Sample report · Czechia

Brewery · Brewer's spent grain: 300 t/yr

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

A South Moravian minibrewery — one of about 520 in Czechia — asks whether it could make energy from its spent grain. The grain already goes to local farmers as feed.

Operating assumptions

  • Brewer's spent grain: 300 t/yr · DM: 23 % · 12 months · We sell it (e.g. as feed) · What you sell it for today: 400 CZK/t
  • Electricity: 150,000 kWh/yr · Electricity price on your bill (if known): 4.3 CZK/kWh
  • All year: hot water, steam, process · We use natural gas: 40,000 m³/yr
  • Land available for spreading digestate: 0 ha · Distance to the gas grid (for biomethane): —
  • Grid connection? Yes

What to verify

Keep the feed outlet to local farmers; check heat recovery from wort boiling and cooling in the brewhouse instead.

Not recommended at this scale

For this amount of feedstock a stand-alone plant makes no economic sense.

  • Energy equivalent ≈ 9 kWe — below 25 kW — and the base-case NPV is negative (-€520K).

Main reason — small scale: the feedstock supports only ≈ 9 kW, while the plant costs ≈ €33K per kW. Digester, storage and CHP are expensive even at small capacity.

What would change the verdict
  • → Consider the simplest option — a biogas boiler for a constant heat need — or supplying feedstock to a larger plant.
  • → Add energy-dense wastes (co-substrate) or pool feedstock with neighbours (cluster plant).

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

A clear no under these conditions: even the optimistic case does not pay back. Don't spend money on a feasibility study unless one of the changes above happens.

NPV: conservative -€690K · base -€520K · optimistic -€400K

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in < 1 % of cases.

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
€270K – €350K
≈ CZK 7.2M (base)
Payback
no payback
base: no payback · no subsidies
NPV (base)
-€520K
range: -€690K … -€400K
Chosen route
Boiler (heat only)
Confidence: Medium

Feedstock and energy

Feedstock potential
300 t/yr
energy ≈ 675 kWh CH₄/t
Biogas
29K – 42K Nm³/yr
≈ 4 Nm³/h (base)
Net energy
79 – 190 MWh/yr
Useful heat
Candidate capacity
9 kWe
micro (< 50 kW)

How far you can rely on these numbers

Medium · 69/100
  • Backed by your data and our sources69
  • You can still add+13
  • Limits of our data−8
  • Needs a feasibility study (lab, quotes, contracts)10

69/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainLaboratory DM, VS and BMP results for every feedstock streamLarge effectSend a sample to a laboratory: dry matter and VS take a few days, BMP several weeks+13

With all of it: up to 82/100

Limits on our side

  • Scale outside the CAPEX calibration range (30 kW – 5 MW electrical equivalent)−8

These come from our country price and cost data or the screening scope, not from your project. We update them.

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • In this configuration the digestate is a cost rather than an asset.
Country conditions
  • For existing plants, the key question is life after the tariff: CHP on own use vs conversion to biomethane.

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Get supplier quotes for the plant-€630K … -€410K—
Lab test of the methane yield (BMP)-€530K … -€470K—
Confirm a reliable heat buyer and demand-€550K … -€500K—
Verify the market price-€540K … -€490K—
Fix feedstock prices and gate fees in contracts-€530K … -€510K—
How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Czechia.
Feedstock (screening values, to be confirmed):
- brewer's spent grain: 300 t/year, DM ≈ 23.0 %
Design basis from the screening: raw biogas ≈ 4 Nm³/h at ≈ 59 % CH₄; digester working volume ≈ 51 m³; biogas boiler ≈ 20 kWth; new digestate storage ≈ 130 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Lab test of the methane yield (BMP)
  1. Take 3–5 subsamples of each stream over 2–4 weeks, mix them, keep them at 4 °C and deliver within 24 h.
  2. Order dry matter (DM), volatile solids (VS) and a methane potential test (BMP, VDI 4630) with the cellulose control reported.
  3. A valid test reports cellulose at 340–395 NL CH₄/kg VS; ask for a repeat otherwise.
Request to send
Request for quotation: biogas potential analysis
Site: Czechia.
Feedstock (screening values, to be confirmed):
- brewer's spent grain: 300 t/year, DM ≈ 23.0 %
Design basis from the screening: raw biogas ≈ 4 Nm³/h at ≈ 59 % CH₄; digester working volume ≈ 51 m³; biogas boiler ≈ 20 kWth; new digestate storage ≈ 130 m³.
Per sample please quote: dry matter (DM, % of fresh mass), volatile solids (VS, % of DM) and biochemical methane potential (BMP, NL CH₄ per kg VS) to VDI 4630, with the cellulose control result and the test duration. Please state price, turnaround time and sampling and shipping instructions.

Then enter it in: Feedstock step: DM, VS and BMP on each stream

How to check: Confirm a reliable heat buyer and demand
  1. Confirm the buyer's monthly heat demand and the temperature they need.
  2. Agree a price per kWh linked to their current fuel, and a term of at least the loan period.
Request to send
Offer of renewable heat
Site: Czechia. A biogas plant can supply ≈ 160 MWh of heat a year (hot water, ≈ 80–90 °C) all year round. Please tell us your monthly heat use, the temperature you need, your current fuel and its price, and the price per kWh and term you would accept.

Then enter it in: Energy step: price the heat buyer pays per kWh

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Fix feedstock prices and gate fees in contracts
  1. For every purchased stream and every gate fee, note today's price and its range over the last three years.
  2. Fix prices or gate fees with indexation for the loan period, and check that the plan still pays with prices 25 % worse.
Request to send
Request for a feedstock supply agreement
Site: Czechia. A biogas plant would take:
- brewer's spent grain: 300 t/year, DM ≈ 23.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Heat price at NPV = 0
€0.459/kWh th
now €0.0786/kWh th
Highest installed cost at NPV = 0
not reachable
now €300K
Feedstock price headroom
€158/t
needs €158 per tonne less cost, or a gate fee, on every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-€590K
Median NPV
-€550K
NPV P90 (1 in 10 better)
-€510K
Chance that NPV > 0
< 1 %
Median payback
no payback

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, € (base: -520K)

  1. CAPEX +20 %-75K
  2. Useful heat (economic) −50 %-54K
  3. CH₄ −20 %-24K
  4. Maintenance +30 %-19K
  5. Energy prices −20 %-19K
  6. Feedstock potential −20 %-9.5K
  7. Feedstock transport +50 %0
  8. CHP downtime +10 pp0
NPV = 0 if CAPEX falls by
not reachable
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
not reachable
relative to the base case

Scenarios

Route: Boiler (heat only). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yr€10K
  • Useful heat (economic)10K
OPEX / yr€30K
  • Staff10K
  • Maintenance5.9K
  • Testing and monitoring5K
  • Foregone alternative revenue4.9K
Operating margin (EBITDA)-€20K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr28.634.441.6
CAPEX€350K€300K€270K
OPEX / yr€35K€30K€28K
Revenue + savings / yr€5.3K€10K€17K
Operating margin (EBITDA)-€30K-€20K-€11K
Simple paybackno paybackno paybackno payback
Discounted paybackno paybackno paybackno payback
NPV-€690K-€520K-€400K
IRR———
DSCR (min)-1.1-0.9-0.6

Pre-tax, nominal EUR, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 50 % debt (no taxes).

Cumulative cash flow, €
-950K-700K-450K-200K54K03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) €350K-€19Kno payback-€570K-€750K … -€450K
Boiler (heat only) chosen€300K-€20Kno payback-€520K-€690K … -€400K
Biomethane €960K-€40Kno payback-€1.4M-€1.8M … -€1.2M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 4 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 150Boiler (heat only)4€270K-€510K
× 0.75 230Boiler (heat only)7€280K-€510K
× 1 your input300Boiler (heat only)9€300K-€520K
× 1.5 450Boiler (heat only)13€310K-€530K
× 2 600Boiler (heat only)18€330K-€540K
× 3 900CHP (power + heat)25€470K-€610K

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

Schemes are running, but your project does not meet their conditions

Main obstacle — Aukce MPO – provozní podpora biometanu: Raw biogas ≈ 4 Nm³/h is below the practical upgrading minimum (60 Nm³/h) — consider a cluster. Details ↓

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Country overviewchecked 30 Oct 2026

No operating support for new biogas CHP. New biomethane plants bid in MPO auctions for a 15-year premium that tops the monthly gas price up to their bid: the first round (8 Sep 2026) awarded 11 bids at 2 346–2 879 CZK/MWh HHV; the next round is not yet announced.

Running, awarded by competition (1)

Support goes to the winners of a round or auction. The case assumes an award at the stated value.

Aukce MPO – provozní podpora biometanu

Competitive
Biomethane support
Does not qualify
Raw biogas ≈ 4 Nm³/h is below the practical upgrading minimum (60 Nm³/h) — consider a cluster.

Not calculated: the project does not meet the conditions.

Conditions
  • met: Biomethane injected into the gas grid (included in the case)
  • not met: Raw biogas for upgrading from 60 Nm³/h (project ≈ 4 Nm³/h)
What the case uses
  • Route: Biomethane
  • Biomethane price: €1.25/Nm³
Scheme terms

15-year premium up to the bid price on gas fed into the grid; 2026 winners 2 346–2 879 CZK/MWh HHV (median 2 845 ≈ €1.25/Nm³ used); commissioning by 31.12.2029; next round not announced.

Next step: Not available for the project as designed. Rely on it only if a design change removes the obstacle, and re-run the screening with that change.

Source: MPO, Zpráva o vyhodnocení nabídek, 1. aukce biometan 2026 (8.9.2026): 11 winners 2 346–2 879 CZK/MWh HHV, ceiling 3 000, 45 M Nm³/yr; zákon 165/2012 Sb. §27bd · checked 30 Oct 2026 · Data confidence: Medium

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

65/100

Of every 100 kWh of energy in the methane, 65 become a product that earns money or replaces a purchase.

100 % = 200 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Heat for a user130 MWh 65 %

Runs the plant

  • Digester heating15 MWh 8 %

Produced, not used

  • Heat with no buyer33 MWh 16 %

Losses

  • Conversion losses (engine, boiler)20 MWh 10 %
  • Methane leaks3 MWh 2 %

What this means for the project

  • 33 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income. At the heat value used in this case that is about €2.6K a year.
  • The plant buys 6.4 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Heat need
40,000 m³Your data
Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
79 – 190 MWhCalculated

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 10 % of that month’s methane energy, in July 5 %.

January: methane energy 17 MWh · digester heating 1.7 MWh (10 %) · heat for a user 11 MWh

  • Methane energy of the month
  • Digester heating
  • Heat for a user

How it works: from feedstock to products

  1. Feedstock300 t/yr
  2. Biogas34K Nm³/yr
  3. Useful heat130 MWh
  4. Heat without demand33 MWh
  5. Digestate260 t/yr
Heat produced (gross)
179 MWh
Digester heat demand
15 MWh
Useful heat (economic)
131 MWh of 164
Power: own use / sold
0 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
63 g CO₂e/MJ
open digestate storage
Fossil comparator
80 g CO₂e/MJ
Greenhouse-gas saving
21 %
RED minimum: 80 %
Avoided emissions
8 t CO₂e
  • Below the RED minimum: a gas-tight digestate store, off-gas combustion or more manure in the mix raise the saving.
  • Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.
  • Residues other than manure, maize and food waste use the RED biowaste values.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
59/100
  • Energy equivalent ≈ 9 kWe (scale score 7/100)
  • Feedstock energy ≈ 675 kWh of methane per tonne (score 79/100)
  • Feedstock available 12 of 12 months
Energy fit
80/100
  • Own consumption absorbs 0 % of the electricity produced
  • Useful heat 131 MWh of 164 MWh available after digester needs
Location & logistics
75/100
  • Not enough land for the digestate
Technical feasibility
55/100
  • Energy equivalent below 25 kWe: hardly sensible technically
Economics
0/100
  • Operating margin ≤ 0 — no payback
  • Base-case NPV is negative
  • Minimum DSCR -0.92 — below the usual bank threshold of 1.2–1.3
Regulatory complexity
5/100 risk
  • Number and weight of permitting / regulatory steps: 6 points (more = harder)
Environmental risk
35/100 risk
  • Expected methane loss 1.5 % — within good practice if gas-tight and monitored
  • Surplus digestate: risk of nitrogen over-application
Overall project viability
40/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Capped at 40: weak economics is not offset by other factors.
  • Strongest: Regulatory complexity (95); weakest: Economics (0).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Brewer's spent grain3002367.7on site≈ 162 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Wet mesophilic digestion with solids feeding

CSTR with a solids feeder and recirculation, or horizontal plug-flow for dairy manure

Working volume
≈ 51 m³
Retention time
61.8 days
Loading rate
3.5 kg VS/(m³·d)
Digestate storage
≈ 130 m³
  • Dry matter 23 % is above the pumpable limit without a solids feeder (12 %).
  • Continuous feed — continuous operation gives steady gas and the simplest control.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Single stage plus a gas-tight digestate store as post-digester: sufficient at this scale.
Alternatives
  • Horizontal plug-flow (good for 10–14 % DM cattle manure)

Climate: South Moravia (Brno), mean 11.1 °C, ≈ 2,768 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 1.2 °C), Prague (CZ) (Δ 1.3 °C), Kraków (PL) (Δ 1.8 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan25172110
Feb23151100
Mar25172110
Apr25161110
May25171110
Jun25161110
Jul25171110
Aug25171110
Sept25161110
Oct25171110
Nov25161110
Dec25172110
Σ300199151310
CAPEX, OPEX, revenue (base case)
CAPEX (EUR)
Digester17K
New covered storage6.3K
New open storage3.4K
Feedstock reception and preparation130K
Gas handling and cleaning26K
Boiler (heat only)1.9K
Heat network23K
Electrical systems and controls12K
Pipework8.3K
Civil works12K
Grid connection8.4K
Engineering and permits20K
Contingency27K
Total300K
OPEX / yr (EUR)
Staff10K
Maintenance5.9K
Insurance1.5K
Testing and monitoring5K
Foregone alternative revenue4.9K
Digestate handling1.4K
Purchased electricity1.1K
Total30K
Revenue + savings / yr (EUR)
Useful heat (economic)10K
Total10K

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: liability / cost · 258 t/yr · nitrogen ≈ 2,280 kg/yr · land needed ≈ 13 ha (available 0 ha).

Incremental fertiliser value €0/yr, handling €1.4K/yr, net -€1.4K/yr.

  • Not enough land: ≈ 13 ha needed at 170 kg N/ha. Surplus digestate is a cost (agreements with neighbours, separation, pelletising).
  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 1.5 % of methane produced (range 0.5 % – 3 %) ≈ 6 t CO₂e/yr; fossil emissions displaced ≈ 26 t CO₂/yr. Losses vs benefit: 22 %.

  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Building permit and environmental permit; EIA screening (Directive 2011/92/EU as transposed)
    New installation · effort: medium · to verify
  • Nitrates Directive (91/676/EEC): 170 kg N/ha from organic manures in vulnerable zones; closed spreading periods
    Digestate is spread on land · effort: medium · confirmed
  • ATEX hazardous-area zoning (Directives 2014/34/EU, 1999/92/EC)
    Methane in the gas phase · effort: medium · confirmed
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (163)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: No operating support for new biogas CHP. New biomethane plants bid in MPO auctions for a 15-year premium that tops the monthly gas price up to their bid: the first round (8 Sep 2026) awarded 11 bids at 2 346–2 879 CZK/MWh HHV; the next round is not yet announced.
  • For existing plants, the key question is life after the tariff: CHP on own use vs conversion to biomethane.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

boiler: local CAPEX factor
0.588 … 1.092 —
NPV low…high: -€630K … -€410K
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.054 … 0.084 —
NPV low…high: -€540K … -€490K
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.6925 EUR/Nm³ · CALCULATED_VALUE · LOW
CALCULATION: TTF 46.49 €/MWh HHV × 1.11 HHV/LHV + 20 €/MWh LHV green-gas premium (engineering assumption, no official GO price); World Bank Pink Sheet (2026-10-02), Natural gas Europe (TTF), mean Q4 2025 – Q3 2026 15.25 $/mmbtu GCV ÷ 0.2931 MWh/mmbtu at 1.1193 USD/EUR; × 9.6709 kWh LHV/Nm³. No guaranteed offtake or certificate eligibility.
2025-10 / 2026-09 · checked 2026-11-11 · Grid-injected biomethane, HHV prices converted to LHV; without feed-in tariffs, quotas or tax relief
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
boiler: local CAPEX factor: 0.84 — · CALCULATED_VALUE · MEDIUM
0.72 traded equipment + 0.28 × local/German labour cost (13.9/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.049 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.5 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 7 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 5.56 EUR/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 2.31 EUR/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.064 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.74 % (Aa3; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.1125 EUR/kWh · MARKET_DATA · HIGH
ENTSO-E day-ahead (via Energy-Charts), zone CZ, average 112.5 €/MWh, 2025-10-01 – 2026-10-01
2025-10-01 / 2026-10-01 · checked 2026-10-31 · Wholesale bidding zone CZ; not a guaranteed export PPA
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 24.37 CZK/EUR · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-09
2026-11-09 · checked 2026-11-10 · CZK per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Value of useful heat (displaced gas / boiler efficiency): 0.07856 EUR/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 70.70700000000002 €/MWh LHV ÷ 0.9
2026-S1 · checked 2026-10-31 · GJ1000-9999; annual gas input converted to GJ HHV with assumed calorific value
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 19.8 EUR/h · MARKET_DATA · HIGH
Eurostat lc_lci_lev: hourly labour cost (wages + employer costs), industry, construction & services, 2025
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.102 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 0.88 EUR/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.1765 EUR/kWh · USER_INPUT · MEDIUM
USER_INPUT 4.3 CZK/kWh / FX 24.365; Official EUR reference rate, 2026-11-09. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified