Sample report · Spain
Retail, wholesale markets & supermarket chains · Source-separated food waste: 12,000 t/yr
Business situation
A Barcelona-type wholesale food market collects unsold produce and organic waste from hundreds of traders and pays an external facility to treat it. Here the market company digests it on site and uses the power for its cold stores. Mercabarna reported about 30,000 t of commercial waste a year (2016).
Operating assumptions
- Source-separated food waste: 12,000 t/yr · DM: 14 % · 12 months · We pay for collection / disposal · What you pay for disposal: 55 EUR/t
- Electricity: 9,000,000 kWh/yr · Electricity price on your bill (if known): 0.133 EUR/kWh
- All year: hot water, steam, process · Heat needed per year (if known): 2,500,000 kWh/yr
- Land available for spreading digestate: 0 ha · Distance to the gas grid (for biomethane): 0.5 km
- Grid connection? Yes
What to verify
Confirm tonnage and composition by month, the current treatment contract, space and odour control on site, and the digestate outlet.
Strong candidate
Worth detailed work: the project holds up even under conservative assumptions.
- Simple payback ≈ 4.2 yrs (base) and ≈ 9.8 yrs in the conservative case; base NPV €4M; minimum DSCR 2.85.
Largest benefit — “avoided waste-disposal cost”: ≈ 63 % of all revenue and savings.
- → Confirm with a laboratory feedstock analysis (BMP) and real energy invoices.
Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.
How firm is this answer?
Robust: profitable even in the conservative case (lower gas yield, higher CAPEX, lower prices). The next step is worth paying for.
NPV: conservative €65K · base €4M · optimistic €5.6M
The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in > 99 % of cases.
- Feedstock potential −20 % (-€1.6M)
- Lab test of the methane yield (BMP) · CH₄ −20 % (-€750K)
- Get an offer for exported power (PPA or tariff) · Energy prices −20 % (-€750K)
These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.
To reach a bankable estimate (±15 %)
- Laboratory methane-potential (BMP) test of 2–3 feedstock samples — ≈ €300–800 each
- 2–3 supplier quotes for the plant
- Grid or gas-network connection conditions from the operator
- Letters of intent for feedstock supply and for heat, power or biomethane offtake
- Then a feasibility study with permits and financing (±15 %)
Key figures
Ranges: conservative — base — optimistic. We don't show fake precision.
Economics
Feedstock and energy
How far you can rely on these numbers
Medium · 75/100- Backed by your data and our sources75
- You can still add+15
- Needs a feasibility study (lab, quotes, contracts)10
75/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.
What you can add
- Biggest gainLaboratory DM, VS and BMP results for every feedstock streamLarge effectSend a sample to a laboratory: dry matter and VS take a few days, BMP several weeks+15
With all of it: up to 90/100
High requires verified laboratory and project documents, so a screening stops at 90/100.
- Animal by-products (Cat. 3) → pasteurisation and veterinary approval required.
- In this configuration the digestate is a cost rather than an asset.
- CHP performance uses a 50 Hz biogas full-load catalogue reference (03/2025), interpolated between ratings; part-load and ambient derating require supplier confirmation.
- 3,400–7,500 EUR/kW — Flexible plant, Germany · above rangeDBFZ / Fraunhofer IEE for BMWK (February 2024): €7,521 per kW rated (≈ €3,400 per kW installed) capacity · 2023 · Official study
- 2,800–7,000 EUR/kW — Agricultural plants, Poland · above rangePolish trade press 2023–2024 (PLN 7–20 m for 500 kW; PLN 12–16 m for 1 MW); IOŚ-PIB: ≈ PLN 30 m for 1 MW · 2023–2024 · Trade press
Market figures are mostly trade press and supplier estimates, not audited budgets. Real prices come from 3–5 supplier quotes.
- Pig-dense regions (Catalonia, Aragón) face nitrate pressure: digestate treatment can be as important as energy.
Action plan: what would make it stronger
Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.
- 1Ask 3–5 suppliers for quotes: the project breaks even up to an investment of €6M. →
What to verify first
Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.
| Check | NPV across the plausible range | Worth knowing |
|---|---|---|
| Get supplier quotes for the plant | €3M … €5M | — |
| Verify the market price | €3.1M … €4.5M | — |
| Check how your bill splits energy and capacity charges | €3.5M … €4.4M | — |
| Lab test of the methane yield (BMP) | €3.2M … €4M | — |
| Confirm a reliable heat buyer and demand | €3.7M … €4.2M | — |
How to check: Get supplier quotes for the plant
- Send the same request to at least three suppliers.
- Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request for quotation: turnkey biogas plant Site: Spain. Feedstock (screening values, to be confirmed): - source-separated food waste: 12,000 t/year, DM ≈ 14.0 % Design basis from the screening: raw biogas ≈ 130 Nm³/h at ≈ 60 % CH₄; digester working volume ≈ 1,200 m³; combined heat and power ≈ 320 kWe; new digestate storage ≈ 5,400 m³. Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.
Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology
How to check: Verify the market price
- Check the official source shown for this price in the market-data table and compare it with your own contract.
Then enter it in: Energy step: your own price, if you have a contract
How to check: Check how your bill splits energy and capacity charges
- Take the last 12 electricity invoices.
- Split each into the energy part (per kWh) and capacity, network and fixed charges; own generation saves mainly the energy part.
Then enter it in: Energy step: electricity price per kWh (energy part, excl. VAT)
How to check: Lab test of the methane yield (BMP)
- Take 3–5 subsamples of each stream over 2–4 weeks, mix them, keep them at 4 °C and deliver within 24 h.
- Order dry matter (DM), volatile solids (VS) and a methane potential test (BMP, VDI 4630) with the cellulose control reported.
- A valid test reports cellulose at 340–395 NL CH₄/kg VS; ask for a repeat otherwise.
Request for quotation: biogas potential analysis Site: Spain. Feedstock (screening values, to be confirmed): - source-separated food waste: 12,000 t/year, DM ≈ 14.0 % Design basis from the screening: raw biogas ≈ 130 Nm³/h at ≈ 60 % CH₄; digester working volume ≈ 1,200 m³; combined heat and power ≈ 320 kWe; new digestate storage ≈ 5,400 m³. Per sample please quote: dry matter (DM, % of fresh mass), volatile solids (VS, % of DM) and biochemical methane potential (BMP, NL CH₄ per kg VS) to VDI 4630, with the cellulose control result and the test duration. Please state price, turnaround time and sampling and shipping instructions.
Then enter it in: Feedstock step: DM, VS and BMP on each stream
How to check: Confirm a reliable heat buyer and demand
- Confirm the buyer's monthly heat demand and the temperature they need.
- Agree a price per kWh linked to their current fuel, and a term of at least the loan period.
Offer of renewable heat Site: Spain. A biogas plant can supply ≈ 2,300 MWh of heat a year (hot water, ≈ 80–90 °C) all year round. Please tell us your monthly heat use, the temperature you need, your current fuel and its price, and the price per kWh and term you would accept.
Then enter it in: Energy step: price the heat buyer pays per kWh
Break-even prices
Each value on its own brings the base-case NPV to zero; everything else stays as calculated.
Probability range (Monte Carlo)
160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.
No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.
What could break the economics
Each stress test applied to the base case on its own.
Change in NPV vs base, € (base: 4M)
- Feedstock potential −20 %-1.6M
- CH₄ −20 %-750K
- Energy prices −20 %-750K
- CAPEX +20 %-690K
- Useful heat (economic) −50 %-560K
- CHP downtime +10 pp-410K
- Maintenance +30 %-290K
- Feedstock transport +50 %0
Scenarios
Route: CHP (power + heat). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).
- Revenue + savings / yr€1M
- Avoided disposal cost630K
- Electricity self-consumption savings260K
- Useful heat (economic)110K
- OPEX / yr€330K
- Disposal of pre-treatment rejects120K
- Digestate handling70K
- Maintenance46K
- CHP service and overhaul reserve45K
- Operating margin (EBITDA)€670K
| Scenarios | Conservative | Base | Optimistic |
|---|---|---|---|
| Biogas, 1 000 Nm³/yr | 811.1 | 1,059.5 | 1,207.4 |
| CAPEX | €3.4M | €2.8M | €2.5M |
| OPEX / yr | €340K | €330K | €310K |
| Revenue + savings / yr | €690K | €1M | €1.1M |
| Operating margin (EBITDA) | €340K | €670K | €810K |
| Simple payback | 9.8 yr | 4.2 yr | 3.1 yr |
| Discounted payback | 14.6 yr | 5.3 yr | 3.9 yr |
| NPV | €65K | €4M | €5.6M |
| IRR | 7.2 % | 23.2 % | 31 % |
| DSCR (min) | 1.2 | 2.9 | 3.8 |
Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).
Biogas use routes compared
Base case. The model picks the route with the best NPV among technically sensible ones.
| Route | CAPEX | EBITDA / yr | Payback | NPV (base) | NPV low…high |
|---|---|---|---|---|---|
| CHP (power + heat) chosen | €2.8M | €670K | 4.2 yr | €4M | €65K … €5.6M |
| Boiler (heat only) | €2.2M | €450K | 4.9 yr | €2.4M | -€370K … €3.5M |
| Biomethane | €3.5M | €640K | 5.4 yr | €3M | -€1.4M … €5.9M |
- CHP pays when you use the power yourself and the heat is really used.
- Biomethane: raw biogas ≈ 123 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.
Plant size
The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.
| Size | t/yr | Best option | kWe | CAPEX | NPV (base) |
|---|---|---|---|---|---|
| × 0.5 | 6,000 | CHP (power + heat) | 150 | €1.7M | €1.5M |
| × 0.75 | 9,000 | CHP (power + heat) | 240 | €2.2M | €2.7M |
| × 1 your input | 12,000 | CHP (power + heat) | 320 | €2.8M | €4M |
| × 1.5 | 18,000 | CHP (power + heat) | 470 | €3.9M | €6M |
| × 2 | 24,000 | CHP (power + heat) | 670 | €5M | €8.3M |
| × 3 | 36,000 | Biomethane | 843 | €7.6M | €13M |
National support schemes — separate cases
Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.
There is no support for new projects that we could calculate — see the country overview
No support scheme for new projects is modelled for this country.
No open support: IDAE biogas grants have no active call, and a biomethane quota (0.5 % in 2028 → 6 % in 2035) is still a draft decree.
Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.
Where the energy goes
Heat produced ≠ useful heat. Heat without a user isn't income.
65/100
Of every 100 kWh of energy in the methane, 65 become a product that earns money or replaces a purchase.
100 % = 6,300 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.
Stream by stream
CalculatedEarns money
- Electricity used on site2,300 MWh 36 %
- Heat for a user1,800 MWh 29 %
Runs the plant
- Plant’s own electricity200 MWh 3 %
- Digester heating330 MWh 5 %
Produced, not used
- Heat with no buyer460 MWh 7 %
Losses
- Conversion losses (engine, boiler)1,100 MWh 18 %
- Methane leaks95 MWh 2 %
What this means for the project
- 460 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income. At the heat value used in this case that is about €28K a year.
- Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.
What the figures rest on
- Engine efficiency: electricity / heat
- 40 % / 46 %Assumption
- Heat need
- 2,500 MWhYour data
- Site electricity use
- 9,000 MWhYour data
- Methane leaks, base case
- 2 %Assumption
- Main product, conservative – optimistic
- 1,700 – 2,400 MWhCalculated
Season: how much the digester takes for itself
In January heating the digester needs heat equal to 7 % of that month’s methane energy, in July 4 %.
January: methane energy 530 MWh · digester heating 35 MWh (7 %) · heat for a user 150 MWh
- Methane energy of the month
- Digester heating
- Heat for a user
How it works: from feedstock to products
- Feedstock12,000 t/yr
- Biogas1.1M Nm³/yr
- Electricity2,300 MWh
- Useful heat1,800 MWh
- Heat without demand460 MWh
- Digestate11,000 t/yr
- Heat produced (gross)
- 2,619 MWh
- Digester heat demand
- 333 MWh
- Useful heat (economic)
- 1,828 MWh of 2,285
- Power: own use / sold
- 2,298 / 0 MWh
Climate case (EU RED method)
EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.
- Below the RED minimum: a gas-tight digestate store, off-gas combustion or more manure in the mix raise the saving.
- Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.
Scores by dimension
No single magic number. The overall score comes with its explanation.
- Energy equivalent ≈ 320 kWe (scale score 87/100)
- Feedstock energy ≈ 528 kWh of methane per tonne (score 71/100)
- Feedstock available 12 of 12 months
- Own consumption absorbs 100 % of the electricity produced
- Useful heat 1828 MWh of 2285 MWh available after digester needs
- Neighbours within 300 m: odour, traffic, safety distances
- Not enough land for the digestate
- ABP pasteurisation adds complexity
- Base-case simple payback ≈ 4.2 years
- NPV positive even in the conservative case
- Number and weight of permitting / regulatory steps: 12 points (more = harder)
- Expected methane loss 2.5 % (good practice ≤ 2 %)
- Neighbours within 300 m: odour and incident exposure
- Surplus digestate: risk of nitrogen over-application
- Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
- Strongest: Economics (98); weakest: Environmental risk (41).
Calculation details
Feedstock & logistics
| Stream | t/yr | DM, % | Nm³ CH₄/t | Logistics / energy | Max. distance |
|---|---|---|---|---|---|
| Source-separated food waste | 12,000 | 14 | 53 | on site | ≈ 128 km |
Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.
Technology & digester
Wet mesophilic digestion with solids feeding
CSTR with a solids feeder and recirculation, or horizontal plug-flow for dairy manure
- Working volume
- ≈ 1,200 m³
- Retention time
- 35.2 days
- Loading rate
- 3.5 kg VS/(m³·d)
- Digestate storage
- ≈ 5,400 m³
- Dry matter 14 % is above the pumpable limit without a solids feeder (12 %).
- Continuous feed — continuous operation gives steady gas and the simplest control.
- Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
- Two-stage layout (main + post-digester) for stability with fats or larger flows.
- Horizontal plug-flow (good for 10–14 % DM cattle manure)
- Separate pasteurisation (70 °C / 1 h) ahead of a mesophilic digester instead of thermophilic operation
Climate: Catalonia (Lleida), mean 17.6 °C, ≈ 1,202 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 7.5 °C), Prague (CZ) (Δ 7.7 °C), Copenhagen (DK) (Δ 8.2 °C).
Monthly energy balance
Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.
| Month | Feedstock, t | Gas energy, MWh | Digester heat, MWh | Useful heat, MWh | Net electricity, MWh |
|---|---|---|---|---|---|
| Jan | 1,018 | 530 | 35 | 150 | 195 |
| Feb | 928 | 483 | 30 | 138 | 178 |
| Mar | 1,018 | 530 | 31 | 153 | 195 |
| Apr | 986 | 513 | 28 | 150 | 189 |
| May | 1,018 | 530 | 26 | 157 | 195 |
| Jun | 986 | 513 | 23 | 153 | 189 |
| Jul | 1,018 | 530 | 23 | 159 | 195 |
| Aug | 1,018 | 530 | 23 | 159 | 195 |
| Sept | 986 | 513 | 24 | 153 | 189 |
| Oct | 1,018 | 530 | 27 | 156 | 195 |
| Nov | 986 | 513 | 30 | 148 | 189 |
| Dec | 1,018 | 530 | 34 | 151 | 195 |
| Σ | 12,000 | 6,243 | 333 | 1,828 | 2,298 |
CAPEX, OPEX, revenue (base case)
| Digester | 220K |
| New covered storage | 360K |
| New open storage | 100K |
| Feedstock reception and preparation | 610K |
| Pasteurisation (70 °C / 1 h) | 110K |
| Gas handling and cleaning | 40K |
| CHP (power + heat) | 510K |
| Heat network | 54K |
| Backup boiler | 2.4K |
| Electrical systems and controls | 120K |
| Pipework | 80K |
| Civil works | 120K |
| Grid connection | 34K |
| Engineering and permits | 190K |
| Contingency | 250K |
| Total | 2.8M |
| Staff | 26K |
| CHP service and overhaul reserve | 45K |
| Maintenance | 46K |
| Insurance | 14K |
| Testing and monitoring | 5K |
| Disposal of pre-treatment rejects | 120K |
| Digestate handling | 70K |
| Total | 330K |
| Electricity self-consumption savings | 260K |
| Useful heat (economic) | 110K |
| Avoided disposal cost | 630K |
| Total | 1M |
Unit costs are estimates. Replace them with supplier quotations.
Digestate: asset or liability
Status: liability / cost · 10,706 t/yr · nitrogen ≈ 50,782 kg/yr · land needed ≈ 299 ha (available 0 ha).
Incremental fertiliser value €0/yr, handling €70K/yr, net -€70K/yr.
- Not enough land: ≈ 299 ha needed at 170 kg N/ha. Surplus digestate is a cost (agreements with neighbours, separation, pelletising).
- Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
- Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate
Expected losses: 2.5 % of methane produced (range 1.6 % – 4 %) ≈ 306 t CO₂e/yr; fossil emissions displaced ≈ 723 t CO₂/yr. Losses vs benefit: 42 %.
- Expected loss 2.5 % is above good practice (2 %): budget for monitoring.
- Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
- Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
- Continuous gas-holder pressure monitoring; a standby flare instead of venting.
- CHP with an oxidation catalyst and tuning regime to cut methane slip.
Avoided emissions from open manure storage are not credited (conservative).
Permits & regulation (indicative)
Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.
- Building permit and environmental permit; EIA screening (Directive 2011/92/EU as transposed)New installation · effort: medium · to verify
- Nitrates Directive (91/676/EEC): 170 kg N/ha from organic manures in vulnerable zones; closed spreading periodsDigestate is spread on land · effort: medium · confirmed
- ATEX hazardous-area zoning (Directives 2014/34/EU, 1999/92/EC)Methane in the gas phase · effort: medium · confirmed
- Animal by-products approval: pasteurisation 70 °C / 1 h (Cat. 3) or pressure sterilisation (Cat. 2), veterinary registrationSlaughter / dairy / food residues in the feed · effort: high · to verify
- Setback distances, odour assessment and community consultationHousing within 300 m · effort: high · to verify
Safety (risk register)
- Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
- Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
- Fixed gas detectors in the CHP room and near tanks
- Flame arresters, over/under-pressure relief, safety flare
- Ignition-source control and hot-work permits
- Hydrogen sulphide (H₂S): acute toxicity, corrosion high
- Biological / chemical desulphurisation of the biogas
- Personal H₂S monitors, no lone working
- H₂S monitoring upstream of the CHP (engine protection)
- Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
- Entry only under permit, ventilation, standby person
- Self-contained breathing apparatus for rescue
- Over/under-pressure: membrane roof rupture, tank deformation medium
- Liquid seals / relief valves venting to a safe location
- Gas-holder level and pressure sensors
- CHP: carbon monoxide, fire, high temperatures medium
- CHP room ventilation, CO detectors
- Emergency stop, fire suppression
- Biological hazards: pathogens in animal by-products and food waste highCondition: Animal by-products / food waste in the mix
- Pasteurisation 70 °C / 1 h (Cat. 3) with time–temperature control
- Separate dirty and clean zones, vehicle disinfection
- Veterinary supervision and traceability
- Soil and water pollution: slurry/digestate spills, lagoon overflow high
- Bund sized for the largest tank
- Level sensors and a spill-response plan
- Digestate storage covering the closed spreading season
- Odour and noise for neighbours; blast exposure mediumCondition: Housing within 300 m
- Enclosed reception and storage, injection spreading
- Community consultation before design; consequence assessment
Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.
Assumptions used (163)
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →
- Support: No open support: IDAE biogas grants have no active call, and a biomethane quota (0.5 % in 2028 → 6 % in 2035) is still a draft decree.
- Pig-dense regions (Catalonia, Aragón) face nitrate pressure: digestate treatment can be as important as energy.
- The verdict excludes subsidies; national support is shown as separate cases.
- This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
- Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
- Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.
What could break the economics
Each stress test applied to the base case on its own.
- chp: local CAPEX factor
- 0.616 … 1.144 —
- NPV low…high: €3M … €5M
- Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
- 0.059 … 0.089 —
- NPV low…high: €3.1M … €4.5M
- Avoidable share of an unsplit customer electricity bill
- 0.7 … 1 —
- NPV low…high: €3.5M … €4.4M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
- Biomethane price without support, base: 0.6925 EUR/Nm³ · CALCULATED_VALUE · LOW
- CALCULATION: TTF 46.49 €/MWh HHV × 1.11 HHV/LHV + 20 €/MWh LHV green-gas premium (engineering assumption, no official GO price); World Bank Pink Sheet (2026-10-02), Natural gas Europe (TTF), mean Q4 2025 – Q3 2026 15.25 $/mmbtu GCV ÷ 0.2931 MWh/mmbtu at 1.1193 USD/EUR; × 9.6709 kWh LHV/Nm³. No guaranteed offtake or certificate eligibility.
- 2025-10 / 2026-09 · checked 2026-11-11 · Grid-injected biomethane, HHV prices converted to LHV; without feed-in tariffs, quotas or tax relief
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- chp: local CAPEX factor: 0.88 — · CALCULATED_VALUE · MEDIUM
- 0.72 traded equipment + 0.28 × local/German labour cost (18.5/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Debt interest rate (EUR-equivalent): 0.054 — · CALCULATED_VALUE · MEDIUM
- Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
- Typical agri / project lending (KfW, EBRD, IFC practice)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
- Typical
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Digestate that has no adequate land: 6.57 EUR/t · CALCULATED_VALUE · MEDIUM
- Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Incremental digestate handling on adequate land: 2.68 EUR/t · CALCULATED_VALUE · MEDIUM
- Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.069 — · CALCULATED_VALUE · MEDIUM
- Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 1.48 % (A3; Damodaran, 2026-07); not a bank offer
- 2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Wholesale electricity price (market average): 0.07351 EUR/kWh · MARKET_DATA · HIGH
- ENTSO-E day-ahead (via Energy-Charts), zone ES, average 73.5 €/MWh, 2025-10-01 – 2026-10-01
- 2025-10-01 / 2026-10-01 · checked 2026-10-31 · Wholesale bidding zone ES; not a guaranteed export PPA
- WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
- Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
- At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
- 15 % profile & balancing discount for a small seller (assumption, same for all markets)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
- World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
- 2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
- Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
- World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
- 2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
- Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
- World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
- 2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
- Exchange rate: 1 EUR/EUR · MARKET_DATA · HIGH
- Euro
- CONSTANT: EUR reporting currency; no currency conversion
- Value of useful heat (displaced gas / boiler efficiency): 0.0608 EUR/kWh th · CALCULATED_VALUE · MEDIUM
- Business gas 54.723 €/MWh LHV ÷ 0.9
- 2026-S1 · checked 2026-10-31 · GJ10000-99999; reference band, customer gas use unknown
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
- Shorter than the 20-year technical life — conservative
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Official hourly labour cost, economy-wide (wages + employer costs): 26.4 EUR/h · MARKET_DATA · HIGH
- Eurostat lc_lci_lev: hourly labour cost (wages + employer costs), industry, construction & services, 2025
- WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
- Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
- Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
- Inflation target + 0.5 pp wage drift
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Road transport of organic feedstock: 0.115 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
- 0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Loading/unloading per tonne: 0.97 EUR/t · CALCULATED_VALUE · MEDIUM
- 0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
- Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Customer electricity price (invoice split not verified): 0.133 EUR/kWh · USER_INPUT · MEDIUM
- USER_INPUT 0.133 EUR/kWh / FX 1; Euro. Invoice date not supplied; energy/demand split assumed separately.
- REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
- food_waste: dry matter: 14 % FM · MEASURED · MEDIUM
- MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
- REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified