Metodoloji
Metodoloji ve varsayım kaydı
Hesaplama zinciri
Hammadde: hayvan sayısını toplanabilir tonaja, kuru maddeye, uçucu katılara ve metan verimine dönüştürülür, aylık mevsimsellik dikkate alınır. Atıklar miktar olarak girilir; atık su, düzenli depolama sahası ve mevcut biyogaz gaz akışı olarak girer.
Manure yield × collectable share → tonnes → dry matter → volatile solids → methane (L CH₄/kg VS).
Kaynak IPCC 2019 Refinement, Vol. 4 Ch. 10 (manure per head; North America: ASAE D384.2) · KTBL / FNR standard methane yields · laboratory BMP in L CH₄/kg VS at 0 °C, 101.325 kPa (VDI 4630; spread between laboratories: Hafner et al. 2020) · EPA LMOP first-order decay (landfill) · IPCC 2019, Vol. 5 Ch. 6 COD balance (wastewater)
Fermantör: bekletme süresi ve organik yük hacmi belirler. Kuru madde ve iklim teknoloji seçimini yönlendirir; ısı ihtiyacı aylık hesaplanır.
Volume = max(retention time, organic loading). CSTR / solids feeding / dry digestion / high-rate reactor / unheated covered lagoon (warm climates).
Kaynak FNR Guide to Biogas (2010), Table 8.4: retention time and organic loading · TA Luft 2021 / VDI 3475-4: gas-tight storage · ERA5 monthly climate of the site
Enerji: kojenerasyon, kazan veya biyometan. Önce fermantörün ısıtılması karşılanır, kalan ısı gerçek taleple eşleştirilir.
Monthly energy balance: CHP / boiler / biomethane; digester heat first.
Kaynak ISO 6976:2016 (heating value of methane) · manufacturers' CHP data sheets · DBFZ 2023 (plant electricity use) · SGC 2013:270 (methane slip in upgrading)
Ekonomi: ülkeye uyarlanmış CAPEX, OPEX, gelir ve tasarruflar. Ülke iskonto oranıyla 15 yıllık NBD, İVO ve DSCR.
Component CAPEX × country factor; OPEX; own use / export / heat / disposal / digestate. Pre-tax, nominal EUR, 15 years: NPV, IRR, simple and discounted payback, DSCR = EBITDA ÷ debt annuity. Not a bankable model (no tax, depreciation, working capital).
Kaynak DBFZ / IEE 2023 German reference plants (CAPEX anchors) · AACE Class 5 estimate · Eurostat, national regulators, EIA (prices) · Damodaran country-risk premium (discount rate)
Senaryolar: temkinli, baz ve iyimser durumlar, sekiz stres testi ve her destek programı için ayrı hesaplama.
Kaynak Triangular distributions sampled by Latin hypercube, 160 draws, fixed seed · expected value of perfect information (EVPI) · Directive (EU) 2018/2001 (RED II), Annex VI default values (climate case)
Değerlendirme: geri ödeme süresi, senaryo NBD değerleri, DSCR ve veri kalitesi. Teşvikler sonuca katılmaz; tek bir toplam puan kullanılmaz.
Kaynak EPA AgSTAR Project Development Handbook (2020), ch. 7: scope and accuracy of a pre-feasibility assessment
Modelin yapmadıkları
- Metan verimleri literatür aralıklarına dayanır. Kendi hammaddenizin laboratuvar analizi yine gereklidir.
- Öncelik atık ve artıklardadır. Enerji bitkileri (örn. mısır silajı) hammadde olarak girilebilir ancak otomatik eklenmez; destek programları da paylarını sık sık sınırlar.
- Destekler durum ve kaynaklarıyla ayrı gösterilir, değerlendirme sonucunu etkilemez.
- Vergiler, KDV, işletme sermayesi ve iskonto oranındaki riskin ötesindeki kur şokları dahil değildir.
- Mümkün olduğunda resmî istatistikler kullanılır. Eksikler ESTIMATE ve LOW ile işaretlenir. Sizin fiyatlarınız önceliklidir.
Eurostat · national regulators · EIA · World Bank · ERA5 climate · Damodaran country risk
- Bu bir ön değerlendirmedir, fizibilite etüdü değildir. Tasarım, güvenlik ve yatırım kararları uzman incelemesi gerektirir.
Ön değerlendirmeden inşaata
Biyogaz projeleri aşamalar halinde geliştirilir. Her aşama bir öncekinden pahalıdır ve belirsizliği daraltır; her biri bir kararla biter: devam etmek, konsepti yeniden ele almak ya da durmak. Methalytics ilk aşamayı kapsar.
- AACE sınıf 5Buradasınız
1. Ön değerlendirme
Proje daha ayrıntılı incelemeye değer mi ve önce neyin kontrol edilmesi gerekir? Hesap; miktarlarınıza ve faturalarınıza, hammaddenin tipik değerlerine, tarihli piyasa fiyatlarına ve benzer tesislerin maliyetlerine dayanır.
Gerçek maliyet tahminin %20–50 altında veya %30–100 üstünde çıkabilir
Birkaç dakika
- AACE sınıf 4
2. Etüt öncesi kontroller
Cevabın dayandığı olgular doğrulanıyor mu? Metan veriminin laboratuvar analizi (BMP), tedarikçi teklifleri, elektrik veya doğal gaz şebeke işletmecisinden bağlantı koşulları, hammadde tedarikçileri ve enerji alıcılarından niyet mektupları. Ücretli rapor bu kontrolleri projeniz için sıralar ve talep metinlerini hazırlar.
Gerçek maliyet tahminin %15–30 altında veya %20–50 üstünde çıkabilir
Birkaç haftadan iki aya kadar: yalnızca BMP testi yaklaşık bir ay sürer
- AACE sınıf 3
3. Fizibilite etüdü
Tesis inşa edilebilir, izinleri alınabilir ve finanse edilebilir mi, maliyeti ne olur? Hammadde, teknoloji, kütle ve enerji dengesi, saha, izinler ve bir bankanın değerlendirebileceği finansman planı.
Gerçek maliyet tahminin %10–20 altında veya %10–30 üstünde çıkabilir
Birkaç ay; küçük ve orta ölçekli projelerde yatırımın yaklaşık %1–3'ü
- AACE sınıf 2
4. Proje, sözleşmeler ve inşaat
Uygulama projesi, tedarikçi veya EPC sözleşmesi, izinler ve finansmanın kapanışı, ardından inşaat ve devreye alma.
Gerçek maliyet tahminin %5–15 altında veya %5–20 üstünde çıkabilir
Tahminlerin yerini sözleşme fiyatları alır
Bir aşamayı atlamak, doğrulanmamış rakamlar üzerine tesis kurmak demektir: EPA AgSTAR kötü planlamayı başarısız birçok biyogaz tesisinin temel nedeni olarak gösterir, UNIDO da ekipman tedarikçisinin “fizibilite etüdü”nün çoğu zaman yalnızca teknik bir çalışma olduğu, tarafsız bir değerlendirme olmadığı konusunda uyarır.
Ülkelere göre koşullar 33
Güvenilirlik: yeşil — HIGH, sarı — MEDIUM, kırmızı — LOW. Kaynak için bir değer seçin.
| Ülke | Veriler | Elektrik€/kWh | Şebekeye satış€/kWh | Gaz €/MWh LHV | İşgücü€/h | CAPEX× | İskonto oranı | Şebekeye biyometan | Destek programları |
|---|---|---|---|---|---|---|---|---|---|
| Almanya | resmî | evet | EEG 2023 Güllekleinanlage (açık); EEG Ausschreibung Biomasse (ihaleli) | ||||||
| Amerika Birleşik Devletleri | resmî | evet | RFS D3 RINs (açık); RFS D3 + California LCFS (manure RNG) (açık) | ||||||
| Arjantin | yaklaşık | — | — | ||||||
| Avusturya | resmî | evet | EAG Marktprämie Biogas (≤ 250 kW) (açık) | ||||||
| Birleşik Krallık | resmî | evet | Green Gas Support Scheme (açık) | ||||||
| Brezilya | resmî | — | — | ||||||
| Bulgaristan | resmî | — | — | ||||||
| Çekya | resmî | evet | Aukce MPO – provozní podpora biometanu (ihaleli) | ||||||
| Danimarka | resmî | evet | — | ||||||
| Estonya | resmî | evet | — | ||||||
| Finlandiya | resmî | — | Maatalouden investointituki – biokaasulaitos (açık) | ||||||
| Fransa | resmî | evet | Obligation d'achat biométhane injecté (kapanıyor) | ||||||
| Hindistan | resmî | — | GOBARdhan administered CBG price (açık) | ||||||
| Hollanda | resmî | evet | SDE++ 2026 – monomestvergisting (groen gas) (ihaleli); SDE++ 2026 – monomestvergisting (WKK) (ihaleli) | ||||||
| İspanya | resmî | evet | — | ||||||
| İsveç | resmî | — | Produktionsstöd biogas (ihaleli); Klimatklivet – biogas på gård (kapalı) | ||||||
| İtalya | resmî | evet | DM FER 2 – biogas ≤ 300 kW (ihaleli); DM 15/9/2022 + PNRR (40 % grant) (kapalı) | ||||||
| Kanada | resmî | evet | Utility RNG offtake (FortisBC, Énergir, Enbridge) (ihaleli) | ||||||
| Kazakistan | yaklaşık | — | — | ||||||
| Letonya | resmî | evet | ALTUM biometāna programma (kapalı) | ||||||
| Litvanya | resmî | evet | — | ||||||
| Macaristan | resmî | evet | Jedlik Ányos – biogáz/biometán (HUF 40 bn) (kapalı) | ||||||
| Meksika | resmî | — | — | ||||||
| Moldova | resmî | — | Tarif fix – biogaz (ANRE) (açık) | ||||||
| Polonya | resmî | evet | FIT/FIP biogaz rolniczy (≤ 1 MW) (açık); FIP biometan (≤ 1 MWe-eq.) (açık) | ||||||
| Romanya | resmî | — | — | ||||||
| Sırbistan | resmî | — | — | ||||||
| Slovakya | resmî | evet | Doplatok OZE – bioplyn ≤ 500 kW (açık) | ||||||
| Tayland | yaklaşık | — | VSPP/SPP biogas FiT 2022–2030 (kapalı) | ||||||
| Türkiye | resmî | — | YEKDEM – biyometanizasyon (açık) | ||||||
| Ukrayna | resmî | evet | Аукціон з ринковою премією (інші ВДЕ) — market-premium auction (ihaleli) | ||||||
| Vietnam | yaklaşık | — | — | ||||||
| Yunanistan | resmî | — | — |
Fizik ve proses 119
Fermantör: bekletme süresi ve organik yük hacmi belirler. Kuru madde ve iklim teknoloji seçimini yönlendirir; ısı ihtiyacı aylık hesaplanır.
| Parametre | Değer | Tür | Güven | Kaynak | Tarih |
|---|---|---|---|---|---|
Lower heating value of methane eng.ch4_lhv_kwh_m3 | 9,97 kWh/Nm³ CH₄ | FACT | HIGH | ISO 6976:2016, net calorific value of methane, real gas at 0 °C, 101.325 kPa; NIST WebBook check · GLOBAL | |
Global warming potential of biogenic CH₄ (100 y) eng.gwp_ch4 | 27 kgCO₂e/kgCH₄ | FACT | HIGH | IPCC AR6 WGI, Ch. 7, Table 7.15 (non-fossil CH₄, GWP100 27.0) · GLOBAL | |
Methane density at 0 °C, 1 atm eng.ch4_density_kg_m3 | 0,717 kg/m³ | FACT | HIGH | NIST Chemistry WebBook SRD 69, methane at 273.15 K, 101.325 kPa: 0.7175 kg/m³ · GLOBAL | |
Dry CO₂ density at 0 °C, 1 atm eng.co2_density_kg_m3 | 1,977 kg/Nm³ | FACT | HIGH | NIST Chemistry WebBook SRD 69, CO₂ at 273.15 K, 101.325 kPa: 1.9768 kg/m³ (real gas) · GLOBAL | |
Natural-gas combustion emission factor eng.gas_emission_factor_t_mwh | 0,202 tCO₂/MWh | FACT | HIGH | IPCC 2006 Guidelines, Vol. 2, Ch. 2, Table 2.2: natural gas 56.1 tCO₂/TJ (NCV) · GLOBAL | |
Natural gas lower heating value eng.natgas_lhv_kwh_m3 | 9,5 kWh/m³ | ASSUMPTION | LOW | ISO 6976:2016 basis; pipeline gas 8.5–10.5 kWh/m³ by grid and metering temperature; invoice value takes precedence · GLOBAL | |
Natural gas HHV/LHV conversion eng.gas_hhv_lhv_ratio | 1,11 — | FACT | HIGH | ISO 6976:2016 (methane GCV/NCV 1.110); IEA/Eurostat convention NCV ≈ 0.9 × GCV · GLOBAL | |
Year-1 output share (biological start-up) eng.rampup_year1 | 0,75 — | ASSUMPTION | LOW | FNR, Guide to Biogas, 5th ed. 2010, §5.3.2: target loading reached ≈ day 110; start-up losses added · GLOBAL | |
Mesophilic digester temperature eng.digester_temp_c | 38 °C | ASSUMPTION | HIGH | FNR, Guide to Biogas, 5th ed. 2010, §2.2.2, p. 23 (mesophilic 37–42 °C) · GLOBAL | |
Specific heat of substrate eng.cp_substrate_kj_kgk | 3,9 kJ/(kg·K) | ESTIMATE | MEDIUM | Calculated: water 4.18 (IAPWS-95) and solids ≈ 1.5 kJ/(kg·K), weighted for ≈ 10 % DM · GLOBAL | |
Insulated digester wall/roof U-value eng.digester_u_value_w_m2k 10 cm mineral wool / equivalent; poor insulation is a main cause of high winter heat demand | 0,35 W/(m²·K) | ESTIMATE | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, Table 3.30, p. 66 (insulation λ 0.03–0.05, 5–10 cm) · GLOBAL | |
Digester floor U-value (to ground) eng.digester_floor_u_value_w_m2k | 0,5 W/(m²·K) | ESTIMATE | LOW | FNR, Guide to Biogas, 5th ed. 2010, Table 3.30 (load-bearing floor insulation); indirect · GLOBAL | |
Digester height/diameter eng.digester_h_over_d | 0,45 — | ASSUMPTION | LOW | Engineering judgement, no published value: typical farm tanks 6–10 m high, 12–30 m diameter (0.25–0.6) · GLOBAL | |
Total/working volume (gas holder, freeboard) eng.headspace_factor | 1,15 — | ASSUMPTION | LOW | FNR, Guide to Biogas, 5th ed. 2010, Table 8.4, p. 162 (+10 % volume margin) + freeboard · GLOBAL | |
Hydraulic retention time, manure-dominated feed eng.hrt_manure_days Mesophilic CSTR on cattle/pig slurry typically 30–40 d | 35 d | ASSUMPTION | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, Table 8.4, p. 162 (minimum HRT 30 d) · GLOBAL | |
Hydraulic retention time, manure + co-substrates eng.hrt_mixed_days | 30 d | ASSUMPTION | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, Table 8.4, p. 162 (minimum HRT 30 d) · GLOBAL | |
Hydraulic retention time when straw (pretreatment feedstocks) carries > 30 % of the VS eng.hrt_straw_days | 65 d | ASSUMPTION | MEDIUM | Danish Energy Agency, Technology Data for Renewable Fuels, ch. 81 Biogas Plants: the straw yield of 9.5 GJ CH4/t VS is stated at 65 days HRT; longer HRT raises it · GLOBAL | |
Hydraulic retention time, easily degradable waste eng.hrt_waste_days | 25 d | ASSUMPTION | LOW | Engineering judgement, no published value: readily degradable waste; below the 30 d farm-plant minimum (FNR 2010) · GLOBAL | |
Hydraulic retention time, high-rate reactor (UASB/EGSB) on dilute effluent eng.hrt_high_rate_days | 2 d | ASSUMPTION | LOW | van Lier et al., Rev. Environ. Sci. Biotechnol. 14 (2015): UASB HRT typically hours to 1 d, sizing OLR-driven; 2 d is conservative · GLOBAL | |
Max organic loading rate, high-rate reactor eng.olr_high_rate_kgvs_m3d | 8 kgVS/(m³·d) | ASSUMPTION | LOW | van Lier et al., Rev. Environ. Sci. Biotechnol. 14 (2015): UASB 10–15 kgCOD/(m³·d); low end on VS basis · GLOBAL | |
Hydraulic retention time, covered lagoon (warm climate) eng.hrt_lagoon_days | 40 d | ASSUMPTION | LOW | Engineering judgement, no published value: covered lagoons for POME / pig slurry 35–60 d · GLOBAL | |
Lowest annual mean air temperature at which a covered lagoon is offered eng.lagoon_min_mean_c | 15 °C | ASSUMPTION | LOW | Engineering judgement, no published value: operating US covered lagoons with read output sit at annual means of ≈ 15–18 °C (EPA AgSTAR: CA Central Valley, NC, MS); the one colder lagoon (PA) reads 2.7× below the heated-tank model · GLOBAL | |
Covered lagoon: methane ÷ heated tank on the same feed eng.lagoon_yield_factor | 0,85 — | CALCULATION | LOW | EPA AgSTAR Livestock AD Database (2024-06), covered lagoons with a read electricity value and electricity as the only gas use: heated-tank model ÷ reported, calibration half median 1.13 against 1.02 for heated tanks (≈ 0.9), holdout half ≈ 0.8; n = 7, self-reported; applied below a 20 °C annual mean only (where the plants sit) · GLOBAL | |
Max organic loading rate, covered lagoon eng.olr_lagoon_kgvs_m3d | 1 kgVS/(m³·d) | ASSUMPTION | LOW | Engineering judgement, no published value: low-rate unmixed lagoon, warm climate only · GLOBAL | |
Max organic loading rate, mesophilic CSTR eng.olr_max_kgvs_m3d Hard cap used for digester volume; poultry/fat-rich mixes use a lower cap | 3,5 kgVS/(m³·d) | ASSUMPTION | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, Table 8.4, p. 162 (≤ 2.5 overall, ≤ 5.0 first stage); upper end for one stage · GLOBAL | |
Max OLR when poultry/fat > 35 % of VS eng.olr_max_poultry_kgvs_m3d | 2,5 kgVS/(m³·d) | ASSUMPTION | LOW | FNR, Guide to Biogas, 5th ed. 2010, Table 8.4, p. 162 (conservative cap ≤ 2.5) · GLOBAL | |
Digestate storage required (closed spreading season) eng.storage_months | 6 months | ASSUMPTION | MEDIUM | Düngeverordnung 2017, §12(2): 6 months (9 without own land); national rules differ · GLOBAL | |
Delivered feedstock that actually arrives, low end (what to verify first) eng.supply_shortfall_low | 0,7 — | ASSUMPTION | LOW | Engineering judgement, no published value: documented plants ran short of promised feed: Fiscalini CA at 57 % of capacity, feed-limited (US DOE final report, OSTI 2011); Harderwijk NL 5 of 8 Mm³ planned gas (AEF 2022); UC Davis study: less feedstock than anticipated (2011) · GLOBAL | |
Change of traded feedstock prices and gate fees over the loan period (what to verify first) eng.feed_price_shift | 0,25 — | ASSUMPTION | LOW | Engineering judgement, no published value: ±25 % of each line's net price; Harderwijk NL failed on dearer co-products and lower manure gate fees than in the business case (AEF evaluation 2022) · GLOBAL | |
Digestate storage where the climate has no closed spreading season (annual mean ≥ 20 °C) eng.storage_months_warm | 3 months | ASSUMPTION | LOW | Engineering judgement, no published value: year-round growing season, so mainly a wet-season / crop-free-day buffer (3 months chosen on the cautious side, not a surveyed rule); local rules and wet-season spreading bans must be checked · GLOBAL | |
Gas-tight retention incl. digester (new plants) eng.gastight_retention_days | 150 d | ASSUMPTION | MEDIUM | TA Luft 2021 / VDI 3475-4: ≥ 150 d in a gas-tight system for new plants; small slurry plants may be exempt · GLOBAL | |
Plant electricity use, minimum per tonne (pumping, mixing of dilute feed) eng.parasitic_base_kwh_t | 3 kWh/t FM | ESTIMATE | LOW | Naegele et al., Energies 5 (2012): slurry plants; floor for dilute feed with little gas · GLOBAL | |
Mechanical size reduction of straw (milling), electricity eng.pretreatment_milling_kwh_t Mill CAPEX and any steam-explosion / alkali step are not modelled | 66,6 kWh/t FM | ESTIMATE | LOW | Dell'Omo et al., Methane 4(1) (2025): industrial-scale mill, > 1 t/h, 66.6 kWh per tonne of wheat straw; one device, no steam or alkali pretreatment · GLOBAL | |
Plant electricity use as a share of methane energy (LHV) eng.parasitic_share_gas_energy | 0,032 — | ESTIMATE | MEDIUM | DBFZ 05/2023 reference plants: own use 8 % of electricity at 36–41 % el. efficiency; Naegele 2012: 8.5 % · GLOBAL | |
ABP pasteurisation temperature used in screening eng.pasteurisation_temp_c | 70 °C | FACT | HIGH | EU Regulation 142/2011, Annex V, Ch. III: 70 °C for 60 min, particles ≤ 12 mm · GLOBAL | |
Heat recovery from ABP pasteurisation before mesophilic digestion eng.pasteurisation_heat_recovery | 0,6 — | ASSUMPTION | LOW | Engineering judgement, no published value: regenerative heat exchanger 50–75 %; supplier heat balance needed · GLOBAL | |
Share of feed nitrogen retained in digestate eng.digestate_n_retention | 0,95 — | ESTIMATE | MEDIUM | Düngeverordnung 2017, Anlage 2: digestate N counted at ≥ 95 % after storage losses · GLOBAL | |
Share of customer electricity load coinciding with biogas generation eng.self_consumption_coincidence | 0,85 — | ASSUMPTION | LOW | Engineering judgement, no published value: CHP runs ≈ 24/7; customer load profile needed · GLOBAL | |
Avoidable share of an unsplit customer electricity bill eng.invoice_variable_share | 0,85 — | ASSUMPTION | LOW | Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence · GLOBAL | |
Poultry share of VS above which NH₃ inhibition starts eng.poultry_inhib_threshold | 0,35 — | ESTIMATE | LOW | FNR, Guide to Biogas, 5th ed. 2010, Table 2.2, p. 26 (inhibition at NH₄-N > 3.0–3.5 g/L); poultry share is a proxy · GLOBAL | |
Yield loss per 10 pp poultry VS above threshold eng.poultry_inhib_loss_per_10pct | 0,04 — | ESTIMATE | LOW | Engineering judgement, no published value: site-specific; lab BMP and NH₄-N test needed · GLOBAL | |
Fat/grease share of VS above which overload risk eng.fat_share_warning | 0,25 — | ESTIMATE | LOW | Long et al., Process Saf. Environ. Prot. 90 (2012): stable FOG co-digestion up to ≈ 30 % of VS · GLOBAL | |
Ammonium nitrogen in the digester above which methanogens are inhibited eng.ammonium_inhib_g_l | 3 g NH₄-N/L | ESTIMATE | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, Table 2.2, p. 26: inhibition at NH₄-N > 3.0–3.5 g/L (lower bound used); FNR §5.1.9 Tab. 5.3 cites > 3 000 mg/L NH₄ as inhibiting; compared with the estimated NH₄-N (eng.ammonium_share_of_n) · GLOBAL | |
NH₄-N in the digester up to which continued digestion is documented (end of the FNR data series) eng.ammonium_documented_max_g_l | 7,3 g NH₄-N/L | CALCULATION | LOW | FNR, Guide to Biogas, 5th ed. 2010, §5.1.9 Tab. 5.3 (source [5-21]): digestion still ran (degree of degradation 56 %) at 257 mg/L free NH₃, 2.42 × the 106 mg/L of fully stable operation; 2.42 × the 3.0 g/L NH₄-N threshold (eng.ammonium_inhib_g_l) = 7.3 g/L. Above it the yield cut is an extrapolation, so the verdict cannot be strong without a dilution or co-digestion design · GLOBAL | |
Dry matter of the digester content in wet digestion (still pumpable) eng.wet_digester_dm_max | 0,12 — | FACT | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, §2.2 (pp. 22–23): wet digestion of energy crops at ≈ 12 % DM in the digester, "generally still pumpable"; at 15–16 % and above no longer pumpable (dry digestion) · GLOBAL | |
Share of total nitrogen present as ammonium nitrogen in the digester content eng.ammonium_share_of_n | 0,6 — | ESTIMATE | MEDIUM | LfL Bayern, Basisdaten Tab. 5a (Nov 2024): liquid biogas digestate 6.0 kg N and 3.60 kg NH₄-N per m³ (60 %), after storage losses; digestion mineralises organic N, so the share in the digester is at least this · GLOBAL | |
Methane-yield loss per unit of NH₄-N above the inhibition threshold, relative to the threshold eng.ammonium_loss_per_rel | 0,157 — | ESTIMATE | LOW | FNR, Guide to Biogas, 5th ed. 2010, §5.1.9 Tab. 5.3 (source [5-21]): degree of degradation 71 / 62 / 61 / 56 % at 106 / 155 / 207 / 257 mg/L free NH₃, i.e. 0.87 / 0.86 / 0.79 of the stable level at 1.46 / 1.95 / 2.42 × the concentration; least-squares slope through the stable point 0.157 per +100 %. Free NH₃ is proportional to NH₄-N at fixed pH and temperature (FNR Eq. 5.3), so the ratio is transferred to NH₄-N; acclimated plants (months of adaptation, FNR) tolerate more, so this is a central, not a worst case · GLOBAL | |
Sodium in the digester above which methanogens are moderately inhibited eng.sodium_inhib_g_l | 3,5 g Na⁺/L | ESTIMATE | MEDIUM | McCarty (1964) Tab. via Holmes & Blanc, J. Boston Soc. Civ. Eng. 62(3) (1975) Tab. 3: Na⁺ stimulatory 0.1–0.2, moderately inhibitory 3.5–5.5, strongly inhibitory 8 g/L (lower bound used); acclimated sludge tolerates more · GLOBAL | |
Sodium in the digester above which methanogens are strongly inhibited eng.sodium_strong_inhib_g_l | 8 g Na⁺/L | ESTIMATE | MEDIUM | McCarty (1964) Tab. via Holmes & Blanc, J. Boston Soc. Civ. Eng. 62(3) (1975) Tab. 3: strongly inhibitory 8 g Na⁺/L · GLOBAL | |
Total polyphenols in the digester above which methane formation is inhibited eng.polyphenol_inhib_g_l | 0,6 g/L | ESTIMATE | LOW | Zema et al., J. Agric. Eng. 49(2) 792 (2018): keep polyphenols < 0.6 g/L, published range 0.6–2 g/L, no consensus value; blends with > 20 % v/v three-phase olive mill wastewater inhibited · GLOBAL | |
Share of VS from olive pomace above which no stable continuous digestion is documented eng.phenolic_share_max | 0,65 — | ESTIMATE | LOW | Correa et al., Biotechnol. Biofuels Bioprod. 2025 (PMC12625033): semi-continuous CSTR at 1 g VS/(L·d), 21 d: alperujo alone 53 L CH4/kg VS (BMP 284), 65 % alperujo + 35 % pig manure (VS) 283; one study · GLOBAL | |
Inter-laboratory spread of a laboratory BMP (relative standard deviation) eng.lab_bmp_rsd | 0,08 — | ESTIMATE | MEDIUM | Hafner et al., Water 12(6) 1752 (2020), doi:10.3390/w12061752: RSD between laboratories < 8 % for tests meeting the validation criteria (7.5–24 % without) · GLOBAL | |
Nominal frequency of the public grid (selects the 50 or 60 Hz engine catalogue) eng.grid_hz | 60 Hz | FACT | MEDIUM | Itaipu Binacional, FAQ 7: "dez [unidades] operam em 50 Hz, frequência usada no Paraguai, e dez em 60 Hz, frequência utilizada no Brasil". itaipu.gov.br (read 2026-11-08); ANEEL PRODIST refuses automated requests, so not the regulator's text · BR | |
CHP full-load hours ÷ 8 760 of a plant sized to its gas (availability × load) eng.plant_availability Measured on German manure CHP; also applied to sewage and landfill gas engines. No metered per-plant data elsewhere: US EIA-923/860 capacity factors (farm engines ≥ 1 MW) and French ODRÉ injection ÷ 'capacité théorique' mix operation with oversizing. Monte Carlo and scenarios keep their ±6–8 % spread, not this between-plant range | 0,891 — | ESTIMATE | LOW | No national metered per-plant data: German median as a stand-in, and the German between-plant p10–p90 (4 650–8 633 h ÷ median 7 801 h = × 0.60–1.11) as its range: a German distribution, not a measurement of this country's plants. German TSOs, EEG annual statement 2025 (netztransparenz.de): metered kWh (fed-in + reported own use) ÷ installed kW of non-flexible small manure CHP units ≤ 75 kW (§ 27b/46/44 EEG: sized to the farm's manure, no flexibility premium, no rated-output cap), median 7 801 h (n 786; halves 7 782 / 7 825), p10–p90 4 650–8 633 h between plants. Realised hours include gas shortfall; the model applies them to a plant sized to its gas · BR | |
Biogas boiler efficiency eng.boiler_efficiency | 0,9 — | ASSUMPTION | MEDIUM | Engineering judgement, no published value: non-condensing gas boiler 88–92 % (NCV) · GLOBAL | |
CH₄ slip in membrane upgrading eng.upgrade_slip_share | 0,007 — | ESTIMATE | MEDIUM | SGC Rapport 2013:270, Biogas upgrading: review of commercial technologies, §3.3 (membranes ≈ 0.5 %) · GLOBAL | |
CH₄ content of biomethane eng.biomethane_ch4_purity | 0,97 — | ASSUMPTION | MEDIUM | SGC Rapport 2013:270, §2.3; EU grid entry typically 97–98 % CH₄ · GLOBAL | |
Electricity for upgrading + compression eng.upgrade_kwh_per_nm3_raw | 0,3 kWh/Nm³ raw biogas | ESTIMATE | MEDIUM | SGC Rapport 2013:270, §2.3, §3.2 (membranes 0.20–0.30 kWh/Nm³ raw) · GLOBAL | |
Additional compression of biomethane to ~250 bar for road CNG eng.cng_compression_kwh_nm3 | 0,15 kWh/Nm³ biomethane | ESTIMATE | MEDIUM | Burckhardt Compression, CNG compressor technical sheet, 2022 (≈ 0.13–0.16 kWh/Nm³) · GLOBAL | |
Raw-biogas flow below which biomethane is flagged as sub-scale eng.upgrade_min_nm3h | 60 Nm³/h | ASSUMPTION | LOW | Engineering judgement, no published value: smallest commercial membrane units ≈ 50–100 Nm³/h raw · GLOBAL | |
Fresh-matter density of maize silage in a clamp eng.silage_density_kg_m3 | 780 kg FM/m³ | ESTIMATE | MEDIUM | LfL Bayern, Orientierungsbereiche Verdichtung von Gras- und Maissilagen: maize at 33 % DM 250–265 kg DM/m³ = 760–800 kg FM/m³ · GLOBAL | |
Distance to the gas grid when the client leaves it empty eng.gas_grid_default_km | 2 km | ASSUMPTION | LOW | Engineering judgement, no published value: placeholder for an unknown site; the client's distance replaces it — the grid operator's connection point decides · GLOBAL | |
N application ceiling from organic fertiliser eng.nitrates_limit_kg_n_ha | 170 kgN/ha·a | FACT | HIGH | Nitrates Directive 91/676/EEC, Annex III(2); UA alignment pending · GLOBAL | |
Extra plant-available N from digesting own manure eng.digestate_n_gain_own_manure | 0,15 of total N | ESTIMATE | LOW | Möller & Müller, Eng. Life Sci. 12 (2012): digestion raises the NH₄ share (10–25 %) · GLOBAL | |
Substitution credit for nutrients in imported waste eng.digestate_n_credit_imported | 0,6 of total N | ESTIMATE | MEDIUM | Düngeverordnung 2017 (2020), Anlage 3: liquid digestate 60 % N efficiency · GLOBAL | |
Substitution credit for P, K in imported waste eng.digestate_pk_credit_imported | 0,5 of total | ESTIMATE | LOW | AHDB Nutrient Management Guide (RB209), Section 2: P ≈ 50–60 %, K ≈ 80–90 % in year 1 · GLOBAL | |
Methane loss share considered good practice eng.methane_loss_good | 0,02 of production | ASSUMPTION | MEDIUM | IEA Bioenergy Task 37, Methane emissions from biogas plants, 2017, pp. 41–44 · GLOBAL | |
Methane loss share that cancels most climate benefit eng.methane_loss_high | 0,05 of production | ASSUMPTION | MEDIUM | IEA Bioenergy Task 37, 2017, pp. 41–44 (biowaste plants lose the benefit at ≈ 3.5–5.5 %) · GLOBAL | |
DM above which high-solids digestion is considered eng.dry_digestion_dm_pct | 22 % | ASSUMPTION | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, §3.1.1, p. 33; Table 8.4 (wet ≤ 12 % in digester; dry 20–30 % feed) · GLOBAL | |
DM above which a solids feeder / recirculation is needed eng.wet_solids_feeding_dm_pct | 12 % | ASSUMPTION | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, §2.2.1, p. 23 (pumpable up to ≈ 12 % DM) · GLOBAL | |
Relative band of catalogue DM × VS when the client gives no measured value eng.unc_catalogue_solids | 0,2 ± share | ESTIMATE | LOW | IPCC 2006 GL Vol. 4 §10.4.4: Tier 2 manure CH₄ factors, built from VS excretion and B0, carry ±20 %; applied here to catalogue DM × VS only (B0 has its own catalogue range) · GLOBAL | |
Relative band of a laboratory BMP value eng.unc_lab_bmp | 0,08 ± share | ESTIMATE | MEDIUM | Hafner et al. 2020, Water 12(6):1752: between-laboratory RSD < 8 % when validation criteria are met (7.5–24 % without them) · GLOBAL | |
RED default, biomethane from manure, open digestate, off-gas not combusted eng.ghg.bm.manure.open | 22 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from manure, open digestate, off-gas combusted eng.ghg.bm.manure.open_offgas | 1 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from manure, closed digestate, off-gas not combusted eng.ghg.bm.manure.closed | -79 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from manure, closed digestate, off-gas combusted eng.ghg.bm.manure.closed_offgas | -100 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas for electricity from manure (case 1), open digestate eng.ghg.el.manure.open | 3 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas for electricity from manure (case 1), closed digestate eng.ghg.el.manure.closed | -84 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas in a boiler from manure (case 3), open digestate eng.ghg.heat.manure.open | 9 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas in a boiler from manure (case 3), closed digestate eng.ghg.heat.manure.closed | -89 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED energy yield P(manure) for co-digestion weighting eng.ghg.yield.manure | 0,5 MJ biogas/kg FM | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B · GLOBAL | |
RED standard moisture SM(manure) eng.ghg.moisture.manure | 0,9 kg water/kg FM | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B · GLOBAL | |
RED default, biomethane from maize, open digestate, off-gas not combusted eng.ghg.bm.maize.open | 73 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from maize, open digestate, off-gas combusted eng.ghg.bm.maize.open_offgas | 52 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from maize, closed digestate, off-gas not combusted eng.ghg.bm.maize.closed | 51 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from maize, closed digestate, off-gas combusted eng.ghg.bm.maize.closed_offgas | 30 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas for electricity from maize (case 1), open digestate eng.ghg.el.maize.open | 47 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas for electricity from maize (case 1), closed digestate eng.ghg.el.maize.closed | 28 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas in a boiler from maize (case 3), open digestate eng.ghg.heat.maize.open | 59 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas in a boiler from maize (case 3), closed digestate eng.ghg.heat.maize.closed | 38 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED energy yield P(maize) for co-digestion weighting eng.ghg.yield.maize | 4,16 MJ biogas/kg FM | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B · GLOBAL | |
RED standard moisture SM(maize) eng.ghg.moisture.maize | 0,65 kg water/kg FM | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B · GLOBAL | |
RED default, biomethane from biowaste, open digestate, off-gas not combusted eng.ghg.bm.biowaste.open | 71 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from biowaste, open digestate, off-gas combusted eng.ghg.bm.biowaste.open_offgas | 50 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from biowaste, closed digestate, off-gas not combusted eng.ghg.bm.biowaste.closed | 35 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from biowaste, closed digestate, off-gas combusted eng.ghg.bm.biowaste.closed_offgas | 14 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas for electricity from biowaste (case 1), open digestate eng.ghg.el.biowaste.open | 44 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas for electricity from biowaste (case 1), closed digestate eng.ghg.el.biowaste.closed | 13 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas in a boiler from biowaste (case 3), open digestate eng.ghg.heat.biowaste.open | 57 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas in a boiler from biowaste (case 3), closed digestate eng.ghg.heat.biowaste.closed | 22 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED energy yield P(biowaste) for co-digestion weighting eng.ghg.yield.biowaste | 3,41 MJ biogas/kg FM | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B · GLOBAL | |
RED standard moisture SM(biowaste) eng.ghg.moisture.biowaste | 0,76 kg water/kg FM | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B · GLOBAL | |
RED default addition for compressed biomethane as transport fuel eng.ghg.cbm_transport_add | 4,6 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED fossil comparator, electricity (per MJ electricity) eng.ghg.comparator_el | 183 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B, point 19 · GLOBAL | |
RED Carnot share for useful heat below 150 °C (CHP allocation) eng.ghg.carnot_heat_150c | 0,3546 — | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B, point 1(d) · GLOBAL | |
RED fossil comparator, useful heat (per MJ heat) eng.ghg.comparator_heat | 80 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B, point 19 · GLOBAL | |
RED fossil comparator, transport fuel eng.ghg.comparator_transport | 94 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B, point 19 · GLOBAL | |
RED minimum saving, electricity/heat from installations starting 2026 or later eng.ghg.min_saving_el_heat | 0,8 — | FACT | HIGH | Directive (EU) 2018/2001, Art. 29(10)(d) · GLOBAL | |
RED minimum saving, transport biogas from installations starting 2021 or later eng.ghg.min_saving_transport | 0,65 — | FACT | HIGH | Directive (EU) 2018/2001, Art. 29(10)(c) · GLOBAL | |
RED sustainability criteria apply to gaseous biomass fuel installations from this total rated thermal input eng.ghg.min_input_mw | 2 MW | FACT | HIGH | Directive (EU) 2018/2001, Art. 29(1) · GLOBAL | |
Manure per dairy cow and year eng.animal.dairy_cow.t_head_year | 13,6 t/head·a | CALCULATION | MEDIUM | IPCC 2019 Refinement Vol. 4 ch. 10, Table 10.13A (7.9 kg VS per 1 000 kg mass·d) × Table 10A.5 (508 kg), Latin America: 4.01 kg VS/head·d (regional default, not a national Tier 2 value); as excreted 12.8 % DM, VS 84 % of DM (USDA NRCS AWMFH ch. 4, 2008, from ASAE D384.2, a US composition); mass = VS ÷ (DM × VS share) · BR | |
Dry matter of dairy cow manure eng.animal.dairy_cow.dm_pct | 12,8 % FM | CALCULATION | MEDIUM | IPCC 2019 Refinement Vol. 4 ch. 10, Table 10.13A (7.9 kg VS per 1 000 kg mass·d) × Table 10A.5 (508 kg), Latin America: 4.01 kg VS/head·d (regional default, not a national Tier 2 value); as excreted 12.8 % DM, VS 84 % of DM (USDA NRCS AWMFH ch. 4, 2008, from ASAE D384.2, a US composition); mass = VS ÷ (DM × VS share) · BR | |
Volatile solids of dairy cow manure eng.animal.dairy_cow.vs_pct_dm | 84 % DM | FACT | MEDIUM | IPCC 2019 Refinement Vol. 4 ch. 10, Table 10.13A (7.9 kg VS per 1 000 kg mass·d) × Table 10A.5 (508 kg), Latin America: 4.01 kg VS/head·d (regional default, not a national Tier 2 value); as excreted 12.8 % DM, VS 84 % of DM (USDA NRCS AWMFH ch. 4, 2008, from ASAE D384.2, a US composition); mass = VS ÷ (DM × VS share) · BR | |
Manure per laying hen and year eng.animal.layer_hen.t_head_year | 0,0283 t/head·a | CALCULATION | MEDIUM | IPCC 2019 Refinement Vol. 4 ch. 10, Table 10.13A (10.1 kg VS per 1 000 kg mass·d) × Table 10A.5 (1.4 kg), Latin America: 14.1 g VS/hen·d (regional default, not a national Tier 2 value); as excreted 25 % DM, VS 73 % of DM (USDA NRCS AWMFH ch. 4, 2008, from ASAE D384.2, a US composition); mass = VS ÷ (DM × VS share) · BR | |
Dry matter of laying hen manure eng.animal.layer_hen.dm_pct | 25 % FM | CALCULATION | MEDIUM | IPCC 2019 Refinement Vol. 4 ch. 10, Table 10.13A (10.1 kg VS per 1 000 kg mass·d) × Table 10A.5 (1.4 kg), Latin America: 14.1 g VS/hen·d (regional default, not a national Tier 2 value); as excreted 25 % DM, VS 73 % of DM (USDA NRCS AWMFH ch. 4, 2008, from ASAE D384.2, a US composition); mass = VS ÷ (DM × VS share) · BR | |
Volatile solids of laying hen manure eng.animal.layer_hen.vs_pct_dm | 73 % DM | FACT | MEDIUM | IPCC 2019 Refinement Vol. 4 ch. 10, Table 10.13A (10.1 kg VS per 1 000 kg mass·d) × Table 10A.5 (1.4 kg), Latin America: 14.1 g VS/hen·d (regional default, not a national Tier 2 value); as excreted 25 % DM, VS 73 % of DM (USDA NRCS AWMFH ch. 4, 2008, from ASAE D384.2, a US composition); mass = VS ÷ (DM × VS share) · BR | |
Manure per young / beef cattle and year eng.animal.cattle_other.t_head_year | 9,3 t/head·a | FACT | LOW | DüV 2017 Anlage 9 Tab. 1 row 2 (young-stock slurry 4.65 m³ per place·6 months) × 2; 7.5 % DM per LfL Basisdaten Tab. 5a (Nov 2024); VS 80 % of DM (FNR); German norm transferred, no national value; IPCC 2019 Latin America other cattle as excreted 2.58 kg VS/head·d is an upper bound · BR | |
Dry matter of young / beef cattle manure eng.animal.cattle_other.dm_pct | 7,5 % FM | FACT | LOW | DüV 2017 Anlage 9 Tab. 1 row 2 (young-stock slurry 4.65 m³ per place·6 months) × 2; 7.5 % DM per LfL Basisdaten Tab. 5a (Nov 2024); VS 80 % of DM (FNR); German norm transferred, no national value; IPCC 2019 Latin America other cattle as excreted 2.58 kg VS/head·d is an upper bound · BR | |
Volatile solids of young / beef cattle manure eng.animal.cattle_other.vs_pct_dm | 80 % DM | FACT | LOW | DüV 2017 Anlage 9 Tab. 1 row 2 (young-stock slurry 4.65 m³ per place·6 months) × 2; 7.5 % DM per LfL Basisdaten Tab. 5a (Nov 2024); VS 80 % of DM (FNR); German norm transferred, no national value; IPCC 2019 Latin America other cattle as excreted 2.58 kg VS/head·d is an upper bound · BR |
Kojenerasyon (CHP) 64
CHP — kojenerasyon: biyogaz motoru aynı anda elektrik ve kullanılabilir ısı üretir.
| Parametre | Değer | Tür | Güven | Kaynak | Tarih |
|---|---|---|---|---|---|
CHP reference electrical efficiency at 20 kW eng.chp_eta_el_20 | 0,297 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 20 kW eng.chp_eta_th_20 | 0,614 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 30 kW eng.chp_eta_el_30 | 0,309 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 30 kW eng.chp_eta_th_30 | 0,608 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 44 kW eng.chp_eta_el_44 | 0,326 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 44 kW eng.chp_eta_th_44 | 0,583 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 83 kW eng.chp_eta_el_83 | 0,35 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 83 kW eng.chp_eta_th_83 | 0,506 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 106 kW eng.chp_eta_el_106 | 0,366 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 106 kW eng.chp_eta_th_106 | 0,49 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 124 kW eng.chp_eta_el_124 | 0,369 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 124 kW eng.chp_eta_th_124 | 0,491 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 166 kW eng.chp_eta_el_166 | 0,377 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 166 kW eng.chp_eta_th_166 | 0,493 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 182 kW eng.chp_eta_el_182 | 0,391 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 182 kW eng.chp_eta_th_182 | 0,48 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 200 kW eng.chp_eta_el_200 | 0,391 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 200 kW eng.chp_eta_th_200 | 0,479 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 354 kW eng.chp_eta_el_354 | 0,402 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 354 kW eng.chp_eta_th_354 | 0,451 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 430 kW eng.chp_eta_el_430 | 0,394 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 430 kW eng.chp_eta_th_430 | 0,464 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 528 kW eng.chp_eta_el_528 | 0,402 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 528 kW eng.chp_eta_th_528 | 0,445 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 600 kW eng.chp_eta_el_600 | 0,427 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 600 kW eng.chp_eta_th_600 | 0,436 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 800 kW eng.chp_eta_el_800 | 0,431 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 800 kW eng.chp_eta_th_800 | 0,433 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 999 kW eng.chp_eta_el_999 | 0,426 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 999 kW eng.chp_eta_th_999 | 0,464 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 1200 kW eng.chp_eta_el_1200 | 0,43 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 1200 kW eng.chp_eta_th_1200 | 0,46 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 1560 kW eng.chp_eta_el_1560 | 0,426 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 1560 kW eng.chp_eta_th_1560 | 0,464 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 1840 kW eng.chp_eta_el_1840 | 0,436 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 1840 kW eng.chp_eta_th_1840 | 0,436 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 2300 kW eng.chp_eta_el_2300 | 0,434 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 2300 kW eng.chp_eta_th_2300 | 0,434 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 27 kW, 60 Hz eng.chp60_eta_el_27 | 0,32 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 27 kW, 60 Hz eng.chp60_eta_th_27 | 0,577 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 94 kW, 60 Hz eng.chp60_eta_el_94 | 0,337 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 94 kW, 60 Hz eng.chp60_eta_th_94 | 0,527 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 191 kW, 60 Hz eng.chp60_eta_el_191 | 0,368 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 191 kW, 60 Hz eng.chp60_eta_th_191 | 0,503 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 375 kW, 60 Hz eng.chp60_eta_el_375 | 0,387 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 375 kW, 60 Hz eng.chp60_eta_th_375 | 0,492 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 555 kW, 60 Hz eng.chp60_eta_el_555 | 0,383 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 555 kW, 60 Hz eng.chp60_eta_th_555 | 0,484 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 600 kW, 60 Hz eng.chp60_eta_el_600 | 0,417 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 600 kW, 60 Hz eng.chp60_eta_th_600 | 0,448 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 800 kW, 60 Hz eng.chp60_eta_el_800 | 0,419 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 800 kW, 60 Hz eng.chp60_eta_th_800 | 0,446 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 1200 kW, 60 Hz eng.chp60_eta_el_1200 | 0,428 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 1200 kW, 60 Hz eng.chp60_eta_th_1200 | 0,44 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 1560 kW, 60 Hz eng.chp60_eta_el_1560 | 0,423 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 1560 kW, 60 Hz eng.chp60_eta_th_1560 | 0,445 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 2000 kW, 60 Hz eng.chp60_eta_el_2000 | 0,427 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 2000 kW, 60 Hz eng.chp60_eta_th_2000 | 0,44 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
Sewage-gas engines: realised electrical efficiency ÷ datasheet at the unit size eng.chp_sewage_site_factor | 0,8 — | CALCULATION | LOW | US EIA-923 (2025, digester gas OBG, reciprocating engines: net MWh ÷ fuel for electricity, HHV) with EIA-860 (2025) nameplate per unit, against the TEDOM 60 Hz datasheet (US grid): 13 wastewater plants, median 0.79 (p10–p90 0.70–0.99; calibration half 0.83, holdout 0.79); capacity factor median 0.36 (part load). Net of the engines' own use; siloxanes and part load as on landfill gas · GLOBAL | |
Landfill-gas engines: realised electrical efficiency ÷ datasheet at the unit size eng.chp_landfill_site_factor | 0,8 — | ESTIMATE | MEDIUM | US EPA LMOP Landfill and Project Database (2024-09, 2022 data): 284 reciprocating-engine projects, actual MW ÷ methane delivered (LHV) ÷ TEDOM 60 Hz full-load value (US grid) = median 0.81 (p10–p90 0.68–0.92), same in every load band; fitted on half the projects (0.81), 0.80 on the other half. LMOP defines its MW as actual OR estimated and the flow as current or planned, so this is not purely metered. Part load, siloxanes, ageing; AD biogas engines keep the datasheet (AgSTAR heated tanks median 0.95) · GLOBAL | |
Heat delivery allowance after rated CHP thermal output eng.chp_heat_recovery | 0,92 — | ESTIMATE | LOW | Engineering judgement, no published value: 5–10 % piping and exchanger losses from CHP to the user · GLOBAL | |
CHP design full-load hours eng.chp_design_hours | 8.000 h/a | ASSUMPTION | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, Table 8.4, p. 162 (8 000 full-load h/a); flexible operation lowers hours · GLOBAL | |
Smallest CHP the model treats as technically sensible eng.chp_min_kw Below this, CHP is a hobby-scale installation; model returns NOT RECOMMENDED unless another route works | 25 kWel | ASSUMPTION | LOW | TEDOM Basic Technical Data, BIOGAS 50 Hz, 03/2025: smallest unit 20 kWel · GLOBAL | |
Unburned CH₄ (methane slip) in CHP exhaust eng.chp_slip_share | 0,01 — | ESTIMATE | MEDIUM | IEA Bioenergy Task 37, Methane emissions from biogas plants, 2017, pp. 32–33 (spark ignition ≈ 1 %) · GLOBAL |
CAPEX: mühendislik maliyet tahminleri 34
CAPEX — ekipman, inşaat, bağlantılar ve devreye alma için gereken ilk yatırım.
| Parametre | Değer | Tür | Güven | Kaynak | Tarih |
|---|---|---|---|---|---|
Digester tank incl. insulation, mixers, heating, membrane roof, at 1 000 m³ eng.capex.digester_eur_m3_1000 Scales as V^-0.2; replace with 3–5 current supplier quotations | 190 EUR/m³ working | ESTIMATE | LOW | German component data 2012 (≈ 83–160 €/m³) × Destatis construction index 2012→2025 (×1.82) = 150–290 €/m³; checked against DBFZ 2023 reference plants · GLOBAL | |
Digester unit-cost scale exponent eng.capex.digester_scale_exp | -0,2 — | ASSUMPTION | LOW | Engineering judgement, no published value: concrete tanks cost ∝ V^0.8 · GLOBAL | |
Covered anaerobic lagoon (liner, HDPE gas-tight cover, gas collection) eng.capex.lagoon_eur_m3 | 30 EUR/m³ | ESTIMATE | LOW | CDFA dairy digester programme via Energy Institute at Haas, 2024: ≈ $950 per cow (≈ $32/m³) · GLOBAL | |
High-rate reactor (UASB/EGSB) incl. equalisation eng.capex.high_rate_eur_m3 | 650 EUR/m³ working | ESTIMATE | LOW | Engineering judgement, no published value: industrial UASB/EGSB; vendor quotes needed, proxies range up to ≈ 2× · GLOBAL | |
Gas-tight cover on an existing lagoon/tank eng.capex.cover_existing_eur_m3 | 30 EUR/m³ | ESTIMATE | LOW | top agrar 2012 (manufacturer data): gas-tight roof > 50 % of a 65–110 €/m³ tank, i.e. ≥ 33 €/m³ · GLOBAL | |
New gas-tight covered digestate storage eng.capex.storage_new_eur_m3 | 120 EUR/m³ | ESTIMATE | LOW | top agrar 2012: 65–110 €/m³ for 1 500–5 000 m³ gas-tight tanks × Destatis construction index to 2025 (×1.82); lower end · GLOBAL | |
Open storage cost relative to gas-tight storage eng.capex.storage_open_share | 0,5 — | ESTIMATE | LOW | top agrar 2012 (manufacturer data): the gas-tight roof is > 50 % of the tank cost · GLOBAL | |
CHP unit incl. installation at 100 kWel eng.capex.chp_eur_kw_100 | 2.400 EUR/kWel | ESTIMATE | LOW | DBFZ/IEE for BMWK 2024: biogas CHP cost +31–40 % 2020→2023 (BHKW-Infozentrum); LWK NRW 2023: ≈ 2 830 €/kW at 30 kW · GLOBAL | |
CHP unit-cost scale exponent eng.capex.chp_scale_exp | -0,25 — | ASSUMPTION | LOW | Danish Energy Agency, Technology Data, sheet 06 biogas engines (EUR2020); fits 30 kW–1 MW costs · GLOBAL | |
Gas holder, flare, desulphurisation: fixed part eng.capex.gas_system_fixed | 30.000 EUR | ESTIMATE | LOW | US EPA LMOP, LFGcost-Web v3.4 manual, 2020: flare system fixed part ≈ $26 000 · GLOBAL | |
Gas system variable part eng.capex.gas_system_per_nm3h | 120 EUR per Nm³/h raw biogas | ESTIMATE | LOW | US EPA LMOP, LFGcost-Web v3.4 manual, 2020: flare system ≈ $200 per Nm³/h (landfill); biogas flares cheaper · GLOBAL | |
Bunker silo (clamp) for ensiled energy crops, construction only eng.capex.silage_clamp_eur_m3 | 60 EUR/m³ | ESTIMATE | LOW | LfL Bayern via top agrar: clamp built for 47 €/m³ gross in 2015/16 → ≈ 40 € net × ≈ 1.5 construction-price rise to 2025 ≈ 60 €/m³; upper check: Landratsamt Schweinfurt building-fee reference values 2026, Fahrsilo 94–142 €/m³ incl. VAT and planning (≈ 70–105 € without). Engineering and contingency are added by the model. Supplier quote needed · GLOBAL | |
Slurry pit, pumps, pipework eng.capex.feed_slurry | 25.000 EUR | ESTIMATE | LOW | LWK NRW, Mini-Biogasanlagen (FNR event), 2023: pumps & mixers 50 k€ for 30 kW incl. digester mixers · GLOBAL | |
Solids feeder / hopper eng.capex.feed_solids | 70.000 EUR | ESTIMATE | LOW | Engineering judgement, no published value: supplier quotes needed · GLOBAL | |
Waste reception, crushing, buffer tank eng.capex.reception_waste | 60.000 EUR | ESTIMATE | LOW | Engineering judgement, no published value: supplier quotes needed · GLOBAL | |
Depackaging / sorting line and enclosed reception for contaminated waste eng.capex.pretreatment_eur_per_tpa | 45 EUR per t/a | ESTIMATE | LOW | Engineering judgement, no published value: biowaste / food-waste reception halls; supplier quotes needed · GLOBAL | |
Pasteurisation (70 °C / 1 h) unit, fixed eng.capex.pasteurisation_fixed | 70.000 EUR | ESTIMATE | LOW | Engineering judgement, no published value: EU 142/2011 Cat. 3 unit; supplier quotes needed · GLOBAL | |
Pasteurisation unit, variable eng.capex.pasteurisation_per_tday | 1.800 EUR per t/d | ESTIMATE | LOW | Engineering judgement, no published value: supplier quotes needed · GLOBAL | |
Heat exchangers / pipes to consumer, fixed eng.capex.heat_network_fixed | 25.000 EUR | ESTIMATE | LOW | Engineering judgement, no published value: depends on pipe length; local quote needed · GLOBAL | |
Heat network variable eng.capex.heat_network_per_kw | 100 EUR/kWth | ESTIMATE | LOW | Engineering judgement, no published value: depends on pipe length; local quote needed · GLOBAL | |
Biogas boiler incl. installation eng.capex.boiler_eur_kw | 90 EUR/kWth | ESTIMATE | LOW | Danish Energy Agency, Technology Data, sheet 44 gas boilers: 64 €/kWth (EUR2020, 2–3 MW) × 1.3 · GLOBAL | |
Electrical, I&C, SCADA eng.capex.electrical_share | 0,06 of equipment | ESTIMATE | LOW | LWK NRW, Mini-Biogasanlagen (FNR event), 2023: ≈ 8.5 % for a 30 kW plant · GLOBAL | |
Gas/substrate piping eng.capex.piping_share | 0,04 of equipment | ESTIMATE | LOW | Engineering judgement, no published value: share of equipment cost · GLOBAL | |
Civil works, roads, fencing eng.capex.civil_share | 0,06 of equipment | ESTIMATE | LOW | LWK NRW, Mini-Biogasanlagen (FNR event), 2023: earthworks ≈ 10 % for a 30 kW plant · GLOBAL | |
Engineering, permits, EIA, commissioning eng.capex.engineering_share | 0,08 of subtotal | ESTIMATE | MEDIUM | DBFZ/IEE for BMWK, Kostenentwicklung Biomasseanlagen, 2024, Tab. 4-1: planning 8 % · GLOBAL | |
Contingency eng.capex.contingency_share | 0,1 of subtotal | ASSUMPTION | MEDIUM | Engineering judgement, no published value: typical for pre-FEED estimates; AACE Class 5 accuracy −20…−50 % / +30…+100 % · GLOBAL | |
Electrical grid connection (behind the meter / small export) eng.capex.grid_connection_fixed | 20.000 EUR | ESTIMATE | LOW | Engineering judgement, no published value: grid operator quote needed · GLOBAL | |
Grid connection variable eng.capex.grid_connection_per_kw | 60 EUR/kWel | ESTIMATE | LOW | Engineering judgement, no published value: grid operator quote needed · GLOBAL | |
Membrane upgrading unit at 250 Nm³/h raw biogas (incl. compression and off-gas treatment) eng.capex.upgrade_ref_eur | 1.200.000 EUR | ESTIMATE | MEDIUM | IBKE, Leitfaden Rohbiogas-Sammelleitungen, 2024, Tab. 4: 1.2 M€ at 250 Nm³/h, 2.0 M€ at 750 Nm³/h, incl. off-gas treatment · GLOBAL | |
Upgrading scale exponent eng.capex.upgrade_scale_exp | 0,65 — | ASSUMPTION | MEDIUM | Danish Energy Agency, Renewable Fuels, sheet 91 upgrading (EUR2020); IBKE 2024 ≈ 0.5–0.6 · GLOBAL | |
Compression, metering, injection station eng.capex.injection_fixed | 350.000 EUR | ESTIMATE | LOW | GRDF connection presentation, 2018: ≈ 0.4–0.5 M€ equivalent; distribution grid only (transmission ≈ 2 M€) · GLOBAL | |
Bio-CNG off-grid offtake: filling post + 3–4 cascade trailers (≈ 4 000–5 000 Nm³ each) eng.capex.cng_fixed | 450.000 EUR | ESTIMATE | LOW | Engineering judgement, no published value: virtual-pipeline practice; US EPA LFGcost 2020 CNG station gives the same order · GLOBAL | |
Bio-CNG high-pressure (250 bar) compression eng.capex.cng_per_nm3h | 1.000 EUR per Nm³/h biomethane | ESTIMATE | LOW | Engineering judgement, no published value: reciprocating CNG compressors 100–1 000 Nm³/h; supplier quotes needed · GLOBAL | |
Pipeline to gas main eng.capex.pipeline_eur_km | 200.000 EUR/km | ESTIMATE | MEDIUM | IBKE, Leitfaden Rohbiogas-Sammelleitungen, 2024: PE lines 80–300 €/m · GLOBAL |
OPEX 14
OPEX — hammadde, nakliye, enerji, personel ve bakım için düzenli işletme giderleri.
| Parametre | Değer | Tür | Güven | Kaynak | Tarih |
|---|---|---|---|---|---|
Minimum operator time eng.opex.labour_min_hours | 750 h/a | ASSUMPTION | LOW | IEE/DBFZ, EEG-Erfahrungsbericht Biomasse, 2023, Tab. 5-4: 75 kW slurry plant ≈ 500–750 h/a · GLOBAL | |
Operator time at 1 kWel, power-law fit h = a·kWel^b eng.opex.labour_hours_coef Maize-silage farm plants 18–1 000 kWel; above 1 MW and for waste plants with reception and pasteurisation the fit is an extrapolation (≈ 3.3 h/kW at 1 MW, 2.1 at 5 MW; IBKE 2024 example ≈ 2.6) | 22,5 h/a | ESTIMATE | MEDIUM | Walla & Schneeberger, Biomass and Bioenergy 32 (2008) 551–557, Table 2 (labour from Keymer & Reinhold; 20 €/h): 12 390 / 23 275 / 39 550 €/a at 100 / 250 / 500 kWel = 620 / 1 164 / 1 978 h/a; fit a = 22.5, b = 0.72 reproduces all three within 2 % · GLOBAL | |
Operator time scale exponent b eng.opex.labour_hours_exp | 0,72 — | ESTIMATE | MEDIUM | Fit to Walla & Schneeberger (2008) Table 2: labour grows less than proportionally with size · GLOBAL | |
CHP full-maintenance contract at 100 kWel (oil, spares, overhaul) eng.opex.chp_service_eur_kwh | 0,026 EUR/kWhel | ESTIMATE | LOW | ASUE BHKW-Kenndaten 2011 (biogas full maintenance) escalated by BHKW-Infozentrum data to 2023 (DBFZ/IEE 2024) · GLOBAL | |
CHP service cost scale exponent eng.opex.chp_service_scale_exp | -0,32 — | ESTIMATE | LOW | Fit of 2.6 ct at 100 kW (ASUE 2011, escalated) to ≈ 1.0 ct at 1–10 MW (Danish Energy Agency, sheet 06, 2023) · GLOBAL | |
Maintenance of non-CHP plant eng.opex.maintenance_share | 0,02 of CAPEX/a | ESTIMATE | MEDIUM | IEE/DBFZ, EEG-Erfahrungsbericht Biomasse, 2023, §5.4: 2 % of initial investment · GLOBAL | |
Insurance eng.opex.insurance_share | 0,005 of CAPEX/a | ESTIMATE | MEDIUM | IBKE, Leitfaden Rohbiogas-Sammelleitungen, 2024, Tab. 5: 0.5 % of investment · GLOBAL | |
Lab tests, safety inspections, gas monitoring eng.opex.monitoring_fixed | 5.000 EUR/a | ESTIMATE | LOW | Engineering judgement, no published value: lab analyses and inspections · GLOBAL | |
Upgrading maintenance eng.opex.upgrade_maintenance_share | 0,04 of upgrading CAPEX/a | ESTIMATE | MEDIUM | Danish Energy Agency, Renewable Fuels, sheet 91 (≈ 4.8 %); IBKE 2024 full maintenance ≈ 3.3 % · GLOBAL | |
Bio-CNG road haulage to the offtaker (30–60 km) eng.opex.cng_haul_eur_nm3 | 0,04 EUR/Nm³ | ESTIMATE | LOW | Engineering judgement, no published value: ≈ 4 500 Nm³ per trailer trip at 150–200 €; haulier quotes needed · GLOBAL | |
Pre-treatment rejects, packaged food waste eng.opex.reject_share_food_waste | 0,1 of input mass | ESTIMATE | MEDIUM | Huber UK via ADBA, 2025: depackaging rejects 7–12 % of food waste · GLOBAL | |
Pre-treatment rejects, municipal biowaste eng.opex.reject_share_biowaste | 0,2 of input mass | ESTIMATE | MEDIUM | Alia / Comune di Prato, 2021: impurities 8–16 %, rejects ≈ 2×; DBFZ 2023 assumes 5 % in Germany · GLOBAL | |
Disposal of pre-treatment rejects (incineration / landfill) eng.opex.reject_disposal_eur_t | 100 EUR/t | ESTIMATE | MEDIUM | IEE/DBFZ, EEG-Erfahrungsbericht Biomasse, 2023, Tab. 5-6: incineration 100 €/t (DE); use local gate fee · GLOBAL | |
Certification, trading, balancing for biomethane eng.opex.certification_eur_nm3 | 0,03 EUR/Nm³ | ESTIMATE | LOW | IBKE, Leitfaden Rohbiogas-Sammelleitungen, 2024, Tab. 5: ≈ 0.01–0.02 €/Nm³ + trading fees · GLOBAL |
Piyasa ve finans parametreleri 31
Seçilen piyasa için referans değerler. Proje değerleri, tüketime ve girdiğiniz fiyatlara göre değişebilir. Her parametre için kaynak ve güven düzeyi belirtilir.
Brezilya
Seçilen piyasa için referans değerler. Proje değerleri, tüketime ve girdiğiniz fiyatlara göre değişebilir. Her parametre için kaynak ve güven düzeyi belirtilir.
| Parametre | Değer | Tür | Güven | Kaynak | Tarih |
|---|---|---|---|---|---|
Exchange rate econ.fx_local_per_eur | 6,1748 BRL/EUR | FACT | HIGH | Official EUR reference rate, 2026-11-09 · BR | |
Business electricity reference, excl. VAT (default if the customer gives none) econ.electricity_retail_eur_kwh MME/ANEEL billed industrial electricity, national and macro-regional averages; regulated supply, not a free-market PPA. Macro-regions do not resolve state/network tariffs. | 0,13615988 EUR/kWh | CALCULATION | MEDIUM | MME/ANEEL billed industrial electricity, national and macro-regional averages; regulated supply, not a free-market PPA. Macro-regions do not resolve state/network tariffs. MME Informativo Tarifario, 1st semester 2026, table 7, p.38; local R$/MWh divided by 1000 and BRL/EUR. Converted at 6.1748 BRL/EUR (2026-11-09). · BR | |
Wholesale electricity price (market average) econ.electricity_spot_eur_kwh Official day-ahead or wholesale average where published | 0,03690322 EUR/kWh | CALCULATION | MEDIUM | CCEE PLD monthly mean, Sudeste/Centro-Oeste, Oct 2025 – Sep 2026: 227.9 BRL/MWh; converted at 6.1748 BRL/EUR (2026-11-09) · BR | |
Share of the wholesale price realised for surplus power econ.export_haircut | 0,85 — | ASSUMPTION | MEDIUM | 15 % profile & balancing discount for a small seller (assumption, same for all markets) · BR | |
Share of the bill actually avoided by self-generation econ.self_consumption_variable_share | 0,85 — | ASSUMPTION | MEDIUM | TOU reference: energy/Ft portion only, demand/service charges retained. Else 85% engineering allowance. User invoice uses the generic allowance until its energy/demand split is known. · BR | |
Value of useful heat (displaced gas / boiler efficiency) econ.heat_value_eur_kwh_th | 0,05652545 EUR/kWh th | CALCULATION | MEDIUM | Business gas 50.872902766081495 €/MWh LHV ÷ 0.9 · BR | |
Business natural-gas price, excl. VAT, LHV basis econ.gas_price_eur_mwh | 50,87290277 EUR/MWh LHV | CALCULATION | MEDIUM | Gasmig industrial tariff R$ 3.089/m³ (Minas Gerais, 2025 revision) at 10.9 kWh/m³ (GCV) = 283 R$/MWh; CNI: industrial gas ≈ US$ 20/MMBtu incl. taxes (2025) — state tariffs differ; converted at 6.1748 BRL/EUR (2026-11-09); HHV × 1.11 → LHV · BR | |
Biomethane price without support, conservative econ.biomethane_price_cons_eur_nm3 | 0,35 EUR/Nm³ | CALCULATION | LOW | National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits; conservative scenario reference 0.35 EUR/Nm³ · BR | |
Biomethane price without support, base econ.biomethane_price_base_eur_nm3 | 0,45 EUR/Nm³ | CALCULATION | LOW | National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits · BR | |
Biomethane price without support, optimistic econ.biomethane_price_opt_eur_nm3 | 0,6 EUR/Nm³ | CALCULATION | LOW | National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits; optimistic scenario reference 0.6 EUR/Nm³ · BR | |
Official hourly labour cost, economy-wide (wages + employer costs) econ.labour_official_eur_h | 5,61968159 EUR/h | CALCULATION | MEDIUM | IBGE PNAD Contínua (SIDRA 5436), 2Q2026: average habitual income, all jobs, R$ 3 738/month × 13.33 × 1.358 employer costs ÷ 1 950 h; converted at 6.1748 BRL/EUR (2026-11-09) · BR | |
Plant operator wage relative to the economy-wide average econ.operator_wage_ratio | 1 — | ASSUMPTION | MEDIUM | Plant operator ≈ economy-wide average (middle-income economy; no premium) · BR | |
Road transport of organic feedstock econ.transport_eur_tkm | 0,077 EUR/(t·km) | CALCULATION | MEDIUM | 0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany · BR | |
Loading/unloading per tonne econ.transport_fixed_eur_t | 0,71 EUR/t | CALCULATION | MEDIUM | 0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost) · BR | |
Local CAPEX relative to the German baseline econ.capex_factor Equipment (CHP, upgrading, membranes, pumps) is internationally priced; civil works follow local costs | 0,95 — | CALCULATION | LOW | chp only. BNDES-financed 2.15 MW biogas plant, Elias Fausto (SP): R$ 56.2 M ≈ 4 150 €/kW — at German level despite low labour cost (import duties on engines, upgrading and membranes); single project · BR | |
chp: local CAPEX factor econ.capex_factor_chp Route-specific factor; reconstructed project costs are not independently validated quotations | 0,95 — | CALCULATION | LOW | chp only. BNDES-financed 2.15 MW biogas plant, Elias Fausto (SP): R$ 56.2 M ≈ 4 150 €/kW — at German level despite low labour cost (import duties on engines, upgrading and membranes); single project · BR | |
boiler: local CAPEX factor econ.capex_factor_boiler Route-specific factor; reconstructed project costs are not independently validated quotations | 0,78 — | CALCULATION | LOW | 0.72 traded equipment + 0.28 × local/German labour cost (5.6/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed · BR | |
biomethane: local CAPEX factor econ.capex_factor_biomethane Route-specific factor; reconstructed project costs are not independently validated quotations | 0,78 — | CALCULATION | LOW | 0.72 traded equipment + 0.28 × local/German labour cost (5.6/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed · BR | |
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk) econ.discount_rate | 0,079 — | CALCULATION | MEDIUM | Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 3.10 % (Ba1; Damodaran, 2026-07); not a bank offer · BR | |
Annual escalation of energy prices (nominal EUR) econ.energy_escalation | 0,02 — | ASSUMPTION | MEDIUM | At the ECB/Fed inflation target — no real energy-price growth assumed (conservative) · BR | |
Annual escalation of operating costs (nominal EUR) econ.opex_escalation | 0,025 — | ASSUMPTION | MEDIUM | Inflation target + 0.5 pp wage drift · BR | |
Evaluation horizon econ.horizon_years | 15 a | ASSUMPTION | MEDIUM | Shorter than the 20-year technical life — conservative · BR | |
Debt share for DSCR test econ.debt_share | 0,5 — | ASSUMPTION | MEDIUM | Typical agri / project lending (KfW, EBRD, IFC practice) · BR | |
Debt interest rate (EUR-equivalent) econ.debt_interest | 0,064 — | CALCULATION | MEDIUM | Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this · BR | |
Debt tenor econ.debt_tenor_years | 7 a | ASSUMPTION | MEDIUM | Typical · BR | |
Mineral nitrogen price econ.fert_n_eur_kg | 1,33013063 EUR/kg N | CALCULATION | MEDIUM | World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup · BR | |
Mineral phosphorus price econ.fert_p2o5_eur_kg | 1,67754303 EUR/kg P₂O₅ | CALCULATION | MEDIUM | World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup · BR | |
Mineral potassium price econ.fert_k2o_eur_kg | 0,76105602 EUR/kg K₂O | CALCULATION | MEDIUM | World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup · BR | |
Incremental digestate handling on adequate land econ.digestate_handling_eur_t | 1,65 EUR/t | CALCULATION | MEDIUM | Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³) · BR | |
Digestate that has no adequate land econ.digestate_excess_eur_t | 3,73 EUR/t | CALCULATION | MEDIUM | Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t) · BR | |
Grid emission factor econ.grid_ef_t_mwh | 0,11 tCO₂/MWh | FACT | HIGH | Ember via Our World in Data, carbon intensity of electricity generation (lifecycle-free, gCO2/kWh), 2025 · BR |
Senaryolar 36
Senaryolar: temkinli, baz ve iyimser durumlar, sekiz stres testi ve her destek programı için ayrı hesaplama.
| Parametre | Değer | Tür | Güven | Kaynak | Tarih |
|---|---|---|---|---|---|
Conservative: yieldBlend scn.conservative.yieldBlend | -0,5 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: processRealisation scn.conservative.processRealisation | 0,95 — | ASSUMPTION | MEDIUM | Catalogue yields are KTBL/FNR standard yields, already full-scale values (base 1.0, conservative 0.95). Checked 2026-11-03: FNR Biogas-Messprogramm III, 39 German plants, model ÷ measured methane median 0.87; Swedish farm plants (SCB 2024) 0.86; EPA AgSTAR 79 US digesters median ≈ 1.04 · GLOBAL | |
Conservative: capexMult scn.conservative.capexMult | 1,2 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: opexMult scn.conservative.opexMult | 1,15 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: energyPriceMult scn.conservative.energyPriceMult | 0,85 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: heatUtilisation scn.conservative.heatUtilisation | 0,6 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: chpHours scn.conservative.chpHours | 7.200 h/a × eng.plant_availability ÷ 0.89 | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: leakShare scn.conservative.leakShare | 0,03 of CH₄ production | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: digestateValueFactor scn.conservative.digestateValueFactor | 0,5 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: disposalRealisation scn.conservative.disposalRealisation | 0,8 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: feedstockAvailability scn.conservative.feedstockAvailability | 0,9 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: ensilingLoss scn.conservative.ensilingLoss | 0,12 of DM | ASSUMPTION | MEDIUM | KTBL, Ernte- und Silomanagement, 2021, Tab. 1: bunker silo DM loss 8 % unavoidable (Köhler et al. 2013), 9.3 % with average and 12 % with poor compaction · GLOBAL | |
Base: yieldBlend scn.base.yieldBlend | 0 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: processRealisation scn.base.processRealisation | 1 — | ASSUMPTION | MEDIUM | Catalogue yields are KTBL/FNR standard yields, already full-scale values (base 1.0, conservative 0.95). Checked 2026-11-03: FNR Biogas-Messprogramm III, 39 German plants, model ÷ measured methane median 0.87; Swedish farm plants (SCB 2024) 0.86; EPA AgSTAR 79 US digesters median ≈ 1.04 · GLOBAL | |
Base: capexMult scn.base.capexMult | 1 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: opexMult scn.base.opexMult | 1 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: energyPriceMult scn.base.energyPriceMult | 1 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: heatUtilisation scn.base.heatUtilisation | 0,8 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: chpHours scn.base.chpHours | 7.800 h/a × eng.plant_availability ÷ 0.89 | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: leakShare scn.base.leakShare | 0,015 of CH₄ production | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: digestateValueFactor scn.base.digestateValueFactor | 0,7 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: disposalRealisation scn.base.disposalRealisation | 0,95 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: feedstockAvailability scn.base.feedstockAvailability | 1 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: ensilingLoss scn.base.ensilingLoss | 0,093 of DM | ASSUMPTION | MEDIUM | KTBL, Ernte- und Silomanagement, 2021, Tab. 1: bunker silo DM loss 8 % unavoidable (Köhler et al. 2013), 9.3 % with average and 12 % with poor compaction · GLOBAL | |
Optimistic: yieldBlend scn.optimistic.yieldBlend | 0,5 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: processRealisation scn.optimistic.processRealisation | 1 — | ASSUMPTION | MEDIUM | Catalogue yields are KTBL/FNR standard yields, already full-scale values (base 1.0, conservative 0.95). Checked 2026-11-03: FNR Biogas-Messprogramm III, 39 German plants, model ÷ measured methane median 0.87; Swedish farm plants (SCB 2024) 0.86; EPA AgSTAR 79 US digesters median ≈ 1.04 · GLOBAL | |
Optimistic: capexMult scn.optimistic.capexMult | 0,9 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: opexMult scn.optimistic.opexMult | 0,95 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: energyPriceMult scn.optimistic.energyPriceMult | 1,1 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: heatUtilisation scn.optimistic.heatUtilisation | 0,95 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: chpHours scn.optimistic.chpHours | 8.200 h/a × eng.plant_availability ÷ 0.89 | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: leakShare scn.optimistic.leakShare | 0,005 of CH₄ production | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: digestateValueFactor scn.optimistic.digestateValueFactor | 0,85 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: disposalRealisation scn.optimistic.disposalRealisation | 1 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: feedstockAvailability scn.optimistic.feedstockAvailability | 1 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: ensilingLoss scn.optimistic.ensilingLoss | 0,08 of DM | ASSUMPTION | MEDIUM | KTBL, Ernte- und Silomanagement, 2021, Tab. 1: bunker silo DM loss 8 % unavoidable (Köhler et al. 2013), 9.3 % with average and 12 % with poor compaction · GLOBAL |