Sample report · Canada

Dairy farm · Dairy cattle slurry: 7,200 t/yr · Grease-trap fat: 3,000 t/yr · Fruit & vegetable residues: 4,000 t/yr

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

An Ontario dairy co-digests manure with off-farm FOG and food-processing residues for tipping fees, as about 30 Ontario on-farm digesters did under the former feed-in tariff. Provincial rules keep at least half of the input on-farm.

Operating assumptions

  • Dairy cattle slurry: 7,200 t/yr · DM: 8.5 % · 12 months
  • Grease-trap fat: 3,000 t/yr · DM: 15 % · 12 months · Other / don't know · Delivered from another site: 60 km · Purchase price / gate fee: -90 CAD/t
  • Fruit & vegetable residues: 4,000 t/yr · DM: 12 % · 12 months · Other / don't know · Delivered from another site: 40 km · Purchase price / gate fee: -50 CAD/t
  • Electricity: 600,000 kWh/yr · Electricity price on your bill (if known): 0.17 CAD/kWh
  • All year: hot water, steam, process · Heat needed per year (if known): 400,000 kWh/yr
  • Land available for spreading digestate: 500 ha · Distance to the gas grid (for biomethane): 5 km
  • Existing lagoon / store that could be covered: 8,000 m³
  • Grid connection? Yes

What to verify

Confirm tipping-fee contracts, the off-farm material schedule, the RNG offtake option and grid connection.

Possible with conditions

It can pay off, but only if the key conditions hold — confirm them in a feasibility study.

  • Base NPV positive (US$430K), payback ≈ 8.1 yrs.
  • Conservative-case NPV is negative (-US$880K) — sensitive to key assumptions.

Largest benefit — “digestate fertiliser value (incremental)”: ≈ 69 % of all revenue and savings.

What would change the verdict
  • → Secure long-term heat and power offtake; benchmark CAPEX with 3–5 suppliers.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

Grey zone: the answer flips between the conservative and the optimistic case. Before paying for a feasibility study, check these first:

NPV: conservative -US$880K · base US$430K · optimistic US$880K

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in 71 % of cases.

  1. Secure the feedstock supply in writing · Feedstock potential −20 % (-US$530K)
  2. Feedstock transport +50 % (-US$360K)
  3. Get supplier quotes for the plant · CAPEX +20 % (-US$330K)

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

To reach a bankable estimate (±15 %)
  1. Laboratory methane-potential (BMP) test of 2–3 feedstock samples — ≈ US$336–US$895 each
  2. 2–3 supplier quotes for the plant
  3. Letters of intent for feedstock supply and for heat, power or biomethane offtake
  4. Then a feasibility study with permits and financing (±15 %)
From screening to construction

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
US$1.1M – US$1.5M
≈ CA$1.8M (base)
Payback
6.1 yr – 24.5 yr
base: 8.1 yr · no subsidies
NPV (base)
US$430K
range: -US$880K … US$880K
Chosen route
Boiler (heat only)
Confidence: Medium

1 EUR = 1.1193 USD · ECB · 2026-11-09

Feedstock and energy

Feedstock potential
14,000 t/yr
energy ≈ 362 kWh CH₄/t
Biogas
660K – 900K Nm³/yr
≈ 104 Nm³/h (base)
Net energy
240 – 380 MWh/yr
Useful heat
Candidate capacity
230 kWe
small (50–250 kW)

How far you can rely on these numbers

Medium · 87/100
  • Backed by your data and our sources87
  • You can still add+3
  • Needs a feasibility study (lab, quotes, contracts)10

87/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainLaboratory DM, VS and BMP results for every feedstock streamSmall effectSend a sample to a laboratory: dry matter and VS take a few days, BMP several weeksValues equal to the typical ones shown in the form do not count as a laboratory result.+3

With all of it: up to 90/100

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Fats are 30 % of the organic matter: risk of foaming and long-chain fatty-acid inhibition; dose gradually.
  • Animal by-products (Cat. 3) → pasteurisation and veterinary approval required.
  • Fat-rich residues (grease, slaughter, fish, olive streams) make up over 25 % of the organic matter. Their lipid share is not catalogued — measure ether extract: above ≈ 30 % of VS the process is at high risk of failure.
  • "grease-trap fat": hauling 60 km eats ≈818 % of its energy value — build the plant at the source (rule of thumb: ≤ 0 km).
  • "fruit & vegetable residues": hauling 40 km eats ≈1656 % of its energy value — build the plant at the source (rule of thumb: ≤ 0 km).
  • In this configuration the digestate is a cost rather than an asset.
Compared with the market
Our estimate: ≈ 5,600 USD/kW at ≈ 228 kW
  • 3,806–8,395 USD/kW — Flexible plant, Germany · within rangeDBFZ / Fraunhofer IEE for BMWK (February 2024): €7,521 per kW rated (≈ €3,400 per kW installed) capacity · 2023 · Official study

Market figures are mostly trade press and supplier estimates, not audited budgets. Real prices come from 3–5 supplier quotes.

Country conditions
  • Cold winters and low power prices: RNG contracts are usually the business case.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Strong candidate”
  • Payback in the base case is 8.1 yr; it needs to be 6.5 yr or less.
  • The conservative case must stay profitable too (its NPV is -US$880K).
ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 3,000 MWh a year, valued at ≈ CA$0.0294 per kWh.
Possible with conditionsUS$1.1M+US$660Kheat ≥ CA$0.00287 per kWh
Order of action
  1. 1Verify first: Secure the feedstock supply in writing. Up to US$25K of this decision depends on it. →
  2. 2Find a heat buyer for ≈ 3,000 MWh a year (heat ≥ CA$0.00287 per kWh).
  3. 3Ask 3–5 suppliers for quotes: the project breaks even up to an investment of US$1.6M. →

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Secure the feedstock supply in writingcan change the answer-US$360K … US$430KUS$25K
Fix feedstock prices and gate fees in contractscan change the answer-US$490K … US$1.4MUS$24K
Get supplier quotes for the plantcan change the answer-US$62K … US$920KUS$160
Verify the market priceUS$210K … US$560K—
Check the fertiliser value of the digestateUS$400K … US$470K—
Confirm a reliable heat buyer and demandUS$410K … US$440K—
How to check: Secure the feedstock supply in writing
  1. List every stream you do not produce yourself: supplier, tonnes per month, season and contract term.
  2. Get letters of intent or contracts for at least the loan period, and size the plant on the tonnage that is signed, not promised.
Request to send
Request for a feedstock supply agreement
Site: Canada. A biogas plant would take:
- grease-trap fat: 3,000 t/year, DM ≈ 15.0 %
- fruit & vegetable residues: 4,000 t/year, DM ≈ 12.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Fix feedstock prices and gate fees in contracts
  1. For every purchased stream and every gate fee, note today's price and its range over the last three years.
  2. Fix prices or gate fees with indexation for the loan period, and check that the plan still pays with prices 25 % worse.
Request to send
Request for a feedstock supply agreement
Site: Canada. A biogas plant would take:
- grease-trap fat: 3,000 t/year, DM ≈ 15.0 %
- fruit & vegetable residues: 4,000 t/year, DM ≈ 12.0 %
Please confirm the tonnes per month you can deliver, the dry matter, the delivery season, the price or gate fee per tonne with its indexation, and the term you can commit to.

Then enter it in: Feedstock step: quantity and price of each delivered stream

How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Canada.
Feedstock (screening values, to be confirmed):
- dairy cattle slurry: 7,200 t/year, DM ≈ 8.5 %
- grease-trap fat: 3,000 t/year, DM ≈ 15.0 %
- fruit & vegetable residues: 4,000 t/year, DM ≈ 12.0 %
Design basis from the screening: raw biogas ≈ 100 Nm³/h at ≈ 62 % CH₄; digester working volume ≈ 1,500 m³; biogas boiler ≈ 520 kWth; new digestate storage ≈ 0 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

How to check: Confirm a reliable heat buyer and demand
  1. Confirm the buyer's monthly heat demand and the temperature they need.
  2. Agree a price per kWh linked to their current fuel, and a term of at least the loan period.
Request to send
Offer of renewable heat
Site: Canada. A biogas plant can supply ≈ 4,100 MWh of heat a year (hot water, ≈ 80–90 °C) all year round. Please tell us your monthly heat use, the temperature you need, your current fuel and its price, and the price per kWh and term you would accept.

Then enter it in: Energy step: price the heat buyer pays per kWh

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Heat price at NPV = 0
positive even if the product earns nothing
now US$0.0209/kWh th
Highest installed cost at NPV = 0
US$1.6M
now US$1.3M
Feedstock price headroom
US$2.67/t
can pay up to US$2.67 per tonne more for every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-US$120K
Median NPV
US$130K
NPV P90 (1 in 10 better)
US$380K
Chance that NPV > 0
71 %
Median payback
9.7 yr

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, USD (base: 430K)

  1. Feedstock potential −20 %-530K
  2. Feedstock transport +50 %-360K
  3. CAPEX +20 %-330K
  4. Maintenance +30 %-86K
  5. Useful heat (economic) −50 %-36K
  6. CH₄ −20 %-4.3K
  7. CHP downtime +10 pp0
  8. Energy prices −20 %30K
NPV = 0 if CAPEX falls by
already positive
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
already positive
relative to the base case

Flip the NPV sign: Feedstock potential −20 %.

Scenarios

Route: Boiler (heat only). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yrUS$21K
  • Incremental digestate value15K
  • Useful heat (economic)6.7K
OPEX / yr-US$140K
  • Feedstock transport63K
  • Staff35K
  • Maintenance25K
  • Digestate handling25K
Operating margin (EBITDA)US$160K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr655.4833.2899.9
CAPEXUS$1.5MUS$1.3MUS$1.1M
OPEX / yr-US$49K-US$140K-US$160K
Revenue + savings / yrUS$14KUS$21KUS$26K
Operating margin (EBITDA)US$62KUS$160KUS$190K
Simple payback24.5 yr8.1 yr6.1 yr
Discounted paybackno payback10.6 yr7.8 yr
NPV-US$880KUS$430KUS$880K
IRR-4 %10.3 %15 %
DSCR (min)0.51.52

Pre-tax, nominal USD, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 65 % debt (no taxes).

Cumulative cash flow, USD
-1.7M-730K290K1.3M2.3M03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) US$1.9MUS$210K8.9 yrUS$370K-US$1.2M … US$980K
Boiler (heat only) chosenUS$1.3MUS$160K8.1 yrUS$430K-US$880K … US$880K
Biomethane US$2.7MUS$160K16.6 yr-US$1M-US$3.4M … US$650K
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 92 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 7,100CHP (power + heat)110US$1.2MUS$96K
× 0.75 11,000Boiler (heat only)171US$1.1MUS$240K
× 1 your input14,000Boiler (heat only)228US$1.3MUS$430K
× 1.5 21,000Boiler (heat only)342US$1.9MUS$550K
× 2 28,000Boiler (heat only)456US$2.6MUS$440K
× 3 43,000Boiler (heat only)684US$4.1M-US$520K

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

There is a scheme, but support is awarded by competition

On the scheme's terms the NPV is above zero.

Best option: Utility RNG offtake (FortisBC, Énergir, Enbridge) Details ↓

NPV change
+US$630K
NPV with support
US$1.1M
Payback
7.6 yr
IRR
11 %

Next step: Prepare for the next round: permits are usually required before you bid, and an award is not guaranteed.

Country overviewchecked 30 Oct 2026

The RNG business case is utility offtake negotiated under regulated price caps (Québec ≤ 35 $2022/GJ per contract, BC ≤ $31/GJ from 2021/22, CPI-indexed); Clean Fuel Regulations credits and the Clean Technology ITC are uncertain extras. No electricity feed-in tariff.

Running, awarded by competition (1)

Support goes to the winners of a round or auction. The case assumes an award at the stated value.

Utility RNG offtake (FortisBC, Énergir, Enbridge)

Competitive
Biomethane support
Meets every condition we checked
NPV change
+US$630K
NPV with support
US$1.1M
Payback
7.6 yr
IRR
11 %
Conditions
  • met: Raw biogas for upgrading from 60 Nm³/h (project ≈ 92 Nm³/h)
What the case uses
  • Route: Biomethane
  • Biomethane price: US$0.694/Nm³
Scheme terms

Bilateral contracts under regulated caps: Québec average ≤ 25 $2022/GJ, per contract ≤ 35 $2022/GJ (Régie D-2026-037 kept it); BC ≤ $31/GJ (2021/22), CPI-indexed; CAD 25/GJ used.

Next step: Prepare for the next round: permits are usually required before you bid, and an award is not guaranteed.

Source: B.C. Reg. 102/2012 s.2.2, s.9 (last amended B.C. Reg. 145/2026); Régie de l'énergie D-2026-037 (R-4320-2025, 31.03.2026) · checked 30 Oct 2026 · Data confidence: Low

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

6/100

Of every 100 kWh of energy in the methane, 6 become a product that earns money or replaces a purchase.

100 % = 5,100 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Heat for a user320 MWh 6 %

Runs the plant

  • Digester heating460 MWh 9 %

Produced, not used

  • Heat with no buyer3,800 MWh 73 %

Losses

  • Conversion losses (engine, boiler)510 MWh 10 %
  • Methane leaks77 MWh 2 %

What this means for the project

  • 3,800 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income. At the heat value used in this case that is about US$79K a year.
  • The plant buys 160 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Heat need
400 MWhYour data
Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
240 – 380 MWhCalculated

Season: how much the digester takes for itself

In January heating the digester needs heat equal to 11 % of that month’s methane energy, in July 7 %.

January: methane energy 430 MWh · digester heating 47 MWh (11 %) · heat for a user 27 MWh

  • Methane energy of the month
  • Digester heating
  • Heat for a user

How it works: from feedstock to products

  1. Feedstock14,000 t/yr
  2. Biogas830K Nm³/yr
  3. Useful heat320 MWh
  4. Heat without demand3,800 MWh
  5. Digestate13,000 t/yr
Heat produced (gross)
4,559 MWh
Digester heat demand
460 MWh
Useful heat (economic)
320 MWh of 4,099
Power: own use / sold
0 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
1 g CO₂e/MJ
gas-tight digestate storage
Fossil comparator
80 g CO₂e/MJ
Greenhouse-gas saving
98 %
RED minimum: 80 %
Avoided emissions
91 t CO₂e
  • Meets the RED minimum.
  • Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.
  • Residues other than manure, maize and food waste use the RED biowaste values.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
59/100
  • Energy equivalent ≈ 228 kWe (scale score 82/100)
  • Feedstock energy ≈ 362 kWh of methane per tonne (score 61/100)
  • Feedstock available 12 of 12 months
  • Logistics take up to 1656 % of the feedstock's energy value
  • Ammonia / fat inhibition risk lowers the yield
Energy fit
8/100
  • Own consumption absorbs 0 % of the electricity produced
  • Useful heat 320 MWh of 4099 MWh available after digester needs
Location & logistics
80/100
  • Some feedstock comes from more than 30 km
Technical feasibility
75/100
  • Ammonia / fat inhibition needs active process control
  • ABP pasteurisation adds complexity
Economics
64/100
  • Base-case simple payback ≈ 8.1 years
Regulatory complexity
9/100 risk
  • Number and weight of permitting / regulatory steps: 7 points (more = harder)
Environmental risk
20/100 risk
  • Expected methane loss 1.5 % — within good practice if gas-tight and monitored
Overall project viability
61/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Regulatory complexity (91); weakest: Energy fit (8).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Dairy cattle slurry7,2008.513.6on site≈ 0 km
Grease-trap fatdelivered 60 km3,00015101.3818 %≈ 0 km
Fruit & vegetable residuesdelivered 40 km4,0001235.31,656 %≈ 0 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Wet mesophilic digestion (CSTR)

Vertical CSTR with mechanical mixing and a membrane gas holder

Working volume
≈ 1,500 m³
Retention time
37.6 days
Loading rate
2.5 kg VS/(m³·d)
Digestate storage
≈ 6,600 m³
  • Dry matter 10.9 %: a liquid mix suited to wet mesophilic digestion.
  • Continuous feed — continuous operation gives steady gas and the simplest control.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Two-stage layout (main + post-digester) for stability with fats or larger flows.
Alternatives
  • Separate pasteurisation (70 °C / 1 h) ahead of a mesophilic digester instead of thermophilic operation

Climate: Ontario (Guelph), mean 8.4 °C, ≈ 3,694 heating degree-days. Closest climate analogues: Vilnius (LT) (Δ 1.9 °C), Rzeszów (PL) (Δ 2.1 °C), Kraków (PL) (Δ 2.4 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan1,20543047270
Feb1,09839242250
Mar1,20543045270
Apr1,16641641260
May1,20543036270
Jun1,16641630260
Jul1,20543029270
Aug1,20543030270
Sept1,16641632260
Oct1,20543039270
Nov1,16641643260
Dec1,20543046270
Σ14,2005,0664603200
CAPEX, OPEX, revenue (base case)
CAPEX (USD)
Digester300K
Covering existing storage120K
Feedstock reception and preparation220K
Pasteurisation (70 °C / 1 h)86K
Gas handling and cleaning43K
Boiler (heat only)57K
Heat network78K
Electrical systems and controls55K
Pipework37K
Civil works55K
Grid connection10K
Engineering and permits86K
Contingency120K
Total1.3M
OPEX / yr (USD)
Staff35K
Maintenance25K
Insurance6.4K
Testing and monitoring5.6K
Feedstock purchase, net of gate fees-320K
Feedstock transport63K
Digestate handling25K
Purchased electricity20K
Total-140K
Revenue + savings / yr (USD)
Useful heat (economic)6.7K
Incremental digestate value15K
Total21K

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: liability / cost · 13,203 t/yr · nitrogen ≈ 36,029 kg/yr · land needed ≈ 212 ha (available 500 ha).

Incremental fertiliser value US$15K/yr, handling US$25K/yr, net -US$10K/yr.

  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 1.5 % of methane produced (range 0.5 % – 3 %) ≈ 150 t CO₂e/yr; fossil emissions displaced ≈ 65 t CO₂/yr. Losses vs benefit: 232 %.

  • Methane losses could cancel the climate benefit. Do not claim emission reductions without measurements.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Provincial environmental approval (e.g. Ontario ECA / O.Reg 267/03 for on-farm AD)
    New installation · effort: medium · to verify
  • Nutrient-management regulation for digestate (provincial)
    Digestate is spread on land · effort: medium · to verify
  • Animal by-products approval: pasteurisation 70 °C / 1 h (Cat. 3) or pressure sterilisation (Cat. 2), veterinary registration
    Slaughter / dairy / food residues in the feed · effort: high · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Biological hazards: pathogens in animal by-products and food waste high
    Condition: Animal by-products / food waste in the mix
    • Pasteurisation 70 °C / 1 h (Cat. 3) with time–temperature control
    • Separate dirty and clean zones, vehicle disinfection
    • Veterinary supervision and traceability
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (148)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: The RNG business case is utility offtake negotiated under regulated price caps (Québec ≤ 35 $2022/GJ per contract, BC ≤ $31/GJ from 2021/22, CPI-indexed); Clean Fuel Regulations credits and the Clean Technology ITC are uncertain extras. No electricity feed-in tariff.
  • Cold winters and low power prices: RNG contracts are usually the business case.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

boiler: local CAPEX factor
0.637 … 1.183 —
NPV low…high: -US$62K … US$920K
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.05 … 0.08 —
NPV low…high: US$210K … US$560K
Mineral potassium price
0.7981 … 0.9065 USD/kg K₂O
NPV low…high: US$430K … US$430K
Mineral nitrogen price
1.17 … 2.035 USD/kg N
NPV low…high: US$400K … US$470K
Mineral phosphorus price
1.588 … 2.068 USD/kg P₂O₅
NPV low…high: US$420K … US$430K
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.2798 USD/Nm³ · CALCULATED_VALUE · LOW
National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
boiler: local CAPEX factor: 0.91 — · CALCULATED_VALUE · MEDIUM
0.72 traded equipment + 0.28 × local/German labour cost (21.3/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.045 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 9.615 USD/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 3.828 USD/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.06 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.00 % (Aaa; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.02487 USD/kWh · CALCULATED_VALUE · MEDIUM
AESO pool price, hourly time-weighted mean Oct 2025 – Sep 2026: CAD 35.07/MWh (Alberta; other provinces have no market); converted at 1.5785 CAD/EUR (2026-11-09)
2026-09-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 0.03507 CAD (ENGINEERING_ASSUMPTION); FX (2026-11-09): 1.579 CAD/EUR (MARKET_DATA)
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.8519 USD/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.489 USD/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.878 USD/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 1.41 CAD/USD · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-09
2026-11-09 · checked 2026-11-10 · CAD per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Value of useful heat (displaced gas / boiler efficiency): 0.02087 USD/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 16.784755680776218 €/MWh LHV ÷ 0.9
2026-10-01 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 23.87 CAD (ENGINEERING_ASSUMPTION); FX (2026-11-09): 1.579 CAD/EUR (MARKET_DATA)
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 34.11 USD/h · CALCULATED_VALUE · MEDIUM
Statistics Canada LFS average hourly wage 2024 CAD 35.20 × 1.035 (2025) × 1.10 paid/worked × 1.20 employer costs = CAD 48.1/h; converted at 1.5785 CAD/EUR (2026-11-09)
2025-12-31 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 48.1 CAD (ENGINEERING_ASSUMPTION); FX (2026-11-09): 1.579 CAD/EUR (MARKET_DATA)
Plant operator wage relative to the economy-wide average: 0.9103 — · CALCULATED_VALUE · MEDIUM
0.7 national operator ratio × 1.3005 regional wage relative for CA.08 (Job Bank NOC 92101 water and waste treatment plant operators, median wage by province (Nov 2025) × StatCan 36-10-0205 employer contributions ÷ CAD 48.1/h ÷ 0.7)
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.1601 USD/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 1.287 USD/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.1205 USD/kWh · USER_INPUT · MEDIUM
USER_INPUT 0.17 CAD/kWh / FX 1.5785; Official EUR reference rate, 2026-11-09. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
dairy_slurry: dry matter: 8.5 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
dairy_slurry: volatile solids: 80 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
dairy_slurry: BMP (scenarios ± inter-laboratory spread): 200 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
grease_trap_fat: dry matter: 15 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
grease_trap_fat: volatile solids: 90 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
grease_trap_fat: BMP (scenarios ± inter-laboratory spread): 750 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
fruit_veg_residues: dry matter: 12 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
fruit_veg_residues: volatile solids: 92 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
fruit_veg_residues: BMP (scenarios ± inter-laboratory spread): 320 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified