Sample report · Spain
Olive-oil mill · Olive pomace (two-phase): 120,000 t/yr
Business situation
A Córdoba plant takes two-phase olive pomace (alperujo) from cooperative mills, stores it in ponds and digests it year-round, injecting biomethane. Andalusian projects of this type are now in permitting.
Operating assumptions
- Olive pomace (two-phase): 120,000 t/yr · DM: 30 % · 12 months · Other / don't know · Delivered from another site: 25 km · Purchase price / gate fee: 0 EUR/t
- Electricity: 1,500,000 kWh/yr · Electricity price on your bill (if known): 0.133 EUR/kWh
- No heat needed
- Land available for spreading digestate: 2,500 ha · Distance to the gas grid (for biomethane): 3 km
- Grid connection? Yes
What to verify
Get BMP and inhibition tests of the pomace, supply agreements with the mills, the grid-injection point and the environmental permit.
Possible with conditions
It can pay off, but only if the key conditions hold — confirm them in a feasibility study.
- Base NPV positive (€17M), payback ≈ 4.4 yrs.
- Conservative-case NPV is negative (-€8M) — sensitive to key assumptions.
- Olive pomace is 100 % of the organic matter — above the ≈ 65 % at which continuous digestion with manure stayed stable; the economics cannot be called strong without a continuous pilot.
Largest benefit — “biomethane sales”: ≈ 91 % of all revenue and savings.
- → Secure long-term heat and power offtake; benchmark CAPEX with 3–5 suppliers.
- → Co-digest the pomace with manure (pomace ≤ 65 % of VS) or run a continuous pilot test.
Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.
How firm is this answer?
Grey zone: the answer flips between the conservative and the optimistic case. Before paying for a feasibility study, check these first:
NPV: conservative -€8M · base €17M · optimistic €44M
The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in > 99 % of cases.
- CH₄ −20 % · Already entered (-€9.2M)
- Secure the feedstock supply in writing · Feedstock potential −20 % (-€8.6M)
- Get a biomethane offtake offer · Energy prices −20 % (-€8.6M)
These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.
To reach a bankable estimate (±15 %)
- Laboratory methane-potential (BMP) test of 2–3 feedstock samples — ≈ €300–800 each · Already entered
- 2–3 supplier quotes for the plant
- Grid or gas-network connection conditions from the operator
- Letters of intent for feedstock supply and for heat, power or biomethane offtake
- Then a feasibility study with permits and financing (±15 %)
Key figures
Ranges: conservative — base — optimistic. We don't show fake precision.
Economics
Feedstock and energy
How far you can rely on these numbers
Medium · 84/100- Backed by your data and our sources84
- You can still add+6
- Needs a feasibility study (lab, quotes, contracts)10
84/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.
What you can add
- Biggest gainAt least one price affecting this route relies on an unconfirmed market proxy or uncontracted offtake — confirm the applicable tariff or buyer contract+6
With all of it: up to 90/100
High requires verified laboratory and project documents, so a screening stops at 90/100.
- "two-phase olive pomace (alperujo)": phenols and low alkalinity limit digestion. Alperujo alone collapsed in a semi-continuous test (53 instead of 284 L CH₄/kg VS), while 65 % alperujo with 35 % pig manure (by VS) held its BMP at a low loading rate; polyphenols in the digester inhibit methane formation from about 0.6 g/L (published up to 2 g/L). Plan co-digestion with manure, measure total phenols and run a continuous pilot before relying on the result.
- Pig-dense regions (Catalonia, Aragón) face nitrate pressure: digestate treatment can be as important as energy.
Action plan: what would make it stronger
Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.
- Olive pomace is 100 % of the organic matter; stable continuous digestion with manure is proven only up to about 65 %.
- The conservative case must stay profitable too (its NPV is -€8M).
- 1Ask 3–5 suppliers for quotes: the project breaks even up to an investment of €27M. →
What to verify first
Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.
| Check | NPV across the plausible range | Worth knowing |
|---|---|---|
| Get a biomethane offtake offer | €6.8M … €35M | — |
| Secure the feedstock supply in writing | €4.5M … €17M | — |
| Get supplier quotes for the plant | €12M … €23M | — |
| Verify the market price | €13M … €20M | — |
| Check the fertiliser value of the digestate | €17M … €18M | — |
How to check: Get a biomethane offtake offer
- Ask two or three biomethane traders or gas suppliers for an offer without state support.
- Ask the gas grid operator for the injection point, pressure and connection cost.
Request for a biomethane offtake offer Site: Spain. Expected output ≈ 840 Nm³/h, ≈ 79,000 MWh (HHV) a year; ≈ 0 % of organic matter from manure (relevant for certification). Please offer a price per MWh (HHV) without state support, indexation, term, and say whether guarantees of origin or sustainability certificates are included or paid extra.
Then enter it in: Energy step: biomethane price offered by a buyer
How to check: Secure the feedstock supply in writing
- List every stream you do not produce yourself: supplier, tonnes per month, season and contract term.
- Get letters of intent or contracts for at least the loan period, and size the plant on the tonnage that is signed, not promised.
Request for a feedstock supply agreement Site: Spain. A biogas plant would take: - two-phase olive pomace (alperujo): 120,000 t/year, DM ≈ 30.0 % Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.
Then enter it in: Feedstock step: quantity and price of each delivered stream
How to check: Get supplier quotes for the plant
- Send the same request to at least three suppliers.
- Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request for quotation: turnkey biogas plant Site: Spain. Feedstock (screening values, to be confirmed): - two-phase olive pomace (alperujo): 120,000 t/year, DM ≈ 30.0 % Design basis from the screening: raw biogas ≈ 1,500 Nm³/h at ≈ 60 % CH₄; digester working volume ≈ 25,000 m³; membrane upgrading ≈ 840 Nm³/h biomethane (≈ 1,500 Nm³/h raw gas); new digestate storage ≈ 26,000 m³. Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.
Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology
How to check: Verify the market price
- Check the official source shown for this price in the market-data table and compare it with your own contract.
Then enter it in: Energy step: your own price, if you have a contract
How to check: Check the fertiliser value of the digestate
- Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
- Check the land available for spreading against the nitrogen limit.
Then enter it in: Site step: land available for digestate
Break-even prices
Each value on its own brings the base-case NPV to zero; everything else stays as calculated.
Probability range (Monte Carlo)
160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.
No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.
What could break the economics
Each stress test applied to the base case on its own.
Change in NPV vs base, € (base: 17M)
- CH₄ −20 %-9.2M
- Feedstock potential −20 %-8.6M
- Energy prices −20 %-8.6M
- CAPEX +20 %-3.7M
- Feedstock transport +50 %-2.5M
- Maintenance +30 %-1.1M
- Useful heat (economic) −50 %0
- CHP downtime +10 pp0
Scenarios
Route: Biomethane. Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).
- Revenue + savings / yr€5.6M
- Biomethane5.1M
- Incremental digestate value490K
- OPEX / yr€2.3M
- Purchased electricity790K
- Feedstock transport460K
- Digestate handling280K
- Certification and balancing220K
- Operating margin (EBITDA)€3.2M
| Scenarios | Conservative | Base | Optimistic |
|---|---|---|---|
| Biogas, 1 000 Nm³/yr | 9,967.8 | 12,672 | 13,685.8 |
| CAPEX | €17M | €14M | €13M |
| OPEX / yr | €2.4M | €2.3M | €2.3M |
| Revenue + savings / yr | €3.4M | €5.6M | €8M |
| Operating margin (EBITDA) | €1M | €3.2M | €5.8M |
| Simple payback | 16.9 yr | 4.4 yr | 2.2 yr |
| Discounted payback | no payback | 5.7 yr | 2.8 yr |
| NPV | -€8M | €17M | €44M |
| IRR | -1.2 % | 21.4 % | 42.4 % |
| DSCR (min) | 0.7 | 2.7 | 5.4 |
Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).
Biogas use routes compared
Base case. The model picks the route with the best NPV among technically sensible ones.
| Route | CAPEX | EBITDA / yr | Payback | NPV (base) | NPV low…high |
|---|---|---|---|---|---|
| CHP (power + heat) | €13M | €950K | 13.9 yr | -€4.3M | -€15M … €1.7M |
| Boiler (heat only) | €9.3M | -€960K | no payback | -€20M | -€24M … -€17M |
| Biomethane chosen | €14M | €3.2M | 4.4 yr | €17M | -€8M … €44M |
- CHP pays when you use the power yourself and the heat is really used.
- Biomethane: raw biogas ≈ 1,493 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.
Plant size
The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.
| Size | t/yr | Best option | kWe | CAPEX | NPV (base) |
|---|---|---|---|---|---|
| × 0.5 | 60,000 | Biomethane | 1,680 | €8.5M | €7.1M |
| × 0.75 | 90,000 | Biomethane | 2,520 | €11M | €12M |
| × 1 your input | 120,000 | Biomethane | 3,360 | €14M | €17M |
| × 1.5 | 180,000 | Biomethane | 5,040 | €20M | €23M |
| × 2 | 240,000 | Biomethane | 6,720 | €25M | €28M |
| × 3 | 360,000 | Biomethane | 10,080 | €35M | €37M |
National support schemes — separate cases
Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.
There is no support for new projects that we could calculate — see the country overview
No support scheme for new projects is modelled for this country.
No open support: IDAE biogas grants have no active call, and a biomethane quota (0.5 % in 2028 → 6 % in 2035) is still a draft decree.
Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.
Where the energy goes
Heat produced ≠ useful heat. Heat without a user isn't income.
94/100
Of every 100 kWh of energy in the methane, 94 become a product that earns money or replaces a purchase.
100 % = 76,000 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.
Stream by stream
CalculatedEarns money
- Biomethane71,000 MWh 94 %
Runs the plant
- Digester heating2,900 MWh 4 %
Losses
- Conversion losses (engine, boiler)320 MWh 0.4 %
- Methane slip in upgrading500 MWh 0.7 %
- Methane leaks1,100 MWh 2 %
What this means for the project
- The plant buys 6,000 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
- Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.
What the figures rest on
- Methane leaks, base case
- 2 %Assumption
- Main product, conservative – optimistic
- 5.6M – 8M Nm³Calculated
Season: how much the digester takes for itself
In January heating the digester needs heat equal to 5 % of that month’s methane energy, in July 3 %.
January: methane energy 6,300 MWh · digester heating 310 MWh (5 %) · heat for a user 0 MWh
- Methane energy of the month
- Digester heating
How it works: from feedstock to products
- Feedstock120,000 t/yr
- Biogas13M Nm³/yr
- Gas to grid7.3M Nm³
- Useful heat0 MWh
- Digestate100,000 t/yr
- Heat produced (gross)
- 2,882 MWh
- Digester heat demand
- 2,882 MWh
- Useful heat (economic)
- 0 MWh of 0
- Power: own use / sold
- 0 / 0 MWh
Climate case (EU RED method)
EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.
- Below the RED minimum: a gas-tight digestate store, off-gas combustion or more manure in the mix raise the saving.
- RED sustainability criteria apply (rated input ≥ 2 MW).
- Residues other than manure, maize and food waste use the RED biowaste values.
Scores by dimension
No single magic number. The overall score comes with its explanation.
- Energy equivalent ≈ 3360 kWe (scale score 100/100)
- Feedstock energy ≈ 632 kWh of methane per tonne (score 77/100)
- Feedstock available 12 of 12 months
- Biomethane: raw biogas ≈ 1493 Nm³/h (EU average plant ≈ 483 Nm³/h)
- ≈ 3 km to the gas grid
- No critical site constraints found from your answers
- Dry digestion — fewer suppliers
- Base-case simple payback ≈ 4.4 years
- Number and weight of permitting / regulatory steps: 14 points (more = harder)
- Expected methane loss 2.2 % (good practice ≤ 2 %)
- Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
- Strongest: Location & logistics (100); weakest: Regulatory complexity (59).
Calculation details
Feedstock & logistics
| Stream | t/yr | DM, % | Nm³ CH₄/t | Logistics / energy | Max. distance |
|---|---|---|---|---|---|
| Olive pomace (two-phase)delivered 25 km | 120,000 | 30 | 63.4 | 9 % | ≈ 178 km |
Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.
Technology & digester
Dry (high-solids) digestion, mesophilic
Garage (box) batch digesters with percolate recirculation, or horizontal plug-flow
- Working volume
- ≈ 25,000 m³
- Retention time
- 75.4 days
- Loading rate
- 3.5 kg VS/(m³·d)
- Digestate storage
- ≈ 26,000 m³
- Average mix dry matter 30 % ≥ 22 %: wet digestion would need dilution, increasing volume and heat losses.
- Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
- Two-stage layout (main + post-digester) for stability with fats or larger flows.
- Wet digestion diluted with slurry/effluent — cheaper equipment, larger digester
Climate: Andalusia (Córdoba), mean 20.2 °C, ≈ 752 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 10.2 °C), Prague (CZ) (Δ 10.4 °C), Copenhagen (DK) (Δ 10.8 °C).
Monthly energy balance
Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.
| Month | Feedstock, t | Gas energy, MWh | Digester heat, MWh | Useful heat, MWh | Net electricity, MWh |
|---|---|---|---|---|---|
| Jan | 10,185 | 6,337 | 312 | 0 | 0 |
| Feb | 9,281 | 5,775 | 270 | 0 | 0 |
| Mar | 10,185 | 6,337 | 284 | 0 | 0 |
| Apr | 9,856 | 6,133 | 253 | 0 | 0 |
| May | 10,185 | 6,337 | 229 | 0 | 0 |
| Jun | 9,856 | 6,133 | 188 | 0 | 0 |
| Jul | 10,185 | 6,337 | 168 | 0 | 0 |
| Aug | 10,185 | 6,337 | 168 | 0 | 0 |
| Sept | 9,856 | 6,133 | 196 | 0 | 0 |
| Oct | 10,185 | 6,337 | 236 | 0 | 0 |
| Nov | 9,856 | 6,133 | 274 | 0 | 0 |
| Dec | 10,185 | 6,337 | 304 | 0 | 0 |
| Σ | 120,000 | 74,667 | 2,882 | 0 | 0 |
CAPEX, OPEX, revenue (base case)
| Digester | 3.2M |
| New covered storage | 2.3M |
| New open storage | 250K |
| Feedstock reception and preparation | 140K |
| Gas handling and cleaning | 180K |
| Upgrading | 3.4M |
| Gas-grid injection | 310K |
| Gas pipeline | 530K |
| Boiler (heat only) | 52K |
| Electrical systems and controls | 620K |
| Pipework | 410K |
| Civil works | 620K |
| Grid connection | 8.8K |
| Engineering and permits | 950K |
| Contingency | 1.3M |
| Total | 14M |
| Staff | 140K |
| Maintenance | 220K |
| Maintenance (Upgrading) | 130K |
| Insurance | 71K |
| Testing and monitoring | 5K |
| Feedstock transport | 460K |
| Digestate handling | 280K |
| Purchased electricity | 790K |
| Certification and balancing | 220K |
| Total | 2.3M |
| Biomethane | 5.1M |
| Incremental digestate value | 490K |
| Total | 5.6M |
Unit costs are estimates. Replace them with supplier quotations.
Digestate: asset or liability
Status: asset · 104,527 t/yr · nitrogen ≈ 399,000 kg/yr · land needed ≈ 2,347 ha (available 2,500 ha).
Incremental fertiliser value €490K/yr, handling €280K/yr, net €210K/yr.
- Digestate storage for 3 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
- Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate
Expected losses: 2.2 % of methane produced (range 1.2 % – 3.6 %) ≈ 3,179 t CO₂e/yr; fossil emissions displaced ≈ 14,335 t CO₂/yr. Losses vs benefit: 22 %.
- Expected loss 2.2 % is above good practice (2 %): budget for monitoring.
- Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
- Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
- Continuous gas-holder pressure monitoring; a standby flare instead of venting.
- CHP with an oxidation catalyst and tuning regime to cut methane slip.
Avoided emissions from open manure storage are not credited (conservative).
Permits & regulation (indicative)
Complexity: medium. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.
- Building permit and environmental permit; EIA screening (Directive 2011/92/EU as transposed)New installation · effort: medium · to verify
- Industrial Emissions Directive (2010/75/EU) permit — anaerobic digestion of waste above ~100 t/dayThroughput above the IED threshold · effort: high · to verify
- Nitrates Directive (91/676/EEC): 170 kg N/ha from organic manures in vulnerable zones; closed spreading periodsDigestate is spread on land · effort: medium · confirmed
- ATEX hazardous-area zoning (Directives 2014/34/EU, 1999/92/EC)Methane in the gas phase · effort: medium · confirmed
- RED III sustainability & GHG certification (e.g. ISCC EU / REDcert) and Guarantees of Origin for biomethaneBiomethane is sold as a renewable product · effort: medium · confirmed
- Gas-grid injection: connection request, gas-quality specification, metering (TSO/DSO)Grid injection · effort: high · to verify
Safety (risk register)
- Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
- Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
- Fixed gas detectors in the CHP room and near tanks
- Flame arresters, over/under-pressure relief, safety flare
- Ignition-source control and hot-work permits
- Hydrogen sulphide (H₂S): acute toxicity, corrosion high
- Biological / chemical desulphurisation of the biogas
- Personal H₂S monitors, no lone working
- H₂S monitoring upstream of the CHP (engine protection)
- Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
- Entry only under permit, ventilation, standby person
- Self-contained breathing apparatus for rescue
- Over/under-pressure: membrane roof rupture, tank deformation medium
- Liquid seals / relief valves venting to a safe location
- Gas-holder level and pressure sensors
- CHP: carbon monoxide, fire, high temperatures medium
- CHP room ventilation, CO detectors
- Emergency stop, fire suppression
- Soil and water pollution: slurry/digestate spills, lagoon overflow high
- Bund sized for the largest tank
- Level sensors and a spill-response plan
- Digestate storage covering the closed spreading season
Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.
Assumptions used (162)
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →
- Support: No open support: IDAE biogas grants have no active call, and a biomethane quota (0.5 % in 2028 → 6 % in 2035) is still a draft decree.
- Pig-dense regions (Catalonia, Aragón) face nitrate pressure: digestate treatment can be as important as energy.
- The verdict excludes subsidies; national support is shown as separate cases.
- This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
- Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
- Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.
What could break the economics
Each stress test applied to the base case on its own.
- biomethane: local CAPEX factor
- 0.616 … 1.144 —
- NPV low…high: €12M … €23M
- Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
- 0.059 … 0.089 —
- NPV low…high: €13M … €20M
- Mineral potassium price
- 0.713 … 0.8099 EUR/kg K₂O
- NPV low…high: €17M … €18M
- Mineral nitrogen price
- 1.045 … 1.818 EUR/kg N
- NPV low…high: €17M … €18M
- Mineral phosphorus price
- 1.419 … 1.847 EUR/kg P₂O₅
- NPV low…high: €17M … €17M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
- Biomethane price without support, base: 0.6925 EUR/Nm³ · CALCULATED_VALUE · LOW
- CALCULATION: TTF 46.49 €/MWh HHV × 1.11 HHV/LHV + 20 €/MWh LHV green-gas premium (engineering assumption, no official GO price); World Bank Pink Sheet (2026-10-02), Natural gas Europe (TTF), mean Q4 2025 – Q3 2026 15.25 $/mmbtu GCV ÷ 0.2931 MWh/mmbtu at 1.1193 USD/EUR; × 9.6709 kWh LHV/Nm³. No guaranteed offtake or certificate eligibility.
- 2025-10 / 2026-09 · checked 2026-11-11 · Grid-injected biomethane, HHV prices converted to LHV; without feed-in tariffs, quotas or tax relief
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- biomethane: local CAPEX factor: 0.88 — · CALCULATED_VALUE · MEDIUM
- 0.72 traded equipment + 0.28 × local/German labour cost (18.5/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Debt interest rate (EUR-equivalent): 0.054 — · CALCULATED_VALUE · MEDIUM
- Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
- Typical agri / project lending (KfW, EBRD, IFC practice)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
- Typical
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Digestate that has no adequate land: 6.57 EUR/t · CALCULATED_VALUE · MEDIUM
- Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Incremental digestate handling on adequate land: 2.68 EUR/t · CALCULATED_VALUE · MEDIUM
- Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.069 — · CALCULATED_VALUE · MEDIUM
- Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 1.48 % (A3; Damodaran, 2026-07); not a bank offer
- 2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Wholesale electricity price (market average): 0.07351 EUR/kWh · MARKET_DATA · HIGH
- ENTSO-E day-ahead (via Energy-Charts), zone ES, average 73.5 €/MWh, 2025-10-01 – 2026-10-01
- 2025-10-01 / 2026-10-01 · checked 2026-10-31 · Wholesale bidding zone ES; not a guaranteed export PPA
- WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
- Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
- At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
- 15 % profile & balancing discount for a small seller (assumption, same for all markets)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
- World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
- 2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
- Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
- World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
- 2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
- Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
- World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
- 2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
- Exchange rate: 1 EUR/EUR · MARKET_DATA · HIGH
- Euro
- CONSTANT: EUR reporting currency; no currency conversion
- Value of useful heat (displaced gas / boiler efficiency): 0.0608 EUR/kWh th · CALCULATED_VALUE · MEDIUM
- Business gas 54.723 €/MWh LHV ÷ 0.9
- 2026-S1 · checked 2026-10-31 · GJ10000-99999; reference band, customer gas use unknown
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
- Shorter than the 20-year technical life — conservative
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Official hourly labour cost, economy-wide (wages + employer costs): 26.4 EUR/h · MARKET_DATA · HIGH
- Eurostat lc_lci_lev: hourly labour cost (wages + employer costs), industry, construction & services, 2025
- WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
- Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
- Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
- Inflation target + 0.5 pp wage drift
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Road transport of organic feedstock: 0.115 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
- 0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Loading/unloading per tonne: 0.97 EUR/t · CALCULATED_VALUE · MEDIUM
- 0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
- Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Customer electricity price (invoice split not verified): 0.133 EUR/kWh · USER_INPUT · MEDIUM
- USER_INPUT 0.133 EUR/kWh / FX 1; Euro. Invoice date not supplied; energy/demand split assumed separately.
- REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
- olive_pomace: dry matter: 30 % FM · MEASURED · MEDIUM
- MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
- REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
- olive_pomace: volatile solids: 88 % DM · MEASURED · MEDIUM
- MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
- REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
- olive_pomace: BMP (scenarios ± inter-laboratory spread): 240 L CH₄/kg VS · MEASURED · MEDIUM
- MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
- REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified