- Biomethane price without support, base: 0.6 EUR/Nm³ · CALCULATED_VALUE · LOW
- National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- chp: local CAPEX factor: 0.93 — · CALCULATED_VALUE · MEDIUM
- 0.72 traded equipment + 0.28 × local/German labour cost (23.5/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Debt interest rate (EUR-equivalent): 0.049 — · CALCULATED_VALUE · MEDIUM
- Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Debt share for DSCR test: 0.65 — · ENGINEERING_ASSUMPTION · MEDIUM
- Typical agri / project lending (KfW, EBRD, IFC practice)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
- Typical
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Digestate that has no adequate land: 7.67 EUR/t · CALCULATED_VALUE · MEDIUM
- Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t)
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Incremental digestate handling on adequate land: 3.08 EUR/t · CALCULATED_VALUE · MEDIUM
- Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³)
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0.064 — · CALCULATED_VALUE · MEDIUM
- Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.74 % (Aa3; Damodaran, 2026-07); not a bank offer
- 2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Wholesale electricity price (market average): 0.1026 EUR/kWh · CALCULATED_VALUE · MEDIUM
- Ofgem wholesale market indicators: GB day-ahead baseload, monthly average weighted by volume (broker data), Jul 2025 – Jun 2026 mean £85.63/MWh; converted at 0.8343 GBP/EUR (2026-11-09)
- 2026-06-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
- REVIEW_REQUIRED: Observation is 132 days old; exceeds the 60-day review policy
- Documented nominal reference (may include estimated adders): 0.08563 GBP (ENGINEERING_ASSUMPTION); FX (2026-11-09): 0.8343 GBP/EUR (MARKET_DATA)
- Annual escalation of energy prices (nominal EUR): 0.02 — · ENGINEERING_ASSUMPTION · MEDIUM
- At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Share of the wholesale price realised for surplus power: 0.85 — · ENGINEERING_ASSUMPTION · MEDIUM
- 15 % profile & balancing discount for a small seller (assumption, same for all markets)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Mineral potassium price: 0.7611 EUR/kg K₂O · CALCULATED_VALUE · MEDIUM
- World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
- 2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Trailing-year commodity reference: 378.6 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 367.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
- Mineral nitrogen price: 1.33 EUR/kg N · CALCULATED_VALUE · MEDIUM
- World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
- 2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Trailing-year commodity reference: 507.3 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 407.5 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
- Mineral phosphorus price: 1.678 EUR/kg P₂O₅ · CALCULATED_VALUE · MEDIUM
- World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup
- 2025M10 / 2026M09 · checked 2026-10-27 · World commodity reference; actual digestate nutrient substitution and local fertiliser price require confirmation
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Trailing-year commodity reference: 639.8 USD/t product (MARKET_DATA); Latest-month reference (2026-09): 690 USD/t product (MARKET_DATA); FX (2026-11-09): 1.119 USD/EUR (MARKET_DATA); Farm-gate markup: 1.35 — (ENGINEERING_ASSUMPTION)
- Exchange rate: 0.8343 GBP/EUR · MARKET_DATA · HIGH
- Official EUR reference rate, 2026-11-09
- 2026-11-09 · checked 2026-11-10 · GBP per EUR; dated reference, not a guaranteed transaction rate
- WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
- Value of useful heat (displaced gas / boiler efficiency): 0.05957 EUR/kWh th · CALCULATED_VALUE · MEDIUM
- Business gas 53.61740381157857 €/MWh LHV ÷ 0.9
- 2026-06-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Documented nominal reference (may include estimated adders): 40.3 GBP (ENGINEERING_ASSUMPTION); FX (2026-11-09): 0.8343 GBP/EUR (MARKET_DATA)
- Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
- Shorter than the 20-year technical life — conservative
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Official hourly labour cost, economy-wide (wages + employer costs): 33.56 EUR/h · CALCULATED_VALUE · MEDIUM
- ONS ASHE 2026 (provisional, Apr 2026): full-time median hourly pay £20.81 × 1.17 mean/median × 1.15 employer NI (15 %) and pension ≈ £28.0/h; converted at 0.8343 GBP/EUR (2026-11-09)
- 2026-04-30 · checked undated · Historical national/regional reference; latest publication and customer applicability require verification
- WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
- Documented nominal reference (may include estimated adders): 28 GBP (ENGINEERING_ASSUMPTION); FX (2026-11-09): 0.8343 GBP/EUR (MARKET_DATA)
- Plant operator wage relative to the economy-wide average: 0.7 — · ENGINEERING_ASSUMPTION · MEDIUM
- Plant operator ≈ 70 % of the economy-wide average hourly cost (high-income economy)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Annual escalation of operating costs (nominal EUR): 0.025 — · ENGINEERING_ASSUMPTION · MEDIUM
- Inflation target + 0.5 pp wage drift
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Road transport of organic feedstock: 0.131 EUR/(t·km) · CALCULATED_VALUE · MEDIUM
- 0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Loading/unloading per tonne: 1.07 EUR/t · CALCULATED_VALUE · MEDIUM
- 0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost)
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Avoidable share of an unsplit customer electricity bill: 0.85 — · ENGINEERING_ASSUMPTION · LOW
- Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Customer electricity price (invoice split not verified): 0.2937 EUR/kWh · USER_INPUT · MEDIUM
- USER_INPUT 0.245 GBP/kWh / FX 0.8343; Official EUR reference rate, 2026-11-09. Invoice date not supplied; energy/demand split assumed separately.
- REVIEW_REQUIRED: Customer input; invoice date, contract and validity not independently verified
- food_waste: dry matter: 24 % FM · MEASURED · MEDIUM
- MEASURED laboratory report; replaces the catalogue value for this stream. Not independently verified.
- REVIEW_REQUIRED: Customer measurement; sample, date and laboratory not independently verified