Initial results free · reports paid · ≈ 3 minutes
Run the numbers for your biogas project
What the calculator tells you
In about three minutes you will know whether a biogas or biomethane plant on your own waste and residues is worth a paid feasibility study. The model uses your figures and, where you leave a field empty, market data for your country.
Free result
- A verdict with the reasons behind it, from “Strong candidate” to “Not recommended at this scale”.
- The range of the project’s net present value (NPV) and how firm the result is.
- Expected biogas output in Nm³ per year, the energy it yields and the size of the plant.
- The best use of the gas — CHP (power and heat), a boiler or biomethane — and what to check first.
Investment (CAPEX), payback, cash flow and the comparison of scenarios and risks are in the paid reports.
What you enter
- Your type of business and where the project is: the country sets energy prices, rules and support schemes, the region sets the climate.
- The feedstock: head counts for livestock, tonnes per year for residues. Wastewater, a landfill or an existing biogas plant can be entered too.
- Your energy use and prices, if you know them. Rough figures are fine; an empty field means “unknown”, and the model then uses an estimate and says so.
How the result is calculated
The model follows the path of a real plant: feedstock, methane yield, biogas, energy, then revenue and costs over the plant’s life. Prices come from official statistics where they exist (Eurostat, national regulators, EIA, World Bank); the climate of each region from the ERA5 reanalysis.
Grants and feed-in tariffs never enter the verdict: where a national scheme exists, its effect is shown as a separate case. All figures are pre-tax.
Methodology & sourcesWhat it is not
A screening estimate (AACE class 5), not a feasibility study and not a figure a bank will lend on. It separates clearly promising projects from clearly weak ones and shows the grey zone in between. A firm figure needs a lab analysis of your feedstock, supplier quotes and offtake contracts.