Sample report · Argentina

Beef / mixed cattle · Cattle solid manure (bedded): 45,000 t/yr

A sample Extended Report for a modelled project. Your report has the same structure (the Standard Report has fewer sections) and uses your own data.

Business situation

A Córdoba feedlot with about 4,000 head asks about biogas from pen manure. Córdoba has about 19 biogas plants, and the agriculture ministry tracks feedlots as a main manure source; this case shows the answer after sampling and bills.

Operating assumptions

  • Cattle solid manure (bedded): 45,000 t/yr · DM: 30 % · 12 months · Spread on our own fields
  • Electricity: 900,000 kWh/yr · Electricity price on your bill (if known): 150 ARS/kWh
  • No heat needed
  • Land available for spreading digestate: 3,000 ha · Distance to the gas grid (for biomethane): 10 km
  • Grid connection? Yes

What to verify

Scraping pens on concrete or separating sand would raise VS; a co-substrate with a gate fee or a power purchase contract is the lever, not a larger digester.

Weak economics

Under current conditions the investment won't pay back in a reasonable time. Below is what could change that.

  • Simple payback > 25.0 yrs; base NPV -US$4.8M (well below zero at the country discount rate).
  • Even the optimistic case has a negative NPV (-US$3.7M).

Main reason — ≈ 100 % of the heat has no user, so half of the plant's energy earns nothing.

What would change the verdict
  • → NPV = 0 with ≈ 77 % lower CAPEX (or an equivalent grant).
  • → NPV = 0 with ≈ 240 % higher energy prices.

Subsidies and tariffs excluded from the verdict. Preliminary screening, not an engineering design.

How firm is this answer?

A clear no under these conditions: even the optimistic case does not pay back. Don't spend money on a feasibility study unless one of the changes above happens.

NPV: conservative -US$6.9M · base -US$4.8M · optimistic -US$3.7M

The conservative case stacks every adverse assumption at once: a stress test, not the likely outcome. In 160 likely combinations the NPV was positive in < 1 % of cases.

These are screening assumptions, not independently validated accuracy limits. Confirm BMP, supplier scope, grid connection and offtake terms before an investment decision.

Key figures

Ranges: conservative — base — optimistic. We don't show fake precision.

Economics

Preliminary investment
US$4.8M – US$6.3M
≈ ARS 8.2B (base)
Payback
> 25 yr – no payback
base: > 25 yr · no subsidies
NPV (base)
-US$4.8M
range: -US$6.9M … -US$3.7M
Chosen route
CHP (power + heat)
Confidence: Medium

1 EUR = 1.1193 USD · ECB · 2026-11-09

Feedstock and energy

Feedstock potential
45,000 t/yr
energy ≈ 269 kWh CH₄/t
Biogas
1.7M – 2.4M Nm³/yr
≈ 276 Nm³/h (base)
Net energy
3,600 – 4,900 MWh/yr
useful heat: 0 MWh · ≈ 85 % of your electricity use
Candidate capacity
640 kWe
medium (0.25–1 MW)

How far you can rely on these numbers

Medium · 76/100
  • Backed by your data and our sources76
  • You can still add+14
  • Needs a feasibility study (lab, quotes, contracts)10

76/100: how much of what a screening can know about this project rests on your data and current sources. A missing input costs points in proportion to how far it could still move your result.

What you can add

  • Biggest gainRoute-specific CAPEX lacks independent local validation — obtain comparable supplier quotations+8
  • At least one price affecting this route relies on an unconfirmed market proxy or uncontracted offtake — confirm the applicable tariff or buyer contract+6

With all of it: up to 90/100

High requires verified laboratory and project documents, so a screening stops at 90/100.

Model warnings
  • CHP performance uses a 50 Hz biogas full-load catalogue reference (03/2025), interpolated between ratings; part-load and ambient derating require supplier confirmation.
  • Market data require review (econ.electricity_spot_eur_kwh). Observation dates and validity are shown in the evidence; these are not verified current customer quotations.
Compared with the market
Our estimate: ≈ 8,300 USD/kW at ≈ 640 kW
  • 3,806–8,395 USD/kW — Flexible plant, Germany · within rangeDBFZ / Fraunhofer IEE for BMWK (February 2024): €7,521 per kW rated (≈ €3,400 per kW installed) capacity · 2023 · Official study
  • 3,134–7,835 USD/kW — Agricultural plants, Poland · above rangePolish trade press 2023–2024 (PLN 7–20 m for 500 kW; PLN 12–16 m for 1 MW); IOŚ-PIB: ≈ PLN 30 m for 1 MW · 2023–2024 · Trade press
  • 3,358–5,037 USD/kW — Biogas plants, Ukraine · above rangeSupplier estimate (Zorg Biogas, ≈ €3,500/kW at 1 MW — primary source not found); Ecodevelop 333 kW ≈ €1.5 m (older project) · ≈2013–2020 · Supplier estimate

Market figures are mostly trade press and supplier estimates, not audited budgets. Real prices come from 3–5 supplier quotes.

Country conditions
  • Feedlots and dairy in the Pampas; currency risk dominates the discount rate.

Action plan: what would make it stronger

Changes tested on this project with the same model. Break-even values show how far each must go; the scenario assumptions are LOW-confidence judgements to replace with offers.

What separates this project from “Possible with conditions”
  • The base-case NPV is negative (-US$4.8M).
  • Payback in the base case is > 25 yr; it needs to be 10 yr or less.
ChangeVerdictNPV (base)Δ NPVBreak-even
Sell the spare heat
A year-round heat buyer (drying, process heat, greenhouse or district heating) for ≈ 2,800 MWh a year, valued at ≈ ARS 24.8 per kWh.
Weak economics-US$4.6M+US$200Kheat ≥ ARS 360 per kWh
Pool manure with neighbours
100 % more manure from neighbouring farms, trucked ≈ 5 km, into one shared plant.
Weak economics-US$7.6M-US$2.9M—
Take in food waste
≈ 18,000 t a year of source-separated food waste from ≈ 15 km away, with a gate fee of ARS 10,000 per tonne.
Weak economics-US$7.9M-US$3.1Mgate fee ≥ ARS 103,000 per tonne
Order of action
  1. 1Find a heat buyer for ≈ 2,800 MWh a year (heat ≥ ARS 360 per kWh).
  2. 2Ask 3–5 suppliers for quotes: the project breaks even up to an investment of US$1.2M. →
Scenario assumptions
  • Co-substrate share of the organic matter (VS) after it is added: 30 % · ASSUMPTION · LOW · 2026-11-02 · Judgement: usual co-digestion share at manure plants; the model applies pasteurisation, rejects and inhibition checks to the new mix.
  • Haul distance of the co-substrate: 15 km · ASSUMPTION · LOW · 2026-11-02 · Judgement: food processors within a regional collection radius.
  • Gate fee received for source-separated food waste: US$6.72/t · ASSUMPTION · LOW · 2026-11-02 · Judgement, deliberately low. WRAP UK Gate Fees Report 2025/26 (3 July 2026): AD gate fees fell from 2024/25 and several councils paid £0 or less. The paid report gives the gate fee at which the scenario breaks even.
  • Haul distance of the neighbours' feedstock: 5 km · ASSUMPTION · LOW · 2026-11-02 · Judgement: neighbouring farms within a few kilometres; slurry hauled much further rarely pays (see the maximum distance per stream).

What to verify first

Inputs ranked by what exact knowledge is worth before you decide (expected value of perfect information). Each range is tested on its own; inputs you already supplied are not listed.

CheckNPV across the plausible rangeWorth knowing
Get supplier quotes for the plant-US$6.6M … -US$2.9M—
Check the fertiliser value of the digestate-US$4.8M … -US$4.6M—
Check how your bill splits energy and capacity charges-US$4.8M … -US$4.7M—
Verify the market price-US$4.8M … -US$4.7M—
How to check: Get supplier quotes for the plant
  1. Send the same request to at least three suppliers.
  2. Compare like for like: scope, exclusions, guaranteed gas output, own power use, availability and the O&M price.
Request to send
Request for quotation: turnkey biogas plant
Site: Argentina.
Feedstock (screening values, to be confirmed):
- cattle solid manure with bedding: 45,000 t/year, DM ≈ 30.0 %
Design basis from the screening: raw biogas ≈ 280 Nm³/h at ≈ 55 % CH₄; digester working volume ≈ 6,300 m³; combined heat and power ≈ 640 kWe; new digestate storage ≈ 21,000 m³.
Please quote turnkey: feeding, digester(s), gas system with flare and desulphurisation, the gas-use equipment above, electrical and I&C, civil works, engineering and commissioning. List exclusions (grid connection, permits, land, digestate storage if separate). State the guaranteed gas output, own power and heat use, availability and the price of a full O&M contract.

Then enter it in: Step 3, “Optional: contracts and financing”: supplier quote and its technology

How to check: Check the fertiliser value of the digestate
  1. Ask neighbouring farms what they would pay per tonne of digestate, delivered and spread.
  2. Check the land available for spreading against the nitrogen limit.

Then enter it in: Site step: land available for digestate

How to check: Check how your bill splits energy and capacity charges
  1. Take the last 12 electricity invoices.
  2. Split each into the energy part (per kWh) and capacity, network and fixed charges; own generation saves mainly the energy part.

Then enter it in: Energy step: electricity price per kWh (energy part, excl. VAT)

How to check: Verify the market price
  1. Check the official source shown for this price in the market-data table and compare it with your own contract.

Then enter it in: Energy step: your own price, if you have a contract

Break-even prices

Each value on its own brings the base-case NPV to zero; everything else stays as calculated.

Electricity value at NPV = 0
US$0.195/kWh
now US$0.0574/kWh
Highest installed cost at NPV = 0
US$1.2M
now US$5.3M
Feedstock price headroom
US$13.3/t
needs US$13.3 per tonne less cost, or a gate fee, on every input

Probability range (Monte Carlo)

160 draws of the scenario quantities (yield, dry matter, CAPEX, prices, heat use, operating hours…). Energy and biomethane prices move together, the rest independently. Not a forecast: it shows how often the project stays positive when the uncertainties do not all go wrong at once.

NPV P10 (1 in 10 worse)
-US$5.7M
Median NPV
-US$5.1M
NPV P90 (1 in 10 better)
-US$4.6M
Chance that NPV > 0
< 1 %
Median payback
> 25 yr

Reality check: on 39 German farm plants with metered feed and methane (FNR Biogas-Messprogramm III), measured output was 1–1.3 × this model's estimate for 8 in 10 plants. The model sizes the plant itself and stays on the cautious side; with feedstock that is not lab-tested, one plant can still miss by more.

What could break the economics

Each stress test applied to the base case on its own.

Change in NPV vs base, USD (base: -4.8M)

  1. CAPEX +20 %-1.2M
  2. Maintenance +30 %-400K
  3. Energy prices −20 %-400K
  4. Feedstock potential −20 %-310K
  5. CH₄ −20 %-240K
  6. CHP downtime +10 pp-150K
  7. Useful heat (economic) −50 %0
  8. Feedstock transport +50 %0
NPV = 0 if CAPEX falls by
77 %
grant, leasing, cheaper equipment
NPV = 0 if energy prices rise by
240 %
relative to the base case

Scenarios

Route: CHP (power + heat). Scenarios bundle consistent assumptions (lower yield comes with higher CAPEX).

Revenue + savings / yrUS$310K
  • Electricity sales200K
  • Electricity self-consumption savings63K
  • Incremental digestate value44K
OPEX / yrUS$230K
  • Maintenance88K
  • CHP service and overhaul reserve80K
  • Insurance26K
  • Staff26K
Operating margin (EBITDA)US$83K
ScenariosConservativeBaseOptimistic
Biogas, 1 000 Nm³/yr1,737.72,209.12,385.8
CAPEXUS$6.3MUS$5.3MUS$4.8M
OPEX / yrUS$260KUS$230KUS$210K
Revenue + savings / yrUS$210KUS$310KUS$360K
Operating margin (EBITDA)-US$55KUS$83KUS$150K
Simple paybackno payback> 25 yr> 25 yr
Discounted paybackno paybackno paybackno payback
NPV-US$6.9M-US$4.8M-US$3.7M
IRR—-13.8 %-7.1 %
DSCR (min)-0.10.20.3

Pre-tax, nominal USD, 15-year horizon, discount rate of the country or your own; a screening estimate, not a bankable feasibility study. DSCR = EBITDA ÷ debt service at 50 % debt (no taxes).

Cumulative cash flow, USD
-8M-5.9M-3.8M-1.7M450K03691215yearsConservativeBaseOptimistic

Biogas use routes compared

Base case. The model picks the route with the best NPV among technically sensible ones.

RouteCAPEXEBITDA / yrPaybackNPV (base)NPV low…high
CHP (power + heat) chosenUS$5.3MUS$83K> 25 yr-US$4.8M-US$6.9M … -US$3.7M
Boiler (heat only) US$4.2M-US$130Kno payback-US$5.2M-US$6.5M … -US$4.6M
Biomethane US$6.2M-US$14Kno payback-US$6.5M-US$9.5M … -US$4.2M
  • CHP pays when you use the power yourself and the heat is really used.
  • Biomethane: raw biogas ≈ 243 Nm³/h. The smallest upgrading units take ≈ 50–100 Nm³/h, and the cost per Nm³ falls steeply with size, so a small plant pays much more for each unit of gas.

Plant size

The same feedstock mix at other sizes, each option re-sized by the model. Extra feedstock is assumed on your terms (price, transport, disposal saving); CAPEX is the model's estimate, not your quote.

Sizet/yrBest optionkWeCAPEXNPV (base)
× 0.5 23,000CHP (power + heat)300US$2.9M-US$2.8M
× 0.75 34,000CHP (power + heat)450US$4.1M-US$3.8M
× 1 your input45,000CHP (power + heat)640US$5.3M-US$4.8M
× 1.5 68,000CHP (power + heat)960US$7.5M-US$6.6M
× 2 90,000CHP (power + heat)1,280US$9.7M-US$8.3M
× 3 140,000CHP (power + heat)1,950US$14M-US$12M

National support schemes — separate cases

Not in the verdict: tariffs get cut, auctions fail, grant calls close. Status and source shown for each.

Bottom line

There is no support for new projects that we could calculate — see the country overview

No support scheme for new projects is modelled for this country.

Country overviewchecked 30 Oct 2026

No support scheme for new small biogas: RenovAr has had no rounds since 2019; only private PPAs (MATER) and self-supply. Very high currency risk.

Support never changes the verdict. Each case is pre-tax, uses the scheme's published terms and assumes the support is awarded; it does not confirm eligibility or promise funding.

Where the energy goes

Heat produced ≠ useful heat. Heat without a user isn't income.

38/100

Of every 100 kWh of energy in the methane, 38 become a product that earns money or replaces a purchase.

100 % = 12,000 MWh of methane energy a year (LHV), base case. Every figure in this block is calculated by the model from your inputs.

Stream by stream

Calculated

Earns money

  • Electricity sold to the grid3,900 MWh 32 %
  • Electricity used on site770 MWh 6 %

Runs the plant

  • Plant’s own electricity380 MWh 3 %
  • Digester heating1,200 MWh 10 %

Produced, not used

  • Heat with no buyer3,500 MWh 29 %

Losses

  • Conversion losses (engine, boiler)2,000 MWh 17 %
  • Gas sent to the flare250 MWh 2 %
  • Methane leaks180 MWh 2 %

What this means for the project

  • 3,500 MWh of heat a year has no buyer. A heat user nearby (drying, a greenhouse, process heat, a heating network) would turn it into income.
  • Methane leaks are 2 % of production in the base case: lost income and a greenhouse gas. Gas-tight digestate storage and regular leak checks keep them low.

What the figures rest on

Engine efficiency: electricity / heat
43 % / 44 %Assumption
Heat need
no heat userYour data
Site electricity use
900 MWhYour data
Methane leaks, base case
2 %Assumption
Main product, conservative – optimistic
3,600 – 4,900 MWhCalculated

Season: how much the digester takes for itself

In July heating the digester needs heat equal to 12 % of that month’s methane energy, in January 8 %.

July: methane energy 1,000 MWh · digester heating 120 MWh (12 %) · heat for a user 0 MWh

  • Methane energy of the month
  • Digester heating

How it works: from feedstock to products

  1. Feedstock45,000 t/yr
  2. Biogas2.2M Nm³/yr
  3. Electricity4,600 MWh
  4. Useful heat0 MWh
  5. Heat without demand3,500 MWh
  6. Digestate42,000 t/yr
Heat produced (gross)
4,679 MWh
Digester heat demand
1,163 MWh
Useful heat (economic)
0 MWh of 3,516
Power: own use / sold
765 / 3,852 MWh

Climate case (EU RED method)

EU Renewable Energy Directive default values for your feedstock mix, digestate storage and route. Separate from the verdict; outside the EU an indicative benchmark. Credits are valued only in the support cases where an official mechanism exists.

Emissions of the product
7 g CO₂e/MJ
open digestate storage
Fossil comparator
183 g CO₂e/MJ
Greenhouse-gas saving
96 %
RED minimum: 80 %
Avoided emissions
2,925 t CO₂e
  • Meets the RED minimum.
  • Below 2 MW rated input the RED criteria do not apply by law; buyers and schemes may still ask for them.
  • Residues other than manure, maize and food waste use the RED biowaste values.

Scores by dimension

No single magic number. The overall score comes with its explanation.

Feedstock fit
89/100
  • Energy equivalent ≈ 640 kWe (scale score 97/100)
  • Feedstock energy ≈ 269 kWh of methane per tonne (score 52/100)
  • Feedstock available 12 of 12 months
Energy fit
38/100
  • Own consumption absorbs 17 % of the electricity produced
  • Useful heat 0 MWh of 3516 MWh available after digester needs
Location & logistics
100/100
  • No critical site constraints found from your answers
Technical feasibility
95/100
  • Dry digestion — fewer suppliers
Economics
0/100
  • Base-case simple payback ≈ 63.8 years
  • Base-case NPV is negative
  • Minimum DSCR 0.15 — below the usual bank threshold of 1.2–1.3
Regulatory complexity
14/100 risk
  • Number and weight of permitting / regulatory steps: 8 points (more = harder)
Environmental risk
24/100 risk
  • Expected methane loss 2.5 % (good practice ≤ 2 %)
Overall project viability
40/100
  • Weighted: economics 30 %, feedstock 20 %, energy 15 %, technical 10 %, location 10 %, regulatory 7.5 %, environment 7.5 %.
  • Capped at 40: weak economics is not offset by other factors.
  • Strongest: Location & logistics (100); weakest: Economics (0).

Calculation details

Feedstock & logistics
Streamt/yrDM, %Nm³ CH₄/tLogistics / energyMax. distance
Cattle solid manure (bedded)45,0003027on site≈ 21 km

Max. distance = where haulage eats half of a tonne's energy value. Low-energy feedstock (slurry) belongs next to the plant.

Technology & digester

Dry (high-solids) digestion, mesophilic

Garage (box) batch digesters with percolate recirculation, or horizontal plug-flow

Working volume
≈ 6,300 m³
Retention time
51.4 days
Loading rate
3.5 kg VS/(m³·d)
Digestate storage
≈ 21,000 m³
  • Average mix dry matter 30 % ≥ 22 %: wet digestion would need dilution, increasing volume and heat losses.
  • Mesophilic (≈38 °C): more robust, less heat and complexity. Thermophilic (≈52 °C) only when the benefit outweighs the complexity — rarely at this scale.
  • Two-stage layout (main + post-digester) for stability with fats or larger flows.
Alternatives
  • Wet digestion diluted with slurry/effluent — cheaper equipment, larger digester

Climate: Córdoba (Villa María), mean 18 °C, ≈ 818 heating degree-days. Closest climate analogues: Copenhagen (DK) (Δ 13.8 °C), Dresden (DE, east) (Δ 14.2 °C), Prague (CZ) (Δ 14.6 °C).

Monthly energy balance

Base case, chosen route. Gas energy is usable methane energy (LHV) after losses.

MonthFeedstock, tGas energy, MWhDigester heat, MWhUseful heat, MWhNet electricity, MWh
Jan3,8191,013800392
Feb3,480923760357
Mar3,8191,013890392
Apr3,696980950379
May3,8191,0131090392
Jun3,6969801150379
Jul3,8191,0131200392
Aug3,8191,0131130392
Sept3,6969801010379
Oct3,8191,013970392
Nov3,696980850379
Dec3,8191,013820392
Σ45,00011,9321,16304,617
CAPEX, OPEX, revenue (base case)
CAPEX (USD)
Digester1M
New covered storage1.2M
New open storage530K
Feedstock reception and preparation86K
Gas handling and cleaning57K
CHP (power + heat)880K
Backup boiler8.5K
Electrical systems and controls230K
Pipework150K
Civil works230K
Grid connection53K
Engineering and permits360K
Contingency480K
Total5.3M
OPEX / yr (USD)
Staff26K
CHP service and overhaul reserve80K
Maintenance88K
Insurance26K
Testing and monitoring5.6K
Total230K
Revenue + savings / yr (USD)
Electricity self-consumption savings63K
Electricity sales200K
Incremental digestate value44K
Total310K

Unit costs are estimates. Replace them with supplier quotations.

Digestate: asset or liability

Status: asset · 42,164 t/yr · nitrogen ≈ 282,150 kg/yr · land needed ≈ 1,660 ha (available 3,000 ha).

Incremental fertiliser value US$44K/yr, handling US$0/yr, net US$44K/yr.

  • Digestate storage for 6 months for the closed spreading season; keep ≈ 150 days (incl. the digester) gas-tight, otherwise methane and N are lost.
  • Spread by injection or trailing hose (not splash plate): less odour and ammonia loss.
Methane losses & climate

Expected losses: 2.5 % of methane produced (range 1.6 % – 4 %) ≈ 589 t CO₂e/yr; fossil emissions displaced ≈ 1,597 t CO₂/yr. Losses vs benefit: 37 %.

  • Expected loss 2.5 % is above good practice (2 %): budget for monitoring.
  • Gas-tight covers on the digester and digestate storage (incl. lagoon covers) — the single most important measure.
  • Leak detection and repair (LDAR): optical gas imaging or tracer method at least yearly, plus an acceptance test after construction.
  • Continuous gas-holder pressure monitoring; a standby flare instead of venting.
  • CHP with an oxidation catalyst and tuning regime to cut methane slip.

Avoided emissions from open manure storage are not credited (conservative).

Permits & regulation (indicative)

Complexity: lower. “To verify” means a local lawyer or engineer must confirm the item during the feasibility study.

  • Construction permit and national environmental approval / EIA screening
    New installation · effort: medium · to verify
  • Gas-safety approval and hazardous-area classification (IECEx or national code)
    Methane in the gas phase · effort: medium · to verify
  • Effluent / digestate discharge or land-application permit
    Digestate or treated effluent leaves the site · effort: medium · to verify
  • Power-purchase / net-metering agreement and grid connection
    Electricity export · effort: medium · to verify
Safety (risk register)
  • Methane: explosion and fire (flammable range ≈ 5–15 % in air) high
    • Hazardous-area (ATEX/IECEx or national) zoning and suitably rated equipment
    • Fixed gas detectors in the CHP room and near tanks
    • Flame arresters, over/under-pressure relief, safety flare
    • Ignition-source control and hot-work permits
  • Hydrogen sulphide (H₂S): acute toxicity, corrosion high
    • Biological / chemical desulphurisation of the biogas
    • Personal H₂S monitors, no lone working
    • H₂S monitoring upstream of the CHP (engine protection)
  • Confined spaces (digester, storage, pits): asphyxiation, toxic gases high
    • Entry only under permit, ventilation, standby person
    • Self-contained breathing apparatus for rescue
  • Over/under-pressure: membrane roof rupture, tank deformation medium
    • Liquid seals / relief valves venting to a safe location
    • Gas-holder level and pressure sensors
  • CHP: carbon monoxide, fire, high temperatures medium
    • CHP room ventilation, CO detectors
    • Emergency stop, fire suppression
  • Soil and water pollution: slurry/digestate spills, lagoon overflow high
    • Bund sized for the largest tank
    • Level sensors and a spill-response plan
    • Digestate storage covering the closed spreading season

Software does NOT replace a qualified process engineer and a process-safety engineer. Every final engineering design, hazardous-area classification and safe-operation programme must pass human professional review.

Assumptions used (158)

Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register: →

  • Support: No support scheme for new small biogas: RenovAr has had no rounds since 2019; only private PPAs (MATER) and self-supply. Very high currency risk.
  • Feedlots and dairy in the Pampas; currency risk dominates the discount rate.
  • The verdict excludes subsidies; national support is shown as separate cases.
  • This is a preliminary (screening) assessment — not a detailed engineering design and not a commercial offer.
  • Financial results are pre-tax project cash flows. Depreciation, income taxes, working capital, financing fees and detailed debt covenants are not modelled; DSCR is an EBITDA-based screening ratio, not lender CFADS.
  • Parameter bounds are tested individually using the applicable market/CAPEX evidence. These engineering or tariff ranges are not statistical confidence intervals and do not replace supplier quotations or customer bills.

What could break the economics

Each stress test applied to the base case on its own.

chp: local CAPEX factor
0.567 … 1.053 —
NPV low…high: -US$6.6M … -US$2.9M
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk)
0.106 … 0.136 —
NPV low…high: -US$4.8M … -US$4.7M
Mineral potassium price
0.7981 … 0.9065 USD/kg K₂O
NPV low…high: -US$4.8M … -US$4.8M
Mineral nitrogen price
1.17 … 2.035 USD/kg N
NPV low…high: -US$4.8M … -US$4.6M
Mineral phosphorus price
1.588 … 2.068 USD/kg P₂O₅
NPV low…high: -US$4.8M … -US$4.8M
Avoidable share of an unsplit customer electricity bill
0.7 … 1 —
NPV low…high: -US$4.8M … -US$4.7M
Every number has a source, date, country and confidence, and is tagged FACT / ASSUMPTION / CALCULATION / ESTIMATE. Full register:
Biomethane price without support, base: 0.3134 USD/Nm³ · CALCULATED_VALUE · LOW
National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
chp: local CAPEX factor: 0.81 — · CALCULATED_VALUE · LOW
0.72 traded equipment + 0.28 × local/German labour cost (9.7/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt interest rate (EUR-equivalent): 0.101 — · CALCULATED_VALUE · LOW
Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); a bank term sheet replaces this
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Debt share for DSCR test: 0.5 — · ENGINEERING_ASSUMPTION · MEDIUM
Typical agri / project lending (KfW, EBRD, IFC practice)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Debt tenor: 7 a · ENGINEERING_ASSUMPTION · MEDIUM
Typical
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Digestate that has no adequate land: 5.182 USD/t · CALCULATED_VALUE · MEDIUM
Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Incremental digestate handling on adequate land: 2.216 USD/t · CALCULATED_VALUE · MEDIUM
Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.116 — · CALCULATED_VALUE · MEDIUM
Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 9.28 % (Caa1; Damodaran, 2026-07); not a bank offer
2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Wholesale electricity price (market average): 0.06172 USD/kWh · CALCULATED_VALUE · LOW
ENRE Edenor tariff, Jun 2026: wholesale energy component for users > 300 kW ≈ 95.8 ARS/kWh (T3 energy 103.22 − wheeling 7.40); regulated proxy, not a CAMMESA average; converted at 1737.45 ARS/EUR (2026-11-05); regulated price, not an export offer — confirm a PPA
2026-06-01 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
REVIEW_REQUIRED: Observation is 157 days old; exceeds the 60-day review policy
Documented nominal reference (may include estimated adders): 95.8 ARS (ENGINEERING_ASSUMPTION); FX (2026-11-05): 1,737 ARS/EUR (MARKET_DATA)
Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
15 % profile & balancing discount for a small seller (assumption, same for all markets)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Mineral potassium price: 0.8519 USD/kg K₂O · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral nitrogen price: 1.489 USD/kg N · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Mineral phosphorus price: 1.878 USD/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
Exchange rate: 1,552 ARS/USD · MARKET_DATA · HIGH
Official EUR reference rate, 2026-11-05
2026-11-05 · checked 2026-11-10 · ARS per EUR; dated reference, not a guaranteed transaction rate
WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
Value of useful heat (displaced gas / boiler efficiency): 0.01599 USD/kWh th · CALCULATED_VALUE · LOW
Business gas 12.857871884213347 €/MWh LHV ÷ 0.9
2026-01-26 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 12.97 USD (ENGINEERING_ASSUMPTION); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA)
Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
Shorter than the 20-year technical life — conservative
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Official hourly labour cost, economy-wide (wages + employer costs): 10.84 USD/h · CALCULATED_VALUE · MEDIUM
RIPTE Aug 2026 1 982 518 ARS/month (Secretaría de Seguridad Social) × 13 × 1.24 employer contributions ÷ 1 900 h; converted at 1737.45 ARS/EUR (2026-11-05)
2026-08-31 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
Documented nominal reference (may include estimated adders): 16,820 ARS (ENGINEERING_ASSUMPTION); FX (2026-11-05): 1,737 ARS/EUR (MARKET_DATA)
Plant operator wage relative to the economy-wide average: 1 — · ENGINEERING_ASSUMPTION · MEDIUM
Plant operator ≈ economy-wide average (middle-income economy; no premium)
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
Inflation target + 0.5 pp wage drift
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Road transport of organic feedstock: 0.09962 USD/(t·km) · CALCULATED_VALUE · MEDIUM
0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Loading/unloading per tonne: 0.8842 USD/t · CALCULATED_VALUE · MEDIUM
0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
Customer electricity price (invoice split not verified): 0.09663 USD/kWh · USER_INPUT · MEDIUM
USER_INPUT 150 ARS/kWh / FX 1737.4511; Official EUR reference rate, 2026-11-05. Invoice date not supplied; energy/demand split assumed separately.
REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
cattle_solid_manure: dry matter: 30 % FM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
cattle_solid_manure: volatile solids: 60 % DM · MEASURED · MEDIUM
MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified
cattle_solid_manure: BMP (scenarios ± inter-laboratory spread): 150 L CH₄/kg VS · MEASURED · MEDIUM
MEASURED laboratory BMP test; replaces the catalogue value for this stream. Not independently verified.
REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified