: 0.93 — · CALCULATED_VALUE · MEDIUM
0.72 traded equipment + 0.28 × local/German labour cost (23.5/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.049 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 7.67 EUR/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 3.08 EUR/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.064 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.74 % (Aa3; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Business electricity reference, excl. VAT (default if the customer gives none): 0.2937 EUR/kWh · CALCULATED_VALUE · MEDIUM
DESNZ Quarterly Energy Prices, table 3.4.1 (excl. CCL & VAT), medium non-domestic consumers, mean of 2025 Q3 – 2026 Q2 (24.5 p/kWh); converted at 0.8343 GBP/EUR (2026-11-09)
2026-06-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 0.245 GBP (ENGINEERING_ASSUMPTION); FX (2026-11-09): 0.8343 GBP/EUR (MARKET_DATA)
Wholesale electricity price (market average): 0.1026 EUR/kWh · CALCULATED_VALUE · MEDIUM
Ofgem wholesale market indicators: GB day-ahead baseload, monthly average weighted by volume (broker data), Jul 2025 – Jun 2026 mean £85.63/MWh; converted at 0.8343 GBP/EUR (2026-11-09)
2026-06-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
REVIEW_REQUIRED: Observation is 132 days old; exceeds the 60-day review policy
Documented nominal reference (may include estimated adders): 0.08563 GBP (ENGINEERING_ASSUMPTION); FX (2026-11-09): 0.8343 GBP/EUR (MARKET_DATA)
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 0.8343 GBP/EUR · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-09
2026-11-09 · checked 2026-11-10 · GBP per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Value of useful heat (displaced gas / boiler efficiency): 0.05957 EUR/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 53.61740381157857 €/MWh LHV ÷ 0.9
2026-06-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 40.3 GBP (ENGINEERING_ASSUMPTION); FX (2026-11-09): 0.8343 GBP/EUR (MARKET_DATA)
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 33.56 EUR/h · CALCULATED_VALUE · MEDIUM
ONS ASHE 2026 (provisional, Apr 2026): full-time median hourly pay £20.81 × 1.17 mean/median × 1.15 employer NI (15 %) and pension ≈ £28.0/h; converted at 0.8343 GBP/EUR (2026-11-09)
2026-04-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 28 GBP (ENGINEERING_ASSUMPTION); FX (2026-11-09): 0.8343 GBP/EUR (MARKET_DATA)
Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the bill actually avoided by self-generation: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
TOU reference: energy/Ft portion only, demand/service charges retained. Else 85% engineering allowance. User invoice uses the generic allowance until its energy/demand split is known.
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.131 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 1.07 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)