Sample report · Germany

Arable / crop farm · Maize silage (energy crop): 9,000 t/yr · Dairy cows: 250

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

A Lower Saxony farm runs the typical German plant of the EEG era: purchased maize silage plus own cattle slurry, power to the grid and CHP heat to a village heat network. The case shows what such a plant earns without a feed-in tariff.

Operating assumptions

  • Maize silage (energy crop): 9,000 t/yr · DM: 33 % · 12 months · Other / don't know · Delivered from another site: 4 km · Purchase price / gate fee: 42 EUR/t
  • Dairy cows: 250 · Housed all year
  • Electricity: 250,000 kWh/yr · Electricity price on your bill (if known): 0.22 EUR/kWh
  • All year: hot water, steam, process · Heat needed per year (if known): 1,800,000 kWh/yr
  • Land available for spreading digestate: 450 ha · Distance to the gas grid (for biomethane): 6 km
  • Existing lagoon / store that could be covered: 4,000 m³
  • Grid connection? Yes

What to verify

Check the silage supply contract and price, the heat-network agreement and the EEG tender conditions (maize cap, flexible operation).

Weak economics

Under current conditions the investment won't pay back in a reasonable time. Below is what could change that.

  • Base-case operating margin does not cover costs.
  • Even the optimistic case has a negative NPV (-€3.1M).

Operating margin (≈ -€120K/year) is too small for an investment of ≈ €3.2M.

What would change the verdict
  • → NPV = 0 with ≈ 101 % higher energy prices.
  • → Lower CAPEX alone does not fix it — additional revenue streams are needed.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

A clear no under these conditions: even the optimistic case does not pay back. Don't spend money on a feasibility study unless one of the changes above happens.

NPV: conservative -€7.6M · base -€4.8M · optimistic -€3.1M

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in < 1 % of cases.

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€2.9M – €3.8M
Payback
> 25 yr – no payback
base: no payback · no subsidies
NPV (base)
-€4.8M
range: -€7.6M … -€3.1M
Chosen route
CHP (power + heat)
Confidence: Medium

Feedstock and energy

Feedstock potential
13,000 t/yr
energy ≈ 750 kWh CH₄/t
Biogas
1.4M – 1.9M Nm³/yr
≈ 228 Nm³/h (base)
Net energy
2,600 – 3,600 MWh/yr
useful heat: 1,100 – 1,700 MWh · ≈ 85 % of your electricity use
Candidate capacity
470 kWe
medium (0.25–1 MW)

How far you can rely on these numbers

Medium · 75/100
  • Backed by your data and our sources75
  • You can still add+15
  • Needs a feasibility study (lab, quotes, contracts)10

75/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainLaboratory DM, VS and BMP results for every feedstock streamLarge effectSend a sample to a laboratory: dry matter and VS take a few days, BMP several weeks+15

With all of it: up to 90/100

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • "maize silage (energy crop)": enter the harvested fresh mass that goes into the clamp; 9 % of its dry matter is lost during ensiling (KTBL) and a clamp silo is costed. If you buy finished silage out of another farm's clamp, the loss and the clamp are the seller's and this result is conservative.
  • Energy-crop share is capped in many support schemes (e.g. EEG maize cap, RED III sustainability criteria) — check before relying on it.
  • CHP performance uses a 50 Hz biogas full-load catalogue reference (03/2025), interpolated between ratings; part-load and ambient derating require supplier confirmation.
Compared with the market
Our estimate: ≈ 6,700 €/kW at ≈ 470 kW
  • 3,400–7,500 EUR/kW — Flexible plant, Germany · within rangeDBFZ / Fraunhofer IEE for BMWK (February 2024): €7,521 per kW rated (≈ €3,400 per kW installed) capacity · 2023 · Official study
  • 2,800–7,000 EUR/kW — Agricultural plants, Poland · within rangePolish trade press 2023–2024 (PLN 7–20 m for 500 kW; PLN 12–16 m for 1 MW); IOŚ-PIB: ≈ PLN 30 m for 1 MW · 2023–2024 · Trade press

Market figures are mostly trade press and supplier estimates, not audited budgets. Real prices come from 3–5 supplier quotes.

Country conditions
  • Mature market (≈ 9 300 CHP plants): German economics are tariff-driven — compare the support case with the no-support verdict.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Possible with conditions”
  • The base-case NPV is negative (-€4.8M).
  • Payback in the base case is no payback; it needs to be 10 yr or less.
ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 1,300 MWh a year, valued at ≈ €0.0841 per kWh.
Weak economics-€3.6M+€1.2Mheat ≥ €0.206 per kWh
Take in food waste
≈ 6,600 t a year of source-separated food waste from ≈ 15 km away, with a gate fee of €6 per tonne.
Weak economics-€6.5M-€1.7Mgate fee ≥ €99.3 per tonne
Order of action
  1. 1Find a heat buyer for ≈ 1,300 MWh a year (heat ≥ €0.206 per kWh).
Scenario assumptions
  • Co-substrate share of the organic matter (VS) after it is added: 30 % · ASSUMPTION · LOW · 2026-11-02 · Judgement: usual co-digestion share at manure plants; the model applies pasteurisation, rejects and inhibition checks to the new mix.
  • Haul distance of the co-substrate: 15 km · ASSUMPTION · LOW · 2026-11-02 · Judgement: food processors within a regional collection radius.
  • Gate fee received for source-separated food waste: €6/t · ASSUMPTION · LOW · 2026-11-02 · Judgement, deliberately low. WRAP UK Gate Fees Report 2025/26 (3 July 2026): AD gate fees fell from 2024/25 and several councils paid £0 or less. The paid report gives the gate fee at which the scenario breaks even.

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Get supplier quotes for the plant-€5.9M … -€3.6M—
Fix feedstock prices and gate fees in contracts-€5.8M … -€3.7M—
Confirm a reliable heat buyer and demand-€5.1M … -€4.5M—
Secure the feedstock supply in writing-€4.8M … -€4.3M—
Verify the market price-€4.9M … -€4.6M—
Lab test of the methane yield (BMP)-€5M … -€4.8M—
How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Germany.
Feedstock (screening values, to be confirmed):
- maize silage (energy crop): 8,200 t/year, DM ≈ 33.0 %
- dairy cattle slurry: 4,500 t/year, DM ≈ 11.4 %
Design basis from the screening: raw biogas ≈ 230 Nm³/h at ≈ 52 % CH₄; digester working volume ≈ 2,300 m³; combined heat and power ≈ 470 kWe; new digestate storage ≈ 1,100 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Fix feedstock prices and gate fees in contracts
  1. For every purchased stream and every gate fee, note today's price and its range over the last three years.
  2. Fix prices or gate fees with indexation for the loan period, and check that the plan still pays with prices 25 % worse.
Request to send
Request for a feedstock supply agreement
Site: Germany. A biogas plant would take:
- maize silage (energy crop): 8,200 t/year, DM ≈ 33.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Confirm a reliable heat buyer and demand
  1. Confirm the buyer's monthly heat demand and the temperature they need.
  2. Agree a price per kWh linked to their current fuel, and a term of at least the loan period.
Request to send
Offer of renewable heat
Site: Germany. A biogas plant can supply ≈ 3,400 MWh of heat a year (hot water, ≈ 80–90 °C) all year round. Please tell us your monthly heat use, the temperature you need, your current fuel and its price, and the price per kWh and term you would accept.

Then enter it in: Energy step: price the heat buyer pays per kWh

How to check: Secure the feedstock supply in writing
  1. List every stream you do not produce yourself: supplier, tonnes per month, season and contract term.
  2. Get letters of intent or contracts for at least the loan period, and size the plant on the tonnage that is signed, not promised.
Request to send
Request for a feedstock supply agreement
Site: Germany. A biogas plant would take:
- maize silage (energy crop): 8,200 t/year, DM ≈ 33.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Lab test of the methane yield (BMP)
  1. Take 3–5 subsamples of each stream over 2–4 weeks, mix them, keep them at 4 °C and deliver within 24 h.
  2. Order dry matter (DM), volatile solids (VS) and a methane potential test (BMP, VDI 4630) with the cellulose control reported.
  3. A valid test reports cellulose at 340–395 NL CH₄/kg VS; ask for a repeat otherwise.
Request to send
Request for quotation: biogas potential analysis
Site: Germany.
Feedstock (screening values, to be confirmed):
- maize silage (energy crop): 8,200 t/year, DM ≈ 33.0 %
- dairy cattle slurry: 4,500 t/year, DM ≈ 11.4 %
Design basis from the screening: raw biogas ≈ 230 Nm³/h at ≈ 52 % CH₄; digester working volume ≈ 2,300 m³; combined heat and power ≈ 470 kWe; new digestate storage ≈ 1,100 m³.
Per sample please quote: dry matter (DM, % of fresh mass), volatile solids (VS, % of DM) and biochemical methane potential (BMP, NL CH₄ per kg VS) to VDI 4630, with the cellulose control result and the test duration. Please state price, turnaround time and sampling and shipping instructions.

Then enter it in: Feedstock step: DM, VS and BMP on each stream

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Electricity value at NPV = 0
€0.227/kWh
now €0.0948/kWh
Highest installed cost at NPV = 0
not reachable
now €3.2M
Feedstock price headroom
€33.4/t
needs €33.4 per tonne less cost, or a gate fee, on every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-€6M
Median NPV
-€5.3M
NPV P90 (1 in 10 better)
-€4.7M
Chance that NPV > 0
< 1 %
Median payback
no payback

Reality check: on 41 operating US farm digesters, reported power output was 0.3–1.6 × this model's estimate for 8 in 10 plants (EPA AgSTAR, self-reported). Until feedstock is weighed and lab-tested, one plant can miss the forecast by that much — more than the range above shows.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: -4.8M)

  1. Energy prices −20 %-950K
  2. CAPEX +20 %-780K
  3. Useful heat (economic) −50 %-650K
  4. CH₄ −20 %-550K
  5. Maintenance +30 %-360K
  6. CHP downtime +10 pp-320K
  7. Feedstock transport +50 %-94K
  8. Feedstock potential −20 %310K
NPV = 0 if CAPEX falls by
not reachable
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
101 %
relative to the base case

Scenarios

Route: CHP (power + heat). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€490K
  • Electricity sales280K
  • Useful heat (economic)120K
  • Incremental digestate value46K
  • Electricity self-consumption savings40K
OPEX / yr€610K
  • Feedstock purchase, net of gate fees380K
  • Staff59K
  • CHP service and overhaul reserve58K
  • Maintenance48K
Operating margin (EBITDA)-€120K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr1,438.51,822.51,940
CAPEX€3.8M€3.2M€2.9M
OPEX / yr€640K€610K€580K
Revenue + savings / yr€320K€490K€580K
Operating margin (EBITDA)-€320K-€120K€9.3K
Simple paybackno paybackno payback> 25 yr
Discounted paybackno paybackno paybackno payback
NPV-€7.6M-€4.8M-€3.1M
IRR———
DSCR (min)-1.3-0.7-0.1

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).

Cumulative cash flow, €
-10M-7.7M-4.9M-2.2M590K03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) chosen€3.2M-€120Kno payback-€4.8M-€7.6M … -€3.1M
Boiler (heat only) €2.3M-€430Kno payback-€7.3M-€8.9M … -€6.2M
Biomethane €4.2M-€200Kno payback-€6.9M-€11M … -€2.9M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 213 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 6,300CHP (power + heat)240€1.8M-€2.1M
× 0.75 9,500CHP (power + heat)360€2.5M-€3.4M
× 1 your input13,000CHP (power + heat)470€3.2M-€4.8M
× 1.5 19,000CHP (power + heat)760€5M-€7.9M
× 2 25,000CHP (power + heat)1,000€6.5M-€11M
× 3 38,000CHP (power + heat)1,500€9.5M-€17M

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

Schemes are running, but your project does not meet their conditions

Main obstacle — EEG 2023 Güllekleinanlage: Manure other than poultry manure is 36 % of the fresh mass; the scheme requires at least 80 %. Details ↓

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Country overviewchecked 30 Oct 2026

Small manure plants ≤ 150 kW get a fixed EEG rate (≈ 20 ct/kWh, 20 years, ≥ 80 % manure); larger plants bid in tenders (2026 average award 18.5 ct/kWh) with a flexible-operation duty.

Open for applications (1)

You can apply now on the published terms.

EEG 2023 Güllekleinanlage

Open
Electricity tariff
Does not qualify
Manure other than poultry manure is 36 % of the fresh mass; the scheme requires at least 80 %.

Not calculated: the project does not meet the conditions.

Conditions
  • not met: Electrical capacity up to 150 kW (project ≈ 470 kW)
  • not met: Manure other than poultry manure: at least 80 % of fresh mass (project 36 %)
  • met: CHP of a practical size, from 25 kW (project ≈ 470 kW)
What the case uses
  • Route: CHP (power + heat)
  • Tariff: €0.202/kWh
Scheme terms

Commissioned 1.7.2026–30.6.2027: 21.67 ct (≤ 75 kW) / 18.72 ct (75–150 kW); 20 years; ≥ 80 % manure (no poultry); unpaid in negative-price hours.

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Source: EEG 2023 §44, §44a (gesetze-im-internet.de): 22/19 ct − 0.5 % each 1 July from 2024 · checked 30 Oct 2026 · Data confidence: Medium

Running, awarded by competition (1)

Support goes to the winners of a round or auction. The case assumes an award at the stated value.

EEG Ausschreibung Biomasse

Competitive
Electricity tariff
Does not qualify
Maize and cereal grain are 64 % of the fresh mass; the scheme allows at most 25 %.

Not calculated: the project does not meet the conditions.

Conditions
  • met: Electrical capacity from 150 kW (project ≈ 470 kW)
  • not met: Maize and cereal grain: at most 25 % of fresh mass (project 64 %)
  • met: CHP of a practical size, from 25 kW (project ≈ 470 kW)
Not checked by the model — confirm with the operator:
  • no data: Flexible design: engines and gas storage sized for the paid hours (extra CAPEX not costed)
What the case uses
  • Route: CHP (power + heat)
  • Tariff: €0.18/kWh
Scheme terms

Pay-as-bid; April 2026 average award 18.46 ct, ceiling 19.43 ct (new); paid only for 11 680 quarter-hours a year (≈ 2 920 full-load h; 16 000 ≈ 4 000 h up to 350 kW), the rest at market value; maize + grain ≤ 25 % by mass; the flexible design (extra engine capacity, gas storage) is not costed.

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Source: BNetzA press releases 2026-06-09 and 2026-11-03 (bid dates 01.04 / 01.10.2026; October average 18.75 ct, 13.95–19.80, undersubscribed); EEG §39 · checked 30 Oct 2026 · Data confidence: Medium

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

51/100

Of every 100 kWh of energy in the methane, 51 become a product that earns money or replaces a purchase.

100 % = 9,500 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Electricity sold to the grid3,200 MWh 33 %
  • Electricity used on site210 MWh 2 %
  • Heat for a user1,400 MWh 15 %

Runs the plant

  • Plant’s own electricity300 MWh 3 %
  • Digester heating430 MWh 5 %

Produced, not used

  • Heat with no buyer2,000 MWh 21 %

Losses

  • Conversion losses (engine, boiler)1,700 MWh 18 %
  • Gas sent to the flare110 MWh 1 %
  • Methane leaks140 MWh 1 %

What this means for the project

  • 2,000 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income. At the heat value used in this case that is about €170K a year.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Engine efficiency: electricity / heat
40 % / 46 %Assumption
Heat need
1,800 MWhYour data
Site electricity use
250 MWhYour data
Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
2,600 – 3,600 MWhCalculated

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 5 % of that month’s methane energy, in August 4 %.

January: methane energy 790 MWh · digester heating 44 MWh (5 %) · heat for a user 120 MWh

  • Methane energy of the month
  • Digester heating
  • Heat for a user

How it works: from feedstock to products

  1. Feedstock13,000 t/yr
  2. Biogas1.8M Nm³/yr
  3. Electricity3,400 MWh
  4. Useful heat1,400 MWh
  5. Heat without demand2,000 MWh
  6. Digestate10,000 t/yr
Heat produced (gross)
3,873 MWh
Digester heat demand
435 MWh
Useful heat (economic)
1,440 MWh of 3,438
Power: own use / sold
212 / 3,159 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
97 g CO₂e/MJ
open digestate storage
Fossil comparator
183 g CO₂e/MJ
Greenhouse-gas saving
47 %
RED minimum: 80 %
Avoided emissions
1,286 t CO₂e
  • Below the RED minimum: a gas-tight digestate store, off-gas combustion or more manure in the mix raise the saving.
  • Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
94/100
  • Energy equivalent ≈ 470 kWe (scale score 93/100)
  • Feedstock energy ≈ 750 kWh of methane per tonne (score 82/100)
  • Feedstock available 12 of 12 months
Energy fit
52/100
  • Own consumption absorbs 6 % of the electricity produced
  • Useful heat 1440 MWh of 3438 MWh available after digester needs
Location & logistics
100/100
  • No critical site constraints found from your answers
Technical feasibility
100/100
  • Standard layout for this scale, no critical obstacles
Economics
0/100
  • Operating margin ≤ 0 — no payback
  • Base-case NPV is negative
  • Minimum DSCR -0.66 — below the usual bank threshold of 1.2–1.3
Regulatory complexity
23/100 risk
  • Number and weight of permitting / regulatory steps: 10 points (more = harder)
Environmental risk
24/100 risk
  • Expected methane loss 2.5 % (good practice ≤ 2 %)
Overall project viability
40/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Capped at 40: weak economics is not offset by other factors.
  • Strongest: Location & logistics (100); weakest: Economics (0).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Maize silage (energy crop)delivered 4 km8,16333106.64 %≈ 155 km
Dairy cattle slurry4,50011.418.2on site≈ 20 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Wet mesophilic digestion with solids feeding

CSTR with a solids feeder and recirculation, or horizontal plug-flow for dairy manure

Working volume
≈ 2,300 m³
Retention time
67 days
Loading rate
3.5 kg VS/(m³·d)
Digestate storage
≈ 5,100 m³
  • Dry matter 25 % is above the pumpable limit without a solids feeder (12 %).
  • Continuous feed — continuous operation gives steady gas and the simplest control.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Two-stage layout (main + post-digester) for stability with fats or larger flows.
Alternatives
  • Horizontal plug-flow (good for 10–14 % DM cattle manure)

Climate: Lower Saxony (Vechta), mean 10.9 °C, ≈ 2,637 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 1.5 °C), Copenhagen (DK) (Δ 1.5 °C), Prague (CZ) (Δ 2 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan1,07579444122286
Feb97972339111261
Mar1,07579441122286
Apr1,04076837118277
May1,07579434122286
Jun1,04076830118277
Jul1,07579430122286
Aug1,07579430122286
Sept1,04076832118277
Oct1,07579436122286
Nov1,04076840118277
Dec1,07579443122286
Σ12,6639,3514351,4403,372
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester430K
Covering existing storage70K
New open storage68K
Feedstock reception and preparation95K
Bunker silo for the crop harvest690K
Gas handling and cleaning57K
CHP (power + heat)770K
Heat network79K
Backup boiler3.4K
Electrical systems and controls140K
Pipework90K
Civil works140K
Grid connection48K
Engineering and permits210K
Contingency290K
Total3.2M
OPEX / yr (EUR)
Staff59K
CHP service and overhaul reserve58K
Maintenance48K
Insurance16K
Testing and monitoring5K
Feedstock purchase, net of gate fees380K
Feedstock transport17K
Digestate handling25K
Total610K
Revenue + savings / yr (EUR)
Electricity self-consumption savings40K
Electricity sales280K
Useful heat (economic)120K
Incremental digestate value46K
Total490K

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: asset · 10,260 t/yr · nitrogen ≈ 61,409 kg/yr · land needed ≈ 361 ha (available 450 ha).

Incremental fertiliser value €46K/yr, handling €25K/yr, net €22K/yr.

  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 2.5 % of methane produced (range 1.5 % – 4 %) ≈ 460 t CO₂e/yr; fossil emissions displaced ≈ 1,404 t CO₂/yr. Losses vs benefit: 33 %.

  • Expected loss 2.5 % is above good practice (2 %): budget for monitoring.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Building permit and environmental permit; EIA screening (Directive 2011/92/EU as transposed)
    New installation · effort: medium · to verify
  • Nitrates Directive (91/676/EEC): 170 kg N/ha from organic manures in vulnerable zones; closed spreading periods
    Digestate is spread on land · effort: medium · confirmed
  • ATEX hazardous-area zoning (Directives 2014/34/EU, 1999/92/EC)
    Methane in the gas phase · effort: medium · confirmed
  • Medium Combustion Plant Directive (2015/2193): registration and emission limits for CHP ≥ 1 MW thermal input
    CHP above 1 MWth input · effort: medium · to verify
  • Grid-connection agreement with the DSO and generator registration
    Surplus electricity is exported · effort: medium · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (168)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: Small manure plants ≤ 150 kW get a fixed EEG rate (≈ 20 ct/kWh, 20 years, ≥ 80 % manure); larger plants bid in tenders (2026 average award 18.5 ct/kWh) with a flexible-operation duty.
  • Mature market (≈ 9 300 CHP plants): German economics are tariff-driven — compare the support case with the no-support verdict.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

chp: local CAPEX factor
0.7 … 1.3 —
NPV low…high: -€5.9M … -€3.6M
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.05 … 0.08 —
NPV low…high: -€4.9M … -€4.6M
Mineral potassium price
0.713 … 0.8099 EUR/kg K₂O
NPV low…high: -€4.8M … -€4.8M
Mineral nitrogen price
1.045 … 1.818 EUR/kg N
NPV low…high: -€4.8M … -€4.7M
Mineral phosphorus price
1.419 … 1.847 EUR/kg P₂O₅
NPV low…high: -€4.8M … -€4.8M
Avoidable share of an unsplit customer electricity bill
0.7 … 1 —
NPV low…high: -€4.9M … -€4.7M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.6925 EUR/Nm³ · CALCULATED_VALUE · LOW
CALCULATION: TTF 46.49 €/MWh HHV × 1.11 HHV/LHV + 20 €/MWh LHV green-gas premium (engineering assumption, no official GO price); World Bank Pink Sheet (2026-10-02), Natural gas Europe (TTF), mean Q4 2025 – Q3 2026 15.25 $/mmbtu GCV ÷ 0.2931 MWh/mmbtu at 1.1193 USD/EUR; × 9.6709 kWh LHV/Nm³. No guaranteed offtake or certificate eligibility.
2025-10 / 2026-09 · checked 2026-11-11 · Grid-injected biomethane, HHV prices converted to LHV; without feed-in tariffs, quotas or tax relief
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
chp: local CAPEX factor: 1 — · CALCULATED_VALUE · MEDIUM
0.72 traded equipment + 0.28 × local/German labour cost (31.5/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.045 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 9.43 EUR/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 3.72 EUR/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.06 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.00 % (Aaa; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.1043 EUR/kWh · MARKET_DATA · HIGH
ENTSO-E day-ahead (via Energy-Charts), zone DE-LU, average 104.3 €/MWh, 2025-10-01 – 2026-10-01
2025-10-01 / 2026-10-01 · checked 2026-10-30 · Wholesale bidding zone DE-LU; not a guaranteed export PPA
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 1 EUR/EUR · MARKET_DATA · HIGH
Euro
CONSTANT: EUR reporting currency; no currency conversion
Value of useful heat (displaced gas / boiler efficiency): 0.08411 EUR/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 75.70200000000001 €/MWh LHV ÷ 0.9
2026-S1 · checked 2026-10-31 · GJ10000-99999; reference band, customer gas use unknown
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 45 EUR/h · MARKET_DATA · HIGH
Eurostat lc_lci_lev: hourly labour cost (wages + employer costs), industry, construction & services, 2025
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.154 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 1.23 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.22 EUR/kWh · USER_INPUT · MEDIUM
USER_INPUT 0.22 EUR/kWh / FX 1; Euro. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
maize_silage: dry matter: 33 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified