Sample report · Brazil

Brazilian ethanol mill, vinasse

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

A São Paulo sugar-ethanol mill considers vinasse and press mud during an eight-month harvest. Warm climate does not remove the seasonal feedstock constraint.

Operating assumptions

  • Vinasse (sugarcane / ethanol): 400,000 t/yr · DM: 3.5 % · 8 months · Season starts: April · Spread on our own fields
  • Press mud / filter cake: 40,000 t/yr · DM: 25 % · 8 months · Season starts: April · Spread on our own fields
  • Electricity: 6,000,000 kWh/yr · Electricity price on your bill (if known): 0.23 BRL/kWh
  • No heat needed
  • Land available for spreading digestate: 20,000 ha · Distance to the gas grid (for biomethane): 15 km
  • Existing lagoon / store that could be covered: 60,000 m³
  • Grid connection? Yes

What to verify

Measure COD, solids, sulphur and daily harvest flows. Verify potassium and land loading, off-season operation, local quotes and a buyer before selecting gas upgrading.

Possible with conditions

It can pay off, but only if the key conditions hold — confirm them in a feasibility study.

  • Base NPV positive (US$3.4M), payback ≈ 6.9 yrs.
  • Conservative-case NPV is negative (-US$8.8M) — sensitive to key assumptions.
  • Data confidence is low — the verdict is preliminary.

Largest benefit — “biomethane sales”: ≈ 98 % of all revenue and savings.

What would change the verdict
  • → Secure long-term heat and power offtake; benchmark CAPEX with 3–5 suppliers.
  • → Fill in missing data and run a laboratory feedstock analysis.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

Grey zone: the answer flips between the conservative and the optimistic case. Before paying for a feasibility study, check these first:

NPV: conservative -US$8.8M · base US$3.4M · optimistic US$13M

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in 79 % of cases.

  1. Get a biomethane offtake offer · Energy prices −20 % (-US$4.2M)
  2. Feedstock potential −20 % (-US$3.7M)
  3. Lab test of the methane yield (BMP) · CH₄ −20 % (-US$3.6M)

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

To reach a bankable estimate (±15 %)
  1. Laboratory methane-potential (BMP) test of 2–3 feedstock samples — ≈ US$336–US$895 each
  2. 2–3 supplier quotes for the plant
  3. Grid or gas-network connection conditions from the operator
  4. Letters of intent for feedstock supply and for heat, power or biomethane offtake
  5. Then a feasibility study with permits and financing (±15 %)
From screening to construction

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
US$9.6M – US$13M
≈ R$59M (base)
Payback
3.9 yr – > 25 yr
base: 6.9 yr · no subsidies
NPV (base)
US$3.4M
range: -US$8.8M … US$13M
Chosen route
Biomethane
Confidence: Low

1 EUR = 1.1193 USD · ECB · 2026-11-09

Feedstock and energy

Feedstock potential
440,000 t/yr
energy ≈ 109 kWh CH₄/t
Biogas
6.4M – 8.8M Nm³/yr
≈ 1,017 Nm³/h (base)
Net energy
3.8M – 4.9M Nm³/yr
biomethane / year
Candidate capacity
2,100 kWe
large (1–5 MW)

How far you can rely on these numbers

Low · 49/100
  • Backed by your data and our sources49
  • You can still add+41
  • Needs a feasibility study (lab, quotes, contracts)10

49/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainLaboratory DM, VS and BMP results for every feedstock streamLarge effectSend a sample to a laboratory: dry matter and VS take a few days, BMP several weeksValues equal to the typical ones shown in the form do not count as a laboratory result.+27
  • Route-specific CAPEX lacks independent local validation — obtain comparable supplier quotations+8
  • At least one price affecting this route relies on an unconfirmed market proxy or uncontracted offtake — confirm the applicable tariff or buyer contract+6

With all of it: up to 90/100

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • Seasonal stream (8 months): equipment sits idle for the rest of the year.
  • "sugarcane / ethanol vinasse" is very dilute: consider a high-rate reactor (UASB / covered lagoon) instead of a CSTR — the model's CSTR costing is conservative here.
  • Grid injection of biomethane is not yet an established pathway in this country: plan for local use (bio-CNG/LNG) or a pioneer connection.
  • Both digester types were assessed for this liquid feed and climate. Chosen: Covered anaerobic lagoon (unheated, ambient temperature) (NPV US$3.4M); alternative: Wet mesophilic digestion (CSTR) (NPV -US$4.5M, CAPEX US$14M). A covered lagoon is cheaper but gives ≈ 100 % of a heated tank's gas (EPA AgSTAR) and needs land.
Country conditions
  • Sugar-ethanol vinasse and press mud are the largest feedstock; covered lagoons dominate in the warm South.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Strong candidate”
  • Payback in the base case is 6.9 yr; it needs to be 6.5 yr or less.
  • The conservative case must stay profitable too (its NPV is -US$8.8M).
  • Data confidence is low (49/100): see “What you can add”.
Order of action
  1. 1Verify first: Get a biomethane offtake offer. Up to US$25K of this decision depends on it. →
  2. 2Ask 3–5 suppliers for quotes: the project breaks even up to an investment of US$13M. →

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Get a biomethane offtake offercan change the answer-US$1.7M … US$11MUS$25K
Get supplier quotes for the plantcan change the answer-US$760K … US$7.6MUS$4.1K
Verify the market priceUS$1.7M … US$4.4M—
Check the fertiliser value of the digestateUS$3.3M … US$3.6M—
How to check: Get a biomethane offtake offer
  1. Ask two or three biomethane traders or gas suppliers for an offer without state support.
  2. Ask the gas grid operator for the injection point, pressure and connection cost.
Request to send
Request for a biomethane offtake offer
Site: Brazil. Expected output ≈ 550 Nm³/h, ≈ 52,000 MWh (HHV) a year; ≈ 0 % of organic matter from manure (relevant for certification). Please offer a price per MWh (HHV) without state support, indexation, term, and say whether guarantees of origin or sustainability certificates are included or paid extra.

Then enter it in: Energy step: biomethane price offered by a buyer

How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Brazil.
Feedstock (screening values, to be confirmed):
- sugarcane / ethanol vinasse: 400,000 t/year, DM ≈ 3.5 %
- sugar press mud / filter cake: 40,000 t/year, DM ≈ 25.0 %
Design basis from the screening: raw biogas ≈ 1,400 Nm³/h at ≈ 59 % CH₄; digester working volume ≈ 72,000 m³; membrane upgrading ≈ 550 Nm³/h biomethane (≈ 1,400 Nm³/h raw gas); new digestate storage ≈ 0 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Biomethane price at NPV = 0
US$0.429/Nm³US$40/MWh HHV
now US$0.504/Nm³ · US$46.9/MWh HHV
Highest installed cost at NPV = 0
US$13M
now US$11M
Feedstock price headroom
US$0.779/t
can pay up to US$0.779 per tonne more for every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-US$1.2M
Median NPV
US$2.5M
NPV P90 (1 in 10 better)
US$6M
Chance that NPV > 0
79 %
Median payback
7.4 yr

No real-plant check for this type of project yet: we have no open data on operating plants like this one to compare with the model. The range above shows only the model's own uncertainty; confirm the gas yield with a lab test (BMP) or a pilot first.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, USD (base: 3.4M)

  1. Energy prices −20 %-4.2M
  2. Feedstock potential −20 %-3.7M
  3. CH₄ −20 %-3.6M
  4. CAPEX +20 %-2.8M
  5. Maintenance +30 %-820K
  6. Useful heat (economic) −50 %0
  7. Feedstock transport +50 %0
  8. CHP downtime +10 pp0
NPV = 0 if CAPEX falls by
already positive
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
already positive
relative to the base case

Flip the NPV sign: Energy prices −20 %; Feedstock potential −20 %; CH₄ −20 %.

Scenarios

Route: Biomethane. Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yrUS$2.5M
  • Biomethane2.4M
  • Incremental digestate value45K
OPEX / yrUS$950K
  • Bio-CNG transport220K
  • Purchased electricity190K
  • Certification and balancing160K
  • Maintenance150K
Operating margin (EBITDA)US$1.5M
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr6,397.28,132.88,783.4
CAPEXUS$13MUS$11MUS$9.6M
OPEX / yrUS$1MUS$950KUS$870K
Revenue + savings / yrUS$1.5MUS$2.5MUS$3.3M
Operating margin (EBITDA)US$480KUS$1.5MUS$2.4M
Simple payback> 25 yr6.9 yr3.9 yr
Discounted paybackno payback10.1 yr5.1 yr
NPV-US$8.8MUS$3.4MUS$13M
IRR-6.1 %12.4 %24.5 %
DSCR (min)0.41.62.9

Pre-tax, nominal USD, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 50 % debt (no taxes).

Cumulative cash flow, USD
-15M-3.1M9.3M22M34M03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) US$11MUS$230K> 25 yr-US$9.5M-US$15M … -US$7M
Boiler (heat only) US$5.7M-US$210Kno payback-US$7.7M-US$9.7M … -US$6.8M
Biomethane chosenUS$11MUS$1.5M6.9 yrUS$3.4M-US$8.8M … US$13M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 1,001 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 220,000Biomethane1,064US$6.3MUS$320K
× 0.75 330,000Biomethane1,596US$8.5MUS$1.8M
× 1 your input440,000Biomethane2,128US$11MUS$3.4M
× 1.5 660,000Biomethane3,192US$15MUS$6.9M
× 2 880,000Biomethane4,256US$20MUS$9M
× 3 1,300,000Biomethane6,384US$31MUS$12M

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

There is no support for new projects that we could calculate — see the country overview

No support scheme for new projects is modelled for this country.

Country overviewchecked 30 Oct 2026

No price support: biomethane relies on the new mandate market (0.5 % in 2026) and small CHP on distributed-generation net metering; CBIOs add little.

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

98/100

Of every 100 kWh of energy in the methane, 98 become a product that earns money or replaces a purchase.

100 % = 48,000 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Biomethane47,000 MWh 98 %

Losses

  • Methane slip in upgrading330 MWh 0.7 %
  • Methane leaks720 MWh 2 %

What this means for the project

  • The plant buys 4,600 MWh of electricity a year (upgrading, pumps, mixers). It is a running cost, outside the methane balance.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
3.8M – 4.9M Nm³Calculated

How it works: from feedstock to products

  1. Feedstock440,000 t/yr
  2. Biogas8.1M Nm³/yr
  3. Gas to grid4.9M Nm³
  4. Useful heat0 MWh
  5. Digestate430,000 t/yr
Heat produced (gross)
0 MWh
Digester heat demand
0 MWh
Useful heat (economic)
0 MWh of 0
Power: own use / sold
0 / 0 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
40 g CO₂e/MJ
gas-tight digestate storage
Fossil comparator
94 g CO₂e/MJ
Greenhouse-gas saving
58 %
RED minimum: 65 %
Avoided emissions
9,196 t CO₂e
  • Below the RED minimum: a gas-tight digestate store, off-gas combustion or more manure in the mix raise the saving.
  • RED sustainability criteria apply (rated input ≥ 2 MW).
  • Residues other than manure, maize and food waste use the RED biowaste values.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
78/100
  • Energy equivalent ≈ 2128 kWe (scale score 100/100)
  • Feedstock energy ≈ 109 kWh of methane per tonne (score 22/100)
  • Feedstock available 8 of 12 months
Energy fit
61/100
  • Biomethane: raw biogas ≈ 1001 Nm³/h (EU average plant ≈ 483 Nm³/h)
  • ≈ 15 km to the gas grid
Location & logistics
75/100
  • Gas grid more than 10 km away
Technical feasibility
85/100
  • Seasonal feedstock: equipment under-used
Economics
73/100
  • Base-case simple payback ≈ 6.9 years
Regulatory complexity
5/100 risk
  • Number and weight of permitting / regulatory steps: 6 points (more = harder)
Environmental risk
22/100 risk
  • Expected methane loss 2.2 % (good practice ≤ 2 %)
Overall project viability
76/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Strongest: Regulatory complexity (95); weakest: Energy fit (61).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Vinasse (sugarcane / ethanol)400,0003.57.4on site≈ 12 km
Press mud / filter cake40,0002546.9on site≈ 126 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Covered anaerobic lagoon (unheated, ambient temperature)

Lined lagoon with HDPE gas-tight cover, sludge removal and gas collection

Working volume
≈ 72,000 m³
Retention time
40 days
Loading rate
1 kg VS/(m³·d)
Digestate storage
≈ 36,000 m³
  • Warm climate (annual mean ≈ 24 °C) and a liquid feed (5.5 % DM): an unheated covered lagoon is the lowest-cost proven option.
  • Feedstock is seasonal: a continuous plant would sit idle; a campaign-based or buffered design is more flexible.
  • Single stage plus a gas-tight digestate store as post-digester: sufficient at this scale.
Alternatives
  • Heated CSTR or UASB for higher, steadier gas yield per m³

Climate: São Paulo interior (Ribeirão Preto), mean 23.7 °C, ≈ 0 heating degree-days. Closest climate analogues: Dresden (DE, east) (Δ 16.1 °C), Copenhagen (DK) (Δ 16.1 °C), Prague (CZ) (Δ 16.5 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan00000
Feb00000
Mar00000
Apr54,0985,814000
May55,9026,008000
Jun54,0985,814000
Jul55,9026,008000
Aug55,9026,008000
Sept54,0985,814000
Oct55,9026,008000
Nov54,0985,814000
Dec00000
Σ440,00047,285000
CAPEX, OPEX, revenue (base case)
CAPEX (USD)
Digester2.2M
Covering existing storage940K
Feedstock reception and preparation140K
Gas handling and cleaning170K
Upgrading3.2M
Bio-CNG (250 bar)1.1M
Electrical systems and controls460K
Pipework310K
Civil works460K
Grid connection8.7K
Engineering and permits720K
Contingency970K
Total11M
OPEX / yr (USD)
Staff42K
Maintenance150K
Maintenance (Upgrading)130K
Insurance53K
Testing and monitoring5.6K
Purchased electricity190K
Bio-CNG transport220K
Certification and balancing160K
Total950K
Revenue + savings / yr (USD)
Biomethane2.4M
Incremental digestate value45K
Total2.5M

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: asset · 429,988 t/yr · nitrogen ≈ 285,000 kg/yr · land needed ≈ 1,676 ha (available 20,000 ha).

Incremental fertiliser value US$45K/yr, handling US$0/yr, net US$45K/yr.

  • Digestate storage for 3 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 2.2 % of methane produced (range 1.3 % – 3.7 %) ≈ 2,041 t CO₂e/yr; fossil emissions displaced ≈ 9,485 t CO₂/yr. Losses vs benefit: 22 %.

  • Expected loss 2.2 % is above good practice (2 %): budget for monitoring.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Construction permit and national environmental approval / EIA screening
    New installation · effort: medium · to verify
  • Gas-safety approval and hazardous-area classification (IECEx or national code)
    Methane in the gas phase · effort: medium · to verify
  • Effluent / digestate discharge or land-application permit
    Digestate or treated effluent leaves the site · effort: medium · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (147)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: No price support: biomethane relies on the new mandate market (0.5 % in 2026) and small CHP on distributed-generation net metering; CBIOs add little.
  • Sugar-ethanol vinasse and press mud are the largest feedstock; covered lagoons dominate in the warm South.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

biomethane: local CAPEX factor
0.546 … 1.014 —
NPV low…high: -US$760K … US$7.6M
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.069 … 0.099 —
NPV low…high: US$1.7M … US$4.4M
Mineral potassium price
0.7981 … 0.9065 USD/kg K₂O
NPV low…high: US$3.4M … US$3.4M
Mineral nitrogen price
1.17 … 2.035 USD/kg N
NPV low…high: US$3.3M … US$3.6M
Mineral phosphorus price
1.588 … 2.068 USD/kg P₂O₅
NPV low…high: US$3.4M … US$3.4M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.5037 USD/Nm³ · CALCULATED_VALUE · LOW
National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
biomethane: local CAPEX factor: 0.78 — · CALCULATED_VALUE · LOW
0.72 traded equipment + 0.28 × local/German labour cost (5.6/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.064 — · CALCULATED_VALUE · MEDIUM
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.5 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 7 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 4.444 USD/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 1.948 USD/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.079 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 3.10 % (Ba1; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.04131 USD/kWh · CALCULATED_VALUE · MEDIUM
CCEE PLD monthly mean, Sudeste/Centro-Oeste, Oct 2025 – Sep 2026: 227.9 BRL/MWh; converted at 6.1748 BRL/EUR (2026-11-09)
2026-09-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 0.2279 BRL (ENGINEERING_ASSUMPTION); FX (2026-11-09): 6.175 BRL/EUR (MARKET_DATA)
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.8519 USD/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.489 USD/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.878 USD/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 5.517 BRL/USD · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-09
2026-11-09 · checked 2026-11-10 · BRL per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Value of useful heat (displaced gas / boiler efficiency): 0.06509 USD/kWh th · CALCULATED_VALUE · MEDIUM
Business gas 52.334767788095334 €/MWh LHV ÷ 0.9
2025-12-31 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 283 BRL (ENGINEERING_ASSUMPTION); FX (2026-11-09): 6.175 BRL/EUR (MARKET_DATA)
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 6.29 USD/h · CALCULATED_VALUE · MEDIUM
IBGE PNAD Contínua (SIDRA 5436), 2Q2026: average habitual income, all jobs, R$ 3 738/month × 13.33 × 1.358 employer costs ÷ 1 950 h; converted at 6.1748 BRL/EUR (2026-11-09)
2026-06-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 34.7 BRL (ENGINEERING_ASSUMPTION); FX (2026-11-09): 6.175 BRL/EUR (MARKET_DATA)
Plant operator wage relative to the economy-wide average: 1.19 — · CALCULATED_VALUE · MEDIUM
1 national operator ratio × 1.19 regional wage relative for BR.27 (IBGE PNAD Contínua (SIDRA 5436), 2Q2026: average habitual income by state ÷ Brazil R$ 3 738/month)
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.08954 USD/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 0.8171 USD/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.04169 USD/kWh · USER_INPUT · MEDIUM
USER_INPUT 0.23 BRL/kWh / FX 6.1748; Official EUR reference rate, 2026-11-09. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
vinasse: dry matter: 3.5 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
vinasse: volatile solids: 70 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
vinasse: BMP (scenarios ± inter-laboratory spread): 300 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
press_mud: dry matter: 25 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
press_mud: volatile solids: 75 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
press_mud: BMP (scenarios ± inter-laboratory spread): 250 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified