Sample report · Denmark

Danish-style farm cluster, biomethane

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

A Danish developer runs a centralised plant: slurry is collected from partner farms, food waste comes in with a gate fee, biomethane goes to the gas grid and digestate returns to the farms. This is the model behind most of Denmark's biomethane.

Operating assumptions

  • Dairy cattle slurry: 108,000 t/yr · DM: 8.5 % · 12 months · Spread on our own fields · Delivered from another site: 8 km · Purchase price / gate fee: 0 DKK/t
  • Pig slurry: 14,250 t/yr · DM: 5.5 % · 12 months · Spread on our own fields · Delivered from another site: 10 km · Purchase price / gate fee: 0 DKK/t
  • Source-separated food waste: 30,000 t/yr · DM: 24 % · 12 months · Other / don't know · Delivered from another site: 30 km · Purchase price / gate fee: -220 DKK/t
  • Electricity: 1,500,000 kWh/yr · Electricity price on your bill (if known): 0.97 DKK/kWh
  • No heat needed
  • Land available for spreading digestate: 6,000 ha · Distance to the gas grid (for biomethane): 2 km
  • Existing lagoon / store that could be covered: 100,000 m³
  • Grid connection? Yes

What to verify

Sign supply contracts with each farm, a food-waste contract with its term and a biomethane offtake. Check haulage costs, the grid connection and land for digestate return.

Possible with conditions

It can pay off, but only if the key conditions hold — confirm them in a feasibility study.

  • Base NPV positive (€4.3M), payback ≈ 7.5 yrs.
  • Conservative-case NPV is negative (-€14M) — sensitive to key assumptions.

Largest benefit — “biomethane sales”: ≈ 91 % of all revenue and savings.

What would change the verdict
  • → Secure long-term heat and power offtake; benchmark CAPEX with 3–5 suppliers.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

Grey zone: the answer flips between the conservative and the optimistic case. Before paying for a feasibility study, check these first:

NPV: conservative -€14M · base €4.3M · optimistic €21M

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in 77 % of cases.

  1. Lab test of the methane yield (BMP) · CH₄ −20 % (-€5.6M)
  2. Secure the feedstock supply in writing · Feedstock potential −20 % (-€5.5M)
  3. Get a biomethane offtake offer · Energy prices −20 % (-€4.8M)

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

To reach a bankable estimate (±15 %)
  1. Laboratory methane-potential (BMP) test of 2–3 feedstock samples — ≈ €300–800 each
  2. 2–3 supplier quotes for the plant
  3. Grid or gas-network connection conditions from the operator
  4. Letters of intent for feedstock supply and for heat, power or biomethane offtake
  5. Then a feasibility study with permits and financing (±15 %)
From screening to construction

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€11M – €14M
≈ DKK 89M (base)
Payback
3.6 yr – > 25 yr
base: 7.5 yr · no subsidies
NPV (base)
€4.3M
range: -€14M … €21M
Chosen route
Biomethane
Confidence: Medium

Feedstock and energy

Feedstock potential
150,000 t/yr
energy ≈ 286 kWh CH₄/t
Biogas
5.9M – 8.1M Nm³/yr
≈ 937 Nm³/h (base)
Net energy
2.9M – 4.3M Nm³/yr
biomethane / year
Candidate capacity
1,900 kWe
large (1–5 MW)

How far you can rely on these numbers

Medium · 72/100
  • Backed by your data and our sources72
  • You can still add+18
  • Needs a feasibility study (lab, quotes, contracts)10

72/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainLaboratory DM, VS and BMP results for every feedstock streamLarge effectSend a sample to a laboratory: dry matter and VS take a few days, BMP several weeksValues equal to the typical ones shown in the form do not count as a laboratory result.+12
  • At least one price affecting this route relies on an unconfirmed market proxy or uncontracted offtake — confirm the applicable tariff or buyer contract+6

With all of it: up to 90/100

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Animal by-products (Cat. 3) → pasteurisation and veterinary approval required.
  • "dairy cattle slurry": logistics take 47 % of its energy value — borderline.
  • "pig slurry": hauling 10 km eats ≈59 % of its energy value — build the plant at the source (rule of thumb: ≤ 7 km).
Country conditions
  • The Danish model is centralised: dozens of farms supply one large biomethane plant; single-farm CHP is rare.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Strong candidate”
  • Payback in the base case is 7.5 yr; it needs to be 6.5 yr or less.
  • The conservative case must stay profitable too (its NPV is -€14M).
ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 9,800 MWh a year, valued at ≈ DKK 0.639 per kWh.
Possible with conditions
CHP (power + heat)
€6.2M+€1.9Mheat ≥ DKK 0.503 per kWh
Order of action
  1. 1Verify first: Secure the feedstock supply in writing. Up to €320K of this decision depends on it. →
  2. 2Find a heat buyer for ≈ 9,800 MWh a year (heat ≥ DKK 0.503 per kWh).
  3. 3Ask 3–5 suppliers for quotes: the project breaks even up to an investment of €15M. →

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Secure the feedstock supply in writingcan change the answer-€4M … €4.3M€320K
Get a biomethane offtake offercan change the answer-€1.7M … €14M€16K
Get supplier quotes for the plantcan change the answer-€500K … €9.1M€880
Fix feedstock prices and gate fees in contracts€1.8M … €6.7M—
Verify the market price€2.2M … €5.5M—
Check the fertiliser value of the digestate€3.8M … €5M—
How to check: Secure the feedstock supply in writing
  1. List every stream you do not produce yourself: supplier, tonnes per month, season and contract term.
  2. Get letters of intent or contracts for at least the loan period, and size the plant on the tonnage that is signed, not promised.
Request to send
Request for a feedstock supply agreement
Site: Denmark. A biogas plant would take:
- dairy cattle slurry: 110,000 t/year, DM ≈ 8.5 %
- pig slurry: 14,000 t/year, DM ≈ 5.5 %
- source-separated food waste: 30,000 t/year, DM ≈ 24.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Get a biomethane offtake offer
  1. Ask two or three biomethane traders or gas suppliers for an offer without state support.
  2. Ask the gas grid operator for the injection point, pressure and connection cost.
Request to send
Request for a biomethane offtake offer
Site: Denmark. Expected output ≈ 440 Nm³/h, ≈ 42,000 MWh (HHV) a year; ≈ 56 % of organic matter from manure (relevant for certification). Please offer a price per MWh (HHV) without state support, indexation, term, and say whether guarantees of origin or sustainability certificates are included or paid extra.

Then enter it in: Energy step: biomethane price offered by a buyer

How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Denmark.
Feedstock (screening values, to be confirmed):
- dairy cattle slurry: 110,000 t/year, DM ≈ 8.5 %
- pig slurry: 14,000 t/year, DM ≈ 5.5 %
- source-separated food waste: 30,000 t/year, DM ≈ 24.0 %
Design basis from the screening: raw biogas ≈ 820 Nm³/h at ≈ 58 % CH₄; digester working volume ≈ 13,000 m³; membrane upgrading ≈ 440 Nm³/h biomethane (≈ 820 Nm³/h raw gas); new digestate storage ≈ 0 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Fix feedstock prices and gate fees in contracts
  1. For every purchased stream and every gate fee, note today's price and its range over the last three years.
  2. Fix prices or gate fees with indexation for the loan period, and check that the plan still pays with prices 25 % worse.
Request to send
Request for a feedstock supply agreement
Site: Denmark. A biogas plant would take:
- dairy cattle slurry: 110,000 t/year, DM ≈ 8.5 %
- pig slurry: 14,000 t/year, DM ≈ 5.5 %
- source-separated food waste: 30,000 t/year, DM ≈ 24.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Biomethane price at NPV = 0
€0.59/Nm³€55/MWh HHV
now €0.692/Nm³ · €64.5/MWh HHV
Highest installed cost at NPV = 0
€15M
now €12M
Feedstock price headroom
€2.48/t
can pay up to €2.48 per tonne more for every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-€2.3M
Median NPV
€2.5M
NPV P90 (1 in 10 better)
€7.4M
Chance that NPV > 0
77 %
Median payback
8.3 yr

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: 4.3M)

  1. CH₄ −20 %-5.6M
  2. Feedstock potential −20 %-5.5M
  3. Energy prices −20 %-4.8M
  4. Feedstock transport +50 %-3.9M
  5. CAPEX +20 %-3.2M
  6. Maintenance +30 %-990K
  7. Useful heat (economic) −50 %0
  8. CHP downtime +10 pp0
NPV = 0 if CAPEX falls by
already positive
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
already positive
relative to the base case

Flip the NPV sign: CH₄ −20 %; Feedstock potential −20 %; Energy prices −20 %.

Scenarios

Route: Biomethane. Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€3M
  • Biomethane2.7M
  • Incremental digestate value260K
OPEX / yr€1.4M
  • Feedstock transport690K
  • Purchased electricity430K
  • Disposal of pre-treatment rejects300K
  • Staff190K
Operating margin (EBITDA)€1.6M
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr5,894.57,493.68,093.1
CAPEX€14M€12M€11M
OPEX / yr€1.6M€1.4M€1.2M
Revenue + savings / yr€1.8M€3M€4.3M
Operating margin (EBITDA)€140K€1.6M€3M
Simple payback> 25 yr7.5 yr3.6 yr
Discounted paybackno payback10.3 yr4.5 yr
NPV-€14M€4.3M€21M
IRR-22.5 %10.6 %26.6 %
DSCR (min)0.11.73.5

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).

Cumulative cash flow, €
-18M-2.8M12M28M43M03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) €11M€860K12.7 yr-€2.3M-€13M … €3.1M
Boiler (heat only) €7.8M-€570Kno payback-€14M-€20M … -€12M
Biomethane chosen€12M€1.6M7.5 yr€4.3M-€14M … €21M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 815 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 76,000Biomethane965€7.4M€640K
× 0.75 110,000Biomethane1,448€9.7M€2.5M
× 1 your input150,000Biomethane1,930€12M€4.3M
× 1.5 230,000Biomethane2,896€16M€7.5M
× 2 300,000Biomethane3,861€21M€9.7M
× 3 460,000Biomethane5,791€36M€5.6M

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

There is no support for new projects that we could calculate — see the country overview

No support scheme for new projects is modelled for this country.

Country overviewchecked 30 Oct 2026

Legacy biogas premiums closed to new plants since 2020; the EU-approved green-gas tender (20-year premium) has not been held, so there is no route for new small plants.

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

86/100

Of every 100 kWh of energy in the methane, 86 become a product that earns money or replaces a purchase.

100 % = 44,000 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Biomethane38,000 MWh 86 %

Runs the plant

  • Digester heating4,500 MWh 10 %

Losses

  • Conversion losses (engine, boiler)500 MWh 1 %
  • Methane slip in upgrading270 MWh 0.6 %
  • Methane leaks650 MWh 2 %

What this means for the project

  • The plant buys 3,300 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
2.9M – 4.3M Nm³Calculated

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 12 % of that month’s methane energy, in July 9 %.

January: methane energy 3,600 MWh · digester heating 430 MWh (12 %) · heat for a user 0 MWh

  • Methane energy of the month
  • Digester heating

How it works: from feedstock to products

  1. Feedstock150,000 t/yr
  2. Biogas7.5M Nm³/yr
  3. Gas to grid3.9M Nm³
  4. Useful heat0 MWh
  5. Digestate140,000 t/yr
Heat produced (gross)
4,503 MWh
Digester heat demand
4,503 MWh
Useful heat (economic)
0 MWh of 0
Power: own use / sold
0 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
-2 g CO₂e/MJ
gas-tight digestate storage
Fossil comparator
94 g CO₂e/MJ
Greenhouse-gas saving
102 %
RED minimum: 65 %
Avoided emissions
13,050 t CO₂e
  • Meets the RED minimum.
  • RED sustainability criteria apply (rated input ≥ 2 MW).

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
75/100
  • Energy equivalent ≈ 1930 kWe (scale score 100/100)
  • Feedstock energy ≈ 286 kWh of methane per tonne (score 54/100)
  • Feedstock available 12 of 12 months
  • Logistics take up to 59 % of the feedstock's energy value
Energy fit
90/100
  • Biomethane: raw biogas ≈ 815 Nm³/h (EU average plant ≈ 483 Nm³/h)
  • ≈ 2 km to the gas grid
Location & logistics
100/100
  • No critical site constraints found from your answers
Technical feasibility
90/100
  • ABP pasteurisation adds complexity
Economics
69/100
  • Base-case simple payback ≈ 7.5 years
Regulatory complexity
54/100 risk
  • Number and weight of permitting / regulatory steps: 17 points (more = harder)
Environmental risk
21/100 risk
  • Expected methane loss 2.1 % (good practice ≤ 2 %)
Overall project viability
77/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Location & logistics (100); weakest: Regulatory complexity (46).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Dairy cattle slurrydelivered 8 km108,0008.513.647 %≈ 9 km
Pig slurrydelivered 10 km14,2505.512.359 %≈ 7 km
Source-separated food wastedelivered 30 km30,0002490.811 %≈ 160 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Wet mesophilic digestion (CSTR)

Vertical CSTR with mechanical mixing and a membrane gas holder

Working volume
≈ 13,000 m³
Retention time
30 days
Loading rate
3.1 kg VS/(m³·d)
Digestate storage
≈ 71,000 m³
  • Dry matter 11.3 %: a liquid mix suited to wet mesophilic digestion.
  • Continuous feed — continuous operation gives steady gas and the simplest control.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Two-stage layout (main + post-digester) for stability with fats or larger flows.
Alternatives
  • Separate pasteurisation (70 °C / 1 h) ahead of a mesophilic digester instead of thermophilic operation

Climate: Central Jutland (Herning), mean 9 °C, ≈ 3,269 heating degree-days. Closest climate analogues: Copenhagen (DK) (Δ 0.9 °C), Munich (DE, Bavaria) (Δ 2.1 °C), Salzburg (AT) (Δ 2.1 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan12,9223,64142600
Feb11,7763,31838800
Mar12,9223,64142500
Apr12,5053,52338700
May12,9223,64136400
Jun12,5053,52332400
Jul12,9223,64132700
Aug12,9223,64132700
Sept12,5053,52333400
Oct12,9223,64137700
Nov12,5053,52339900
Dec12,9223,64142500
Σ152,25042,8994,50300
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester1.7M
Covering existing storage1.5M
Feedstock reception and preparation1.6M
Pasteurisation (70 °C / 1 h)230K
Gas handling and cleaning130K
Upgrading2.7M
Gas-grid injection360K
Gas pipeline420K
Boiler (heat only)84K
Electrical systems and controls520K
Pipework350K
Civil works520K
Grid connection10K
Engineering and permits800K
Contingency1.1M
Total12M
OPEX / yr (EUR)
Staff190K
Maintenance190K
Maintenance (Upgrading)110K
Insurance60K
Testing and monitoring5K
Feedstock purchase, net of gate fees-840K
Feedstock transport690K
Disposal of pre-treatment rejects300K
Digestate handling120K
Purchased electricity430K
Certification and balancing120K
Total1.4M
Revenue + savings / yr (EUR)
Biomethane2.7M
Incremental digestate value260K
Total3M

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: asset · 142,939 t/yr · nitrogen ≈ 695,724 kg/yr · land needed ≈ 1,280 ha (available 6,000 ha).

Incremental fertiliser value €260K/yr, handling €120K/yr, net €150K/yr.

  • Digestate from delivered manure is assumed to go back to the supplying farms (return haul is in the transport cost). Fix this in the supply contracts; if farms refuse it, the plant needs its own outlet.
  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 2.1 % of methane produced (range 1.1 % – 3.6 %) ≈ 1,784 t CO₂e/yr; fossil emissions displaced ≈ 7,601 t CO₂/yr. Losses vs benefit: 23 %.

  • Expected loss 2.1 % is above good practice (2 %): budget for monitoring.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: high. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Building permit and environmental permit; EIA screening (Directive 2011/92/EU as transposed)
    New installation · effort: medium · to verify
  • Industrial Emissions Directive (2010/75/EU) permit — anaerobic digestion of waste above ~100 t/day
    Throughput above the IED threshold · effort: high · to verify
  • Nitrates Directive (91/676/EEC): 170 kg N/ha from organic manures in vulnerable zones; closed spreading periods
    Digestate is spread on land · effort: medium · confirmed
  • ATEX hazardous-area zoning (Directives 2014/34/EU, 1999/92/EC)
    Methane in the gas phase · effort: medium · confirmed
  • RED III sustainability & GHG certification (e.g. ISCC EU / REDcert) and Guarantees of Origin for biomethane
    Biomethane is sold as a renewable product · effort: medium · confirmed
  • Gas-grid injection: connection request, gas-quality specification, metering (TSO/DSO)
    Grid injection · effort: high · to verify
  • Animal by-products approval: pasteurisation 70 °C / 1 h (Cat. 3) or pressure sterilisation (Cat. 2), veterinary registration
    Slaughter / dairy / food residues in the feed · effort: high · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Biological hazards: pathogens in animal by-products and food waste high
    Condition: Animal by-products / food waste in the mix
    • Pasteurisation 70 °C / 1 h (Cat. 3) with time–temperature control
    • Separate dirty and clean zones, vehicle disinfection
    • Veterinary supervision and traceability
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (165)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: Legacy biogas premiums closed to new plants since 2020; the EU-approved green-gas tender (20-year premium) has not been held, so there is no route for new small plants.
  • The Danish model is centralised: dozens of farms supply one large biomethane plant; single-farm CHP is rare.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

biomethane: local CAPEX factor
0.728 … 1.352 —
NPV low…high: -€500K … €9.1M
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.05 … 0.08 —
NPV low…high: €2.2M … €5.5M
Mineral potassium price
0.713 … 0.8099 EUR/kg K₂O
NPV low…high: €4.3M … €4.3M
Mineral nitrogen price
1.045 … 1.818 EUR/kg N
NPV low…high: €3.8M … €5M
Mineral phosphorus price
1.419 … 1.847 EUR/kg P₂O₅
NPV low…high: €4.2M … €4.3M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.6925 EUR/Nm³ · CALCULATED_VALUE · LOW
CALCULATION: TTF 46.49 €/MWh HHV × 1.11 HHV/LHV + 20 €/MWh LHV green-gas premium (engineering assumption, no official GO price); World Bank Pink Sheet (2026-10-02), Natural gas Europe (TTF), mean Q4 2025 – Q3 2026 15.25 $/mmbtu GCV ÷ 0.2931 MWh/mmbtu at 1.1193 USD/EUR; × 9.6709 kWh LHV/Nm³. No guaranteed offtake or certificate eligibility.
2025-10 / 2026-09 · checked 2026-11-11 · Grid-injected biomethane, HHV prices converted to LHV; without feed-in tariffs, quotas or tax relief
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
biomethane: local CAPEX factor: 1.04 — · CALCULATED_VALUE · MEDIUM
0.72 traded equipment + 0.28 × local/German labour cost (36.2/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.045 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 10.46 EUR/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 4.1 EUR/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.06 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.00 % (Aaa; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.1014 EUR/kWh · MARKET_DATA · HIGH
ENTSO-E day-ahead (via Energy-Charts), zone DK1, average 101.4 €/MWh, 2025-10-01 – 2026-10-01
2025-10-01 / 2026-10-01 · checked 2026-10-31 · Wholesale bidding zone DK1; not a guaranteed export PPA
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 7.475 DKK/EUR · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-09
2026-11-09 · checked 2026-11-10 · DKK per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Value of useful heat (displaced gas / boiler efficiency): 0.08547 EUR/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 76.923 €/MWh LHV ÷ 0.9
2026-S1 · checked 2026-10-31 · GJ10000-99999; reference band, customer gas use unknown
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 51.7 EUR/h · MARKET_DATA · HIGH
Eurostat lc_lci_lev: hourly labour cost (wages + employer costs), industry, construction & services, 2025
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.169 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 1.32 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.1298 EUR/kWh · USER_INPUT · MEDIUM
USER_INPUT 0.97 DKK/kWh / FX 7.4753; Official EUR reference rate, 2026-11-09. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
dairy_slurry: dry matter: 8.5 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
dairy_slurry: volatile solids: 80 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
dairy_slurry: BMP (scenarios ± inter-laboratory spread): 200 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
pig_slurry: dry matter: 5.5 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
pig_slurry: volatile solids: 77 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
pig_slurry: BMP (scenarios ± inter-laboratory spread): 290 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
food_waste: dry matter: 24 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
food_waste: volatile solids: 88 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
food_waste: BMP (scenarios ± inter-laboratory spread): 430 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified