Sample report · Spain

Olive-oil mill · Olive pomace (two-phase): 120,000 t/yr

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

A Córdoba plant takes two-phase olive pomace (alperujo) from cooperative mills, stores it in ponds and digests it year-round, injecting biomethane. Andalusian projects of this type are now in permitting.

Operating assumptions

  • Olive pomace (two-phase): 120,000 t/yr · DM: 30 % · 12 months · Other / don't know · Delivered from another site: 25 km · Purchase price / gate fee: 0 EUR/t
  • Electricity: 1,500,000 kWh/yr · Electricity price on your bill (if known): 0.133 EUR/kWh
  • No heat needed
  • Land available for spreading digestate: 2,500 ha · Distance to the gas grid (for biomethane): 3 km
  • Grid connection? Yes

What to verify

Get BMP and inhibition tests of the pomace, supply agreements with the mills, the grid-injection point and the environmental permit.

Possible with conditions

It can pay off, but only if the key conditions hold — confirm them in a feasibility study.

  • Base NPV positive (€17M), payback ≈ 4.4 yrs.
  • Conservative-case NPV is negative (-€8M) — sensitive to key assumptions.
  • Olive pomace is 100 % of the organic matter — above the ≈ 65 % at which continuous digestion with manure stayed stable; the economics cannot be called strong without a continuous pilot.

Largest benefit — “biomethane sales”: ≈ 91 % of all revenue and savings.

What would change the verdict
  • → Secure long-term heat and power offtake; benchmark CAPEX with 3–5 suppliers.
  • → Co-digest the pomace with manure (pomace ≤ 65 % of VS) or run a continuous pilot test.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

Grey zone: the answer flips between the conservative and the optimistic case. Before paying for a feasibility study, check these first:

NPV: conservative -€8M · base €17M · optimistic €44M

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in > 99 % of cases.

  1. CH₄ −20 % · Already entered (-€9.2M)
  2. Secure the feedstock supply in writing · Feedstock potential −20 % (-€8.6M)
  3. Get a biomethane offtake offer · Energy prices −20 % (-€8.6M)

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

To reach a bankable estimate (±15 %)
  1. Laboratory methane-potential (BMP) test of 2–3 feedstock samples — ≈ €300–800 each · Already entered
  2. 2–3 supplier quotes for the plant
  3. Grid or gas-network connection conditions from the operator
  4. Letters of intent for feedstock supply and for heat, power or biomethane offtake
  5. Then a feasibility study with permits and financing (±15 %)
From screening to construction

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€13M – €17M
Payback
2.2 yr – 16.9 yr
base: 4.4 yr · no subsidies
NPV (base)
€17M
range: -€8M … €44M
Chosen route
Biomethane
Confidence: Medium

Feedstock and energy

Feedstock potential
120,000 t/yr
energy ≈ 632 kWh CH₄/t
Biogas
10M – 14M Nm³/yr
≈ 1,584 Nm³/h (base)
Net energy
5.6M – 8M Nm³/yr
biomethane / year
Candidate capacity
3,400 kWe
large (1–5 MW)

How far you can rely on these numbers

Medium · 84/100
  • Backed by your data and our sources84
  • You can still add+6
  • Needs a feasibility study (lab, quotes, contracts)10

84/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainAt least one price affecting this route relies on an unconfirmed market proxy or uncontracted offtake — confirm the applicable tariff or buyer contract+6

With all of it: up to 90/100

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • "two-phase olive pomace (alperujo)": phenols and low alkalinity limit digestion. Alperujo alone collapsed in a semi-continuous test (53 instead of 284 L CH₄/kg VS), while 65 % alperujo with 35 % pig manure (by VS) held its BMP at a low loading rate; polyphenols in the digester inhibit methane formation from about 0.6 g/L (published up to 2 g/L). Plan co-digestion with manure, measure total phenols and run a continuous pilot before relying on the result.
Country conditions
  • Pig-dense regions (Catalonia, Aragón) face nitrate pressure: digestate treatment can be as important as energy.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Strong candidate”
  • Olive pomace is 100 % of the organic matter; stable continuous digestion with manure is proven only up to about 65 %.
  • The conservative case must stay profitable too (its NPV is -€8M).
Order of action
  1. 1Ask 3–5 suppliers for quotes: the project breaks even up to an investment of €27M. →

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Get a biomethane offtake offer€6.8M … €35M—
Secure the feedstock supply in writing€4.5M … €17M—
Get supplier quotes for the plant€12M … €23M—
Verify the market price€13M … €20M—
Check the fertiliser value of the digestate€17M … €18M—
How to check: Get a biomethane offtake offer
  1. Ask two or three biomethane traders or gas suppliers for an offer without state support.
  2. Ask the gas grid operator for the injection point, pressure and connection cost.
Request to send
Request for a biomethane offtake offer
Site: Spain. Expected output ≈ 840 Nm³/h, ≈ 79,000 MWh (HHV) a year; ≈ 0 % of organic matter from manure (relevant for certification). Please offer a price per MWh (HHV) without state support, indexation, term, and say whether guarantees of origin or sustainability certificates are included or paid extra.

Then enter it in: Energy step: biomethane price offered by a buyer

How to check: Secure the feedstock supply in writing
  1. List every stream you do not produce yourself: supplier, tonnes per month, season and contract term.
  2. Get letters of intent or contracts for at least the loan period, and size the plant on the tonnage that is signed, not promised.
Request to send
Request for a feedstock supply agreement
Site: Spain. A biogas plant would take:
- two-phase olive pomace (alperujo): 120,000 t/year, DM ≈ 30.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Spain.
Feedstock (screening values, to be confirmed):
- two-phase olive pomace (alperujo): 120,000 t/year, DM ≈ 30.0 %
Design basis from the screening: raw biogas ≈ 1,500 Nm³/h at ≈ 60 % CH₄; digester working volume ≈ 25,000 m³; membrane upgrading ≈ 840 Nm³/h biomethane (≈ 1,500 Nm³/h raw gas); new digestate storage ≈ 26,000 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Biomethane price at NPV = 0
€0.458/Nm³€42.6/MWh HHV
now €0.692/Nm³ · €64.5/MWh HHV
Highest installed cost at NPV = 0
€27M
now €14M
Feedstock price headroom
€13.6/t
can pay up to €13.6 per tonne more for every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
€8.1M
Median NPV
€16M
NPV P90 (1 in 10 better)
€24M
Chance that NPV > 0
> 99 %
Median payback
4.6 yr

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: 17M)

  1. CH₄ −20 %-9.2M
  2. Feedstock potential −20 %-8.6M
  3. Energy prices −20 %-8.6M
  4. CAPEX +20 %-3.7M
  5. Feedstock transport +50 %-2.5M
  6. Maintenance +30 %-1.1M
  7. Useful heat (economic) −50 %0
  8. CHP downtime +10 pp0
NPV = 0 if CAPEX falls by
already positive
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
already positive
relative to the base case

Scenarios

Route: Biomethane. Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€5.6M
  • Biomethane5.1M
  • Incremental digestate value490K
OPEX / yr€2.3M
  • Purchased electricity790K
  • Feedstock transport460K
  • Digestate handling280K
  • Certification and balancing220K
Operating margin (EBITDA)€3.2M
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr9,967.812,67213,685.8
CAPEX€17M€14M€13M
OPEX / yr€2.4M€2.3M€2.3M
Revenue + savings / yr€3.4M€5.6M€8M
Operating margin (EBITDA)€1M€3.2M€5.8M
Simple payback16.9 yr4.4 yr2.2 yr
Discounted paybackno payback5.7 yr2.8 yr
NPV-€8M€17M€44M
IRR-1.2 %21.4 %42.4 %
DSCR (min)0.72.75.4

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).

Cumulative cash flow, €
-23M5.2M33M62M90M03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) €13M€950K13.9 yr-€4.3M-€15M … €1.7M
Boiler (heat only) €9.3M-€960Kno payback-€20M-€24M … -€17M
Biomethane chosen€14M€3.2M4.4 yr€17M-€8M … €44M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 1,493 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 60,000Biomethane1,680€8.5M€7.1M
× 0.75 90,000Biomethane2,520€11M€12M
× 1 your input120,000Biomethane3,360€14M€17M
× 1.5 180,000Biomethane5,040€20M€23M
× 2 240,000Biomethane6,720€25M€28M
× 3 360,000Biomethane10,080€35M€37M

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

There is no support for new projects that we could calculate — see the country overview

No support scheme for new projects is modelled for this country.

Country overviewchecked 30 Oct 2026

No open support: IDAE biogas grants have no active call, and a biomethane quota (0.5 % in 2028 → 6 % in 2035) is still a draft decree.

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

94/100

Of every 100 kWh of energy in the methane, 94 become a product that earns money or replaces a purchase.

100 % = 76,000 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Biomethane71,000 MWh 94 %

Runs the plant

  • Digester heating2,900 MWh 4 %

Losses

  • Conversion losses (engine, boiler)320 MWh 0.4 %
  • Methane slip in upgrading500 MWh 0.7 %
  • Methane leaks1,100 MWh 2 %

What this means for the project

  • The plant buys 6,000 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
5.6M – 8M Nm³Calculated

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 5 % of that month’s methane energy, in July 3 %.

January: methane energy 6,300 MWh · digester heating 310 MWh (5 %) · heat for a user 0 MWh

  • Methane energy of the month
  • Digester heating

How it works: from feedstock to products

  1. Feedstock120,000 t/yr
  2. Biogas13M Nm³/yr
  3. Gas to grid7.3M Nm³
  4. Useful heat0 MWh
  5. Digestate100,000 t/yr
Heat produced (gross)
2,882 MWh
Digester heat demand
2,882 MWh
Useful heat (economic)
0 MWh of 0
Power: own use / sold
0 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
71 g CO₂e/MJ
open digestate storage
Fossil comparator
94 g CO₂e/MJ
Greenhouse-gas saving
24 %
RED minimum: 65 %
Avoided emissions
5,876 t CO₂e
  • Below the RED minimum: a gas-tight digestate store, off-gas combustion or more manure in the mix raise the saving.
  • RED sustainability criteria apply (rated input ≥ 2 MW).
  • Residues other than manure, maize and food waste use the RED biowaste values.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
95/100
  • Energy equivalent ≈ 3360 kWe (scale score 100/100)
  • Feedstock energy ≈ 632 kWh of methane per tonne (score 77/100)
  • Feedstock available 12 of 12 months
Energy fit
87/100
  • Biomethane: raw biogas ≈ 1493 Nm³/h (EU average plant ≈ 483 Nm³/h)
  • ≈ 3 km to the gas grid
Location & logistics
100/100
  • No critical site constraints found from your answers
Technical feasibility
95/100
  • Dry digestion — fewer suppliers
Economics
92/100
  • Base-case simple payback ≈ 4.4 years
Regulatory complexity
41/100 risk
  • Number and weight of permitting / regulatory steps: 14 points (more = harder)
Environmental risk
21/100 risk
  • Expected methane loss 2.2 % (good practice ≤ 2 %)
Overall project viability
89/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Location & logistics (100); weakest: Regulatory complexity (59).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Olive pomace (two-phase)delivered 25 km120,0003063.49 %≈ 178 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Dry (high-solids) digestion, mesophilic

Garage (box) batch digesters with percolate recirculation, or horizontal plug-flow

Working volume
≈ 25,000 m³
Retention time
75.4 days
Loading rate
3.5 kg VS/(m³·d)
Digestate storage
≈ 26,000 m³
  • Average mix dry matter 30 % ≥ 22 %: wet digestion would need dilution, increasing volume and heat losses.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Two-stage layout (main + post-digester) for stability with fats or larger flows.
Alternatives
  • Wet digestion diluted with slurry/effluent — cheaper equipment, larger digester

Climate: Andalusia (Córdoba), mean 20.2 °C, ≈ 752 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 10.2 °C), Prague (CZ) (Δ 10.4 °C), Copenhagen (DK) (Δ 10.8 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan10,1856,33731200
Feb9,2815,77527000
Mar10,1856,33728400
Apr9,8566,13325300
May10,1856,33722900
Jun9,8566,13318800
Jul10,1856,33716800
Aug10,1856,33716800
Sept9,8566,13319600
Oct10,1856,33723600
Nov9,8566,13327400
Dec10,1856,33730400
Σ120,00074,6672,88200
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester3.2M
New covered storage2.3M
New open storage250K
Feedstock reception and preparation140K
Gas handling and cleaning180K
Upgrading3.4M
Gas-grid injection310K
Gas pipeline530K
Boiler (heat only)52K
Electrical systems and controls620K
Pipework410K
Civil works620K
Grid connection8.8K
Engineering and permits950K
Contingency1.3M
Total14M
OPEX / yr (EUR)
Staff140K
Maintenance220K
Maintenance (Upgrading)130K
Insurance71K
Testing and monitoring5K
Feedstock transport460K
Digestate handling280K
Purchased electricity790K
Certification and balancing220K
Total2.3M
Revenue + savings / yr (EUR)
Biomethane5.1M
Incremental digestate value490K
Total5.6M

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: asset · 104,527 t/yr · nitrogen ≈ 399,000 kg/yr · land needed ≈ 2,347 ha (available 2,500 ha).

Incremental fertiliser value €490K/yr, handling €280K/yr, net €210K/yr.

  • Digestate storage for 3 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 2.2 % of methane produced (range 1.2 % – 3.6 %) ≈ 3,179 t CO₂e/yr; fossil emissions displaced ≈ 14,335 t CO₂/yr. Losses vs benefit: 22 %.

  • Expected loss 2.2 % is above good practice (2 %): budget for monitoring.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: medium. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Building permit and environmental permit; EIA screening (Directive 2011/92/EU as transposed)
    New installation · effort: medium · to verify
  • Industrial Emissions Directive (2010/75/EU) permit — anaerobic digestion of waste above ~100 t/day
    Throughput above the IED threshold · effort: high · to verify
  • Nitrates Directive (91/676/EEC): 170 kg N/ha from organic manures in vulnerable zones; closed spreading periods
    Digestate is spread on land · effort: medium · confirmed
  • ATEX hazardous-area zoning (Directives 2014/34/EU, 1999/92/EC)
    Methane in the gas phase · effort: medium · confirmed
  • RED III sustainability & GHG certification (e.g. ISCC EU / REDcert) and Guarantees of Origin for biomethane
    Biomethane is sold as a renewable product · effort: medium · confirmed
  • Gas-grid injection: connection request, gas-quality specification, metering (TSO/DSO)
    Grid injection · effort: high · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (162)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: No open support: IDAE biogas grants have no active call, and a biomethane quota (0.5 % in 2028 → 6 % in 2035) is still a draft decree.
  • Pig-dense regions (Catalonia, Aragón) face nitrate pressure: digestate treatment can be as important as energy.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

biomethane: local CAPEX factor
0.616 … 1.144 —
NPV low…high: €12M … €23M
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.059 … 0.089 —
NPV low…high: €13M … €20M
Mineral potassium price
0.713 … 0.8099 EUR/kg K₂O
NPV low…high: €17M … €18M
Mineral nitrogen price
1.045 … 1.818 EUR/kg N
NPV low…high: €17M … €18M
Mineral phosphorus price
1.419 … 1.847 EUR/kg P₂O₅
NPV low…high: €17M … €17M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.6925 EUR/Nm³ · CALCULATED_VALUE · LOW
CALCULATION: TTF 46.49 €/MWh HHV × 1.11 HHV/LHV + 20 €/MWh LHV green-gas premium (engineering assumption, no official GO price); World Bank Pink Sheet (2026-10-02), Natural gas Europe (TTF), mean Q4 2025 – Q3 2026 15.25 $/mmbtu GCV ÷ 0.2931 MWh/mmbtu at 1.1193 USD/EUR; × 9.6709 kWh LHV/Nm³. No guaranteed offtake or certificate eligibility.
2025-10 / 2026-09 · checked 2026-11-11 · Grid-injected biomethane, HHV prices converted to LHV; without feed-in tariffs, quotas or tax relief
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
biomethane: local CAPEX factor: 0.88 — · CALCULATED_VALUE · MEDIUM
0.72 traded equipment + 0.28 × local/German labour cost (18.5/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.054 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 6.57 EUR/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 2.68 EUR/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.069 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 1.48 % (A3; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.07351 EUR/kWh · MARKET_DATA · HIGH
ENTSO-E day-ahead (via Energy-Charts), zone ES, average 73.5 €/MWh, 2025-10-01 – 2026-10-01
2025-10-01 / 2026-10-01 · checked 2026-10-31 · Wholesale bidding zone ES; not a guaranteed export PPA
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 1 EUR/EUR · MARKET_DATA · HIGH
Euro
CONSTANT: EUR reporting currency; no currency conversion
Value of useful heat (displaced gas / boiler efficiency): 0.0608 EUR/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 54.723 €/MWh LHV ÷ 0.9
2026-S1 · checked 2026-10-31 · GJ10000-99999; reference band, customer gas use unknown
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 26.4 EUR/h · MARKET_DATA · HIGH
Eurostat lc_lci_lev: hourly labour cost (wages + employer costs), industry, construction & services, 2025
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.115 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 0.97 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.133 EUR/kWh · USER_INPUT · MEDIUM
USER_INPUT 0.133 EUR/kWh / FX 1; Euro. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
olive_pomace: dry matter: 30 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
olive_pomace: volatile solids: 88 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
olive_pomace: BMP (scenarios ± inter-laboratory spread): 240 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified