- Biomethane price without support, base: 0.65 EUR/Nm³ · CALCULATED_VALUE · LOW
- National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- boiler: local CAPEX factor: 0.99 — · CALCULATED_VALUE · MEDIUM
- 0.72 traded equipment + 0.28 × local/German labour cost (30.2/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Debt interest rate (EUR-equivalent): 0.045 — · CALCULATED_VALUE · MEDIUM
- Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
- Typical agri / project lending (KfW, EBRD, IFC practice)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
- Typical
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.06 — · CALCULATED_VALUE · MEDIUM
- Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.00 % (Aaa; Damodaran, 2026-07); not a bank offer
- 2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Business electricity reference, excl. VAT (default if the customer gives none): 0.1056 EUR/kWh · MARKET_DATA · HIGH
- Eurostat nrg_pc_205, non-household, MWH2000-19999, excl. VAT, 2026-S1
- 2026-S1 · checked 2026-10-31 · Consumer band MWH2000-19999; 3000 MWh/year customer load; existing-site load, new plant auxiliary load may change the applicable band
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Wholesale electricity price (market average): 0.08248 EUR/kWh · MARKET_DATA · HIGH
- ENTSO-E day-ahead (via Energy-Charts), zone SE4, average 82.5 €/MWh, 2025-10-01 – 2026-10-01
- 2025-10-01 / 2026-10-01 · checked 2026-10-30 · Wholesale bidding zone SE4; not a guaranteed export PPA
- WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
- Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
- At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
- 15 % profile & balancing discount for a small seller (assumption, same for all markets)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Exchange rate: 11 SEK/EUR · MARKET_DATA · HIGH
- Official EUR reference rate, 2026-11-09
- 2026-11-09 · checked 2026-11-10 · SEK per EUR; dated reference, not a guaranteed transaction rate
- WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
- Value of useful heat (displaced gas / boiler efficiency): 0.1379 EUR/kWh th · CALCULATED_VALUE · MEDIUM
- Business gas 124.09800000000001 €/MWh LHV ÷ 0.9
- 2026-S1 · checked 2026-10-31 · GJ10000-99999; reference band, customer gas use unknown
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
- Shorter than the 20-year technical life — conservative
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Official hourly labour cost, economy-wide (wages + employer costs): 43.1 EUR/h · MARKET_DATA · HIGH
- Eurostat lc_lci_lev: hourly labour cost (wages + employer costs), industry, construction & services, 2025
- WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
- Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
- Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
- Inflation target + 0.5 pp wage drift
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Share of the bill actually avoided by self-generation: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
- TOU reference: energy/Ft portion only, demand/service charges retained. Else 85% engineering allowance. User invoice uses the generic allowance until its energy/demand split is known.
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity