Metodologija
Metodologija i registar pretpostavki
Lanac proračuna
Sirovine: broj grla pretvaramo u količinu koja se može prikupiti, suvu materiju, organsku materiju i prinos metana, uz mesečnu sezonalnost. Otpad se unosi po količini; otpadne vode, deponije i postojeći biogas ulaze kao tokovi gasa.
Manure yield × collectable share → tonnes → dry matter → volatile solids → methane (L CH₄/kg VS).
Izvor IPCC 2019 Refinement, Vol. 4 Ch. 10 (manure per head; North America: ASAE D384.2) · KTBL / FNR standard methane yields · laboratory BMP in L CH₄/kg VS at 0 °C, 101.325 kPa (VDI 4630; spread between laboratories: Hafner et al. 2020) · EPA LMOP first-order decay (landfill) · IPCC 2019, Vol. 5 Ch. 6 COD balance (wastewater)
Fermentor: vreme zadržavanja i organsko opterećenje određuju zapreminu. Suva materija i klima određuju tehnologiju; potrebu za toplotom računamo mesečno.
Volume = max(retention time, organic loading). CSTR / solids feeding / dry digestion / high-rate reactor / unheated covered lagoon (warm climates).
Izvor FNR Guide to Biogas (2010), Table 8.4: retention time and organic loading · TA Luft 2021 / VDI 3475-4: gas-tight storage · ERA5 monthly climate of the site
Energija: kogeneracija, kotao ili biometan. Prvo grejanje fermentora, zatim usklađivanje preostale toplote sa stvarnom potražnjom.
Monthly energy balance: CHP / boiler / biomethane; digester heat first.
Izvor ISO 6976:2016 (heating value of methane) · manufacturers' CHP data sheets · DBFZ 2023 (plant electricity use) · SGC 2013:270 (methane slip in upgrading)
Ekonomika: CAPEX prilagođen zemlji, OPEX, prihodi i uštede. NPV, IRR i DSCR za 15 godina uz diskontnu stopu zemlje.
Component CAPEX × country factor; OPEX; own use / export / heat / disposal / digestate. Pre-tax, nominal EUR, 15 years: NPV, IRR, simple and discounted payback, DSCR = EBITDA ÷ debt annuity. Not a bankable model (no tax, depreciation, working capital).
Izvor DBFZ / IEE 2023 German reference plants (CAPEX anchors) · AACE Class 5 estimate · Eurostat, national regulators, EIA (prices) · Damodaran country-risk premium (discount rate)
Scenariji: konzervativni, osnovni i optimistični, osam stres testova i zaseban proračun za svaki program podrške.
Izvor Triangular distributions sampled by Latin hypercube, 160 draws, fixed seed · expected value of perfect information (EVPI) · Directive (EU) 2018/2001 (RED II), Annex VI default values (climate case)
Ocena: povraćaj ulaganja, NPV scenarija, DSCR i kvalitet podataka. Subvencije ne utiču na zaključak; ne odlučuje jedan zbirni rezultat.
Izvor EPA AgSTAR Project Development Handbook (2020), ch. 7: scope and accuracy of a pre-feasibility assessment
Šta model ne radi
- Prinos metana zasniva se na literaturi. Laboratorijska analiza vaših sirovina i dalje je potrebna.
- Prioritet imaju otpad i ostaci. Energetski usevi (npr. silaža kukuruza) mogu se uneti kao sirovina, ali se nikad ne dodaju automatski, a programi podrške često ograničavaju njihov udeo.
- Podrška je prikazana zasebno, sa statusom i izvorom, bez uticaja na zaključak.
- Nisu uključeni porezi, PDV, obrtni kapital ni valutni šokovi izvan rizika u diskontnoj stopi.
- Koristimo zvaničnu statistiku gde je dostupna. Nedostajuće podatke označavamo ESTIMATE i LOW. Vaše cene imaju prednost.
Eurostat · national regulators · EIA · World Bank · ERA5 climate · Damodaran country risk
- Ovo je preliminarna procena, a ne studija izvodljivosti. Projektovanje, bezbednost i ulaganje zahtevaju stručnu proveru.
Od preliminarne procene do izgradnje
Biogasni projekti se razvijaju u fazama. Svaka faza košta više i smanjuje neizvesnost, a završava se odlukom: nastaviti, preraditi koncept ili odustati. Methalytics pokriva prvu fazu.
- AACE klasa 5Vi ste ovde
1. Preliminarna procena
Da li projekat zaslužuje detaljniju analizu i šta prvo proveriti? Proračun se zasniva na vašim količinama i računima, tipičnim vrednostima sirovine, datiranim tržišnim cenama i troškovima uporedivih postrojenja.
Stvarni trošak može biti do 20–50% niži ili do 30–100% viši od procene
Nekoliko minuta
- AACE klasa 4
2. Provere pre studije
Da li se potvrđuju činjenice od kojih zavisi odgovor? Laboratorijska analiza prinosa metana (BMP), ponude dobavljača, uslovi priključenja od operatora elektroenergetske ili gasne mreže, pisma o namerama dobavljača sirovine i kupaca energije. Plaćeni izveštaj ređa ove provere za vaš projekat i priprema tekstove zahteva.
Stvarni trošak može biti do 15–30% niži ili do 20–50% viši od procene
Od nekoliko nedelja do dva meseca: samo BMP test traje oko mesec dana
- AACE klasa 3
3. Studija izvodljivosti
Može li postrojenje da se izgradi, dobije dozvole i finansira, i po kojoj ceni? Sirovina, tehnologija, maseni i energetski bilans, lokacija, dozvole i finansijski plan koji banka može da proceni.
Stvarni trošak može biti do 10–20% niži ili do 10–30% viši od procene
Nekoliko meseci; kod malih i srednjih projekata oko 1–3% investicije
- AACE klasa 2
4. Projektovanje, ugovori i izgradnja
Projekat za izvođenje, ugovor sa dobavljačem ili EPC izvođačem, dozvole i finansijsko zatvaranje, zatim izgradnja i puštanje u rad.
Stvarni trošak može biti do 5–15% niži ili do 5–20% viši od procene
Ugovorne cene zamenjuju procene
Preskočena faza znači postrojenje izgrađeno na neproverenim brojkama: EPA AgSTAR navodi loše planiranje kao glavni uzrok mnogih neuspelih biogasnih postrojenja, a UNIDO upozorava da je „studija izvodljivosti“ dobavljača opreme često samo tehnička studija, a ne nepristrasna procena.
Uslovi po zemljama 33
Pouzdanost: zeleno — HIGH, žuto — MEDIUM, crveno — LOW. Izaberite vrednost za prikaz izvora.
| Zemlja | Podaci | Struja€/kWh | Prodaja mreži€/kWh | Gas €/MWh LHV | Rad€/h | CAPEX× | Diskontna stopa | Biometan u mreži | Programi podrške |
|---|---|---|---|---|---|---|---|---|---|
| Argentina | okvirni | — | — | ||||||
| Austrija | zvanični | da | EAG Marktprämie Biogas (≤ 250 kW) (otvoren) | ||||||
| Brazil | zvanični | — | — | ||||||
| Bugarska | zvanični | — | — | ||||||
| Češka | zvanični | da | Aukce MPO – provozní podpora biometanu (aukcijski) | ||||||
| Danska | zvanični | da | — | ||||||
| Estonija | zvanični | da | — | ||||||
| Finska | zvanični | — | Maatalouden investointituki – biokaasulaitos (otvoren) | ||||||
| Francuska | zvanični | da | Obligation d'achat biométhane injecté (ističe) | ||||||
| Grčka | zvanični | — | — | ||||||
| Holandija | zvanični | da | SDE++ 2026 – monomestvergisting (groen gas) (aukcijski); SDE++ 2026 – monomestvergisting (WKK) (aukcijski) | ||||||
| Indija | zvanični | — | GOBARdhan administered CBG price (otvoren) | ||||||
| Italija | zvanični | da | DM FER 2 – biogas ≤ 300 kW (aukcijski); DM 15/9/2022 + PNRR (40 % grant) (zatvoren) | ||||||
| Kanada | zvanični | da | Utility RNG offtake (FortisBC, Énergir, Enbridge) (aukcijski) | ||||||
| Kazahstan | okvirni | — | — | ||||||
| Letonija | zvanični | da | ALTUM biometāna programma (zatvoren) | ||||||
| Litvanija | zvanični | da | — | ||||||
| Mađarska | zvanični | da | Jedlik Ányos – biogáz/biometán (HUF 40 bn) (zatvoren) | ||||||
| Meksiko | zvanični | — | — | ||||||
| Moldavija | zvanični | — | Tarif fix – biogaz (ANRE) (otvoren) | ||||||
| Nemačka | zvanični | da | EEG 2023 Güllekleinanlage (otvoren); EEG Ausschreibung Biomasse (aukcijski) | ||||||
| Poljska | zvanični | da | FIT/FIP biogaz rolniczy (≤ 1 MW) (otvoren); FIP biometan (≤ 1 MWe-eq.) (otvoren) | ||||||
| Rumunija | zvanični | — | — | ||||||
| Sjedinjene Države | zvanični | da | RFS D3 RINs (otvoren); RFS D3 + California LCFS (manure RNG) (otvoren) | ||||||
| Slovačka | zvanični | da | Doplatok OZE – bioplyn ≤ 500 kW (otvoren) | ||||||
| Srbija | zvanični | — | — | ||||||
| Španija | zvanični | da | — | ||||||
| Švedska | zvanični | — | Produktionsstöd biogas (aukcijski); Klimatklivet – biogas på gård (zatvoren) | ||||||
| Tajland | okvirni | — | VSPP/SPP biogas FiT 2022–2030 (zatvoren) | ||||||
| Turska | zvanični | — | YEKDEM – biyometanizasyon (otvoren) | ||||||
| Ujedinjeno Kraljevstvo | zvanični | da | Green Gas Support Scheme (otvoren) | ||||||
| Ukrajina | zvanični | da | Аукціон з ринковою премією (інші ВДЕ) — market-premium auction (aukcijski) | ||||||
| Vijetnam | okvirni | — | — |
Fizika i proces 119
Fermentor: vreme zadržavanja i organsko opterećenje određuju zapreminu. Suva materija i klima određuju tehnologiju; potrebu za toplotom računamo mesečno.
| Parametar | Vrednost | Tip | Pouzdanost | Izvor | Datum |
|---|---|---|---|---|---|
Lower heating value of methane eng.ch4_lhv_kwh_m3 | 9,97 kWh/Nm³ CH₄ | FACT | HIGH | ISO 6976:2016, net calorific value of methane, real gas at 0 °C, 101.325 kPa; NIST WebBook check · GLOBAL | |
Global warming potential of biogenic CH₄ (100 y) eng.gwp_ch4 | 27 kgCO₂e/kgCH₄ | FACT | HIGH | IPCC AR6 WGI, Ch. 7, Table 7.15 (non-fossil CH₄, GWP100 27.0) · GLOBAL | |
Methane density at 0 °C, 1 atm eng.ch4_density_kg_m3 | 0,717 kg/m³ | FACT | HIGH | NIST Chemistry WebBook SRD 69, methane at 273.15 K, 101.325 kPa: 0.7175 kg/m³ · GLOBAL | |
Dry CO₂ density at 0 °C, 1 atm eng.co2_density_kg_m3 | 1,977 kg/Nm³ | FACT | HIGH | NIST Chemistry WebBook SRD 69, CO₂ at 273.15 K, 101.325 kPa: 1.9768 kg/m³ (real gas) · GLOBAL | |
Natural-gas combustion emission factor eng.gas_emission_factor_t_mwh | 0,202 tCO₂/MWh | FACT | HIGH | IPCC 2006 Guidelines, Vol. 2, Ch. 2, Table 2.2: natural gas 56.1 tCO₂/TJ (NCV) · GLOBAL | |
Natural gas lower heating value eng.natgas_lhv_kwh_m3 | 9,5 kWh/m³ | ASSUMPTION | LOW | ISO 6976:2016 basis; pipeline gas 8.5–10.5 kWh/m³ by grid and metering temperature; invoice value takes precedence · GLOBAL | |
Natural gas HHV/LHV conversion eng.gas_hhv_lhv_ratio | 1,11 — | FACT | HIGH | ISO 6976:2016 (methane GCV/NCV 1.110); IEA/Eurostat convention NCV ≈ 0.9 × GCV · GLOBAL | |
Year-1 output share (biological start-up) eng.rampup_year1 | 0,75 — | ASSUMPTION | LOW | FNR, Guide to Biogas, 5th ed. 2010, §5.3.2: target loading reached ≈ day 110; start-up losses added · GLOBAL | |
Mesophilic digester temperature eng.digester_temp_c | 38 °C | ASSUMPTION | HIGH | FNR, Guide to Biogas, 5th ed. 2010, §2.2.2, p. 23 (mesophilic 37–42 °C) · GLOBAL | |
Specific heat of substrate eng.cp_substrate_kj_kgk | 3,9 kJ/(kg·K) | ESTIMATE | MEDIUM | Calculated: water 4.18 (IAPWS-95) and solids ≈ 1.5 kJ/(kg·K), weighted for ≈ 10 % DM · GLOBAL | |
Insulated digester wall/roof U-value eng.digester_u_value_w_m2k 10 cm mineral wool / equivalent; poor insulation is a main cause of high winter heat demand | 0,35 W/(m²·K) | ESTIMATE | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, Table 3.30, p. 66 (insulation λ 0.03–0.05, 5–10 cm) · GLOBAL | |
Digester floor U-value (to ground) eng.digester_floor_u_value_w_m2k | 0,5 W/(m²·K) | ESTIMATE | LOW | FNR, Guide to Biogas, 5th ed. 2010, Table 3.30 (load-bearing floor insulation); indirect · GLOBAL | |
Digester height/diameter eng.digester_h_over_d | 0,45 — | ASSUMPTION | LOW | Engineering judgement, no published value: typical farm tanks 6–10 m high, 12–30 m diameter (0.25–0.6) · GLOBAL | |
Total/working volume (gas holder, freeboard) eng.headspace_factor | 1,15 — | ASSUMPTION | LOW | FNR, Guide to Biogas, 5th ed. 2010, Table 8.4, p. 162 (+10 % volume margin) + freeboard · GLOBAL | |
Hydraulic retention time, manure-dominated feed eng.hrt_manure_days Mesophilic CSTR on cattle/pig slurry typically 30–40 d | 35 d | ASSUMPTION | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, Table 8.4, p. 162 (minimum HRT 30 d) · GLOBAL | |
Hydraulic retention time, manure + co-substrates eng.hrt_mixed_days | 30 d | ASSUMPTION | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, Table 8.4, p. 162 (minimum HRT 30 d) · GLOBAL | |
Hydraulic retention time when straw (pretreatment feedstocks) carries > 30 % of the VS eng.hrt_straw_days | 65 d | ASSUMPTION | MEDIUM | Danish Energy Agency, Technology Data for Renewable Fuels, ch. 81 Biogas Plants: the straw yield of 9.5 GJ CH4/t VS is stated at 65 days HRT; longer HRT raises it · GLOBAL | |
Hydraulic retention time, easily degradable waste eng.hrt_waste_days | 25 d | ASSUMPTION | LOW | Engineering judgement, no published value: readily degradable waste; below the 30 d farm-plant minimum (FNR 2010) · GLOBAL | |
Hydraulic retention time, high-rate reactor (UASB/EGSB) on dilute effluent eng.hrt_high_rate_days | 2 d | ASSUMPTION | LOW | van Lier et al., Rev. Environ. Sci. Biotechnol. 14 (2015): UASB HRT typically hours to 1 d, sizing OLR-driven; 2 d is conservative · GLOBAL | |
Max organic loading rate, high-rate reactor eng.olr_high_rate_kgvs_m3d | 8 kgVS/(m³·d) | ASSUMPTION | LOW | van Lier et al., Rev. Environ. Sci. Biotechnol. 14 (2015): UASB 10–15 kgCOD/(m³·d); low end on VS basis · GLOBAL | |
Hydraulic retention time, covered lagoon (warm climate) eng.hrt_lagoon_days | 40 d | ASSUMPTION | LOW | Engineering judgement, no published value: covered lagoons for POME / pig slurry 35–60 d · GLOBAL | |
Lowest annual mean air temperature at which a covered lagoon is offered eng.lagoon_min_mean_c | 15 °C | ASSUMPTION | LOW | Engineering judgement, no published value: operating US covered lagoons with read output sit at annual means of ≈ 15–18 °C (EPA AgSTAR: CA Central Valley, NC, MS); the one colder lagoon (PA) reads 2.7× below the heated-tank model · GLOBAL | |
Covered lagoon: methane ÷ heated tank on the same feed eng.lagoon_yield_factor | 0,85 — | CALCULATION | LOW | EPA AgSTAR Livestock AD Database (2024-06), covered lagoons with a read electricity value and electricity as the only gas use: heated-tank model ÷ reported, calibration half median 1.13 against 1.02 for heated tanks (≈ 0.9), holdout half ≈ 0.8; n = 7, self-reported; applied below a 20 °C annual mean only (where the plants sit) · GLOBAL | |
Max organic loading rate, covered lagoon eng.olr_lagoon_kgvs_m3d | 1 kgVS/(m³·d) | ASSUMPTION | LOW | Engineering judgement, no published value: low-rate unmixed lagoon, warm climate only · GLOBAL | |
Max organic loading rate, mesophilic CSTR eng.olr_max_kgvs_m3d Hard cap used for digester volume; poultry/fat-rich mixes use a lower cap | 3,5 kgVS/(m³·d) | ASSUMPTION | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, Table 8.4, p. 162 (≤ 2.5 overall, ≤ 5.0 first stage); upper end for one stage · GLOBAL | |
Max OLR when poultry/fat > 35 % of VS eng.olr_max_poultry_kgvs_m3d | 2,5 kgVS/(m³·d) | ASSUMPTION | LOW | FNR, Guide to Biogas, 5th ed. 2010, Table 8.4, p. 162 (conservative cap ≤ 2.5) · GLOBAL | |
Digestate storage required (closed spreading season) eng.storage_months | 6 months | ASSUMPTION | MEDIUM | Düngeverordnung 2017, §12(2): 6 months (9 without own land); national rules differ · GLOBAL | |
Delivered feedstock that actually arrives, low end (what to verify first) eng.supply_shortfall_low | 0,7 — | ASSUMPTION | LOW | Engineering judgement, no published value: documented plants ran short of promised feed: Fiscalini CA at 57 % of capacity, feed-limited (US DOE final report, OSTI 2011); Harderwijk NL 5 of 8 Mm³ planned gas (AEF 2022); UC Davis study: less feedstock than anticipated (2011) · GLOBAL | |
Change of traded feedstock prices and gate fees over the loan period (what to verify first) eng.feed_price_shift | 0,25 — | ASSUMPTION | LOW | Engineering judgement, no published value: ±25 % of each line's net price; Harderwijk NL failed on dearer co-products and lower manure gate fees than in the business case (AEF evaluation 2022) · GLOBAL | |
Digestate storage where the climate has no closed spreading season (annual mean ≥ 20 °C) eng.storage_months_warm | 3 months | ASSUMPTION | LOW | Engineering judgement, no published value: year-round growing season, so mainly a wet-season / crop-free-day buffer (3 months chosen on the cautious side, not a surveyed rule); local rules and wet-season spreading bans must be checked · GLOBAL | |
Gas-tight retention incl. digester (new plants) eng.gastight_retention_days | 150 d | ASSUMPTION | MEDIUM | TA Luft 2021 / VDI 3475-4: ≥ 150 d in a gas-tight system for new plants; small slurry plants may be exempt · GLOBAL | |
Plant electricity use, minimum per tonne (pumping, mixing of dilute feed) eng.parasitic_base_kwh_t | 3 kWh/t FM | ESTIMATE | LOW | Naegele et al., Energies 5 (2012): slurry plants; floor for dilute feed with little gas · GLOBAL | |
Mechanical size reduction of straw (milling), electricity eng.pretreatment_milling_kwh_t Mill CAPEX and any steam-explosion / alkali step are not modelled | 66,6 kWh/t FM | ESTIMATE | LOW | Dell'Omo et al., Methane 4(1) (2025): industrial-scale mill, > 1 t/h, 66.6 kWh per tonne of wheat straw; one device, no steam or alkali pretreatment · GLOBAL | |
Plant electricity use as a share of methane energy (LHV) eng.parasitic_share_gas_energy | 0,032 — | ESTIMATE | MEDIUM | DBFZ 05/2023 reference plants: own use 8 % of electricity at 36–41 % el. efficiency; Naegele 2012: 8.5 % · GLOBAL | |
ABP pasteurisation temperature used in screening eng.pasteurisation_temp_c | 70 °C | FACT | HIGH | EU Regulation 142/2011, Annex V, Ch. III: 70 °C for 60 min, particles ≤ 12 mm · GLOBAL | |
Heat recovery from ABP pasteurisation before mesophilic digestion eng.pasteurisation_heat_recovery | 0,6 — | ASSUMPTION | LOW | Engineering judgement, no published value: regenerative heat exchanger 50–75 %; supplier heat balance needed · GLOBAL | |
Share of feed nitrogen retained in digestate eng.digestate_n_retention | 0,95 — | ESTIMATE | MEDIUM | Düngeverordnung 2017, Anlage 2: digestate N counted at ≥ 95 % after storage losses · GLOBAL | |
Share of customer electricity load coinciding with biogas generation eng.self_consumption_coincidence | 0,85 — | ASSUMPTION | LOW | Engineering judgement, no published value: CHP runs ≈ 24/7; customer load profile needed · GLOBAL | |
Avoidable share of an unsplit customer electricity bill eng.invoice_variable_share | 0,85 — | ASSUMPTION | LOW | Engineering judgement, no published value: energy share of an unsplit bill; customer tariff sheet takes precedence · GLOBAL | |
Poultry share of VS above which NH₃ inhibition starts eng.poultry_inhib_threshold | 0,35 — | ESTIMATE | LOW | FNR, Guide to Biogas, 5th ed. 2010, Table 2.2, p. 26 (inhibition at NH₄-N > 3.0–3.5 g/L); poultry share is a proxy · GLOBAL | |
Yield loss per 10 pp poultry VS above threshold eng.poultry_inhib_loss_per_10pct | 0,04 — | ESTIMATE | LOW | Engineering judgement, no published value: site-specific; lab BMP and NH₄-N test needed · GLOBAL | |
Fat/grease share of VS above which overload risk eng.fat_share_warning | 0,25 — | ESTIMATE | LOW | Long et al., Process Saf. Environ. Prot. 90 (2012): stable FOG co-digestion up to ≈ 30 % of VS · GLOBAL | |
Ammonium nitrogen in the digester above which methanogens are inhibited eng.ammonium_inhib_g_l | 3 g NH₄-N/L | ESTIMATE | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, Table 2.2, p. 26: inhibition at NH₄-N > 3.0–3.5 g/L (lower bound used); FNR §5.1.9 Tab. 5.3 cites > 3 000 mg/L NH₄ as inhibiting; compared with the estimated NH₄-N (eng.ammonium_share_of_n) · GLOBAL | |
NH₄-N in the digester up to which continued digestion is documented (end of the FNR data series) eng.ammonium_documented_max_g_l | 7,3 g NH₄-N/L | CALCULATION | LOW | FNR, Guide to Biogas, 5th ed. 2010, §5.1.9 Tab. 5.3 (source [5-21]): digestion still ran (degree of degradation 56 %) at 257 mg/L free NH₃, 2.42 × the 106 mg/L of fully stable operation; 2.42 × the 3.0 g/L NH₄-N threshold (eng.ammonium_inhib_g_l) = 7.3 g/L. Above it the yield cut is an extrapolation, so the verdict cannot be strong without a dilution or co-digestion design · GLOBAL | |
Dry matter of the digester content in wet digestion (still pumpable) eng.wet_digester_dm_max | 0,12 — | FACT | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, §2.2 (pp. 22–23): wet digestion of energy crops at ≈ 12 % DM in the digester, "generally still pumpable"; at 15–16 % and above no longer pumpable (dry digestion) · GLOBAL | |
Share of total nitrogen present as ammonium nitrogen in the digester content eng.ammonium_share_of_n | 0,6 — | ESTIMATE | MEDIUM | LfL Bayern, Basisdaten Tab. 5a (Nov 2024): liquid biogas digestate 6.0 kg N and 3.60 kg NH₄-N per m³ (60 %), after storage losses; digestion mineralises organic N, so the share in the digester is at least this · GLOBAL | |
Methane-yield loss per unit of NH₄-N above the inhibition threshold, relative to the threshold eng.ammonium_loss_per_rel | 0,157 — | ESTIMATE | LOW | FNR, Guide to Biogas, 5th ed. 2010, §5.1.9 Tab. 5.3 (source [5-21]): degree of degradation 71 / 62 / 61 / 56 % at 106 / 155 / 207 / 257 mg/L free NH₃, i.e. 0.87 / 0.86 / 0.79 of the stable level at 1.46 / 1.95 / 2.42 × the concentration; least-squares slope through the stable point 0.157 per +100 %. Free NH₃ is proportional to NH₄-N at fixed pH and temperature (FNR Eq. 5.3), so the ratio is transferred to NH₄-N; acclimated plants (months of adaptation, FNR) tolerate more, so this is a central, not a worst case · GLOBAL | |
Sodium in the digester above which methanogens are moderately inhibited eng.sodium_inhib_g_l | 3,5 g Na⁺/L | ESTIMATE | MEDIUM | McCarty (1964) Tab. via Holmes & Blanc, J. Boston Soc. Civ. Eng. 62(3) (1975) Tab. 3: Na⁺ stimulatory 0.1–0.2, moderately inhibitory 3.5–5.5, strongly inhibitory 8 g/L (lower bound used); acclimated sludge tolerates more · GLOBAL | |
Sodium in the digester above which methanogens are strongly inhibited eng.sodium_strong_inhib_g_l | 8 g Na⁺/L | ESTIMATE | MEDIUM | McCarty (1964) Tab. via Holmes & Blanc, J. Boston Soc. Civ. Eng. 62(3) (1975) Tab. 3: strongly inhibitory 8 g Na⁺/L · GLOBAL | |
Total polyphenols in the digester above which methane formation is inhibited eng.polyphenol_inhib_g_l | 0,6 g/L | ESTIMATE | LOW | Zema et al., J. Agric. Eng. 49(2) 792 (2018): keep polyphenols < 0.6 g/L, published range 0.6–2 g/L, no consensus value; blends with > 20 % v/v three-phase olive mill wastewater inhibited · GLOBAL | |
Share of VS from olive pomace above which no stable continuous digestion is documented eng.phenolic_share_max | 0,65 — | ESTIMATE | LOW | Correa et al., Biotechnol. Biofuels Bioprod. 2025 (PMC12625033): semi-continuous CSTR at 1 g VS/(L·d), 21 d: alperujo alone 53 L CH4/kg VS (BMP 284), 65 % alperujo + 35 % pig manure (VS) 283; one study · GLOBAL | |
Inter-laboratory spread of a laboratory BMP (relative standard deviation) eng.lab_bmp_rsd | 0,08 — | ESTIMATE | MEDIUM | Hafner et al., Water 12(6) 1752 (2020), doi:10.3390/w12061752: RSD between laboratories < 8 % for tests meeting the validation criteria (7.5–24 % without) · GLOBAL | |
Nominal frequency of the public grid (selects the 50 or 60 Hz engine catalogue) eng.grid_hz | 50 Hz | FACT | HIGH | CERC (Indian Electricity Grid Code) Regulations 2023, Reg. 30(1): "The National Reference Frequency shall be 50.000 Hz and the allowable band of frequency shall be 49.900 - 50.050 Hz", quoted in CERC order 2/SM/2025 of 2025-03-29. cercind.gov.in (read 2026-11-08) · IN | |
CHP full-load hours ÷ 8 760 of a plant sized to its gas (availability × load) eng.plant_availability Measured on German manure CHP; also applied to sewage and landfill gas engines. No metered per-plant data elsewhere: US EIA-923/860 capacity factors (farm engines ≥ 1 MW) and French ODRÉ injection ÷ 'capacité théorique' mix operation with oversizing. Monte Carlo and scenarios keep their ±6–8 % spread, not this between-plant range | 0,891 — | ESTIMATE | LOW | No national metered per-plant data: German median as a stand-in, and the German between-plant p10–p90 (4 650–8 633 h ÷ median 7 801 h = × 0.60–1.11) as its range: a German distribution, not a measurement of this country's plants. German TSOs, EEG annual statement 2025 (netztransparenz.de): metered kWh (fed-in + reported own use) ÷ installed kW of non-flexible small manure CHP units ≤ 75 kW (§ 27b/46/44 EEG: sized to the farm's manure, no flexibility premium, no rated-output cap), median 7 801 h (n 786; halves 7 782 / 7 825), p10–p90 4 650–8 633 h between plants. Realised hours include gas shortfall; the model applies them to a plant sized to its gas · IN | |
Biogas boiler efficiency eng.boiler_efficiency | 0,9 — | ASSUMPTION | MEDIUM | Engineering judgement, no published value: non-condensing gas boiler 88–92 % (NCV) · GLOBAL | |
CH₄ slip in membrane upgrading eng.upgrade_slip_share | 0,007 — | ESTIMATE | MEDIUM | SGC Rapport 2013:270, Biogas upgrading: review of commercial technologies, §3.3 (membranes ≈ 0.5 %) · GLOBAL | |
CH₄ content of biomethane eng.biomethane_ch4_purity | 0,97 — | ASSUMPTION | MEDIUM | SGC Rapport 2013:270, §2.3; EU grid entry typically 97–98 % CH₄ · GLOBAL | |
Electricity for upgrading + compression eng.upgrade_kwh_per_nm3_raw | 0,3 kWh/Nm³ raw biogas | ESTIMATE | MEDIUM | SGC Rapport 2013:270, §2.3, §3.2 (membranes 0.20–0.30 kWh/Nm³ raw) · GLOBAL | |
Additional compression of biomethane to ~250 bar for road CNG eng.cng_compression_kwh_nm3 | 0,15 kWh/Nm³ biomethane | ESTIMATE | MEDIUM | Burckhardt Compression, CNG compressor technical sheet, 2022 (≈ 0.13–0.16 kWh/Nm³) · GLOBAL | |
Raw-biogas flow below which biomethane is flagged as sub-scale eng.upgrade_min_nm3h | 60 Nm³/h | ASSUMPTION | LOW | Engineering judgement, no published value: smallest commercial membrane units ≈ 50–100 Nm³/h raw · GLOBAL | |
Fresh-matter density of maize silage in a clamp eng.silage_density_kg_m3 | 780 kg FM/m³ | ESTIMATE | MEDIUM | LfL Bayern, Orientierungsbereiche Verdichtung von Gras- und Maissilagen: maize at 33 % DM 250–265 kg DM/m³ = 760–800 kg FM/m³ · GLOBAL | |
Distance to the gas grid when the client leaves it empty eng.gas_grid_default_km | 2 km | ASSUMPTION | LOW | Engineering judgement, no published value: placeholder for an unknown site; the client's distance replaces it — the grid operator's connection point decides · GLOBAL | |
N application ceiling from organic fertiliser eng.nitrates_limit_kg_n_ha | 170 kgN/ha·a | FACT | HIGH | Nitrates Directive 91/676/EEC, Annex III(2); UA alignment pending · GLOBAL | |
Extra plant-available N from digesting own manure eng.digestate_n_gain_own_manure | 0,15 of total N | ESTIMATE | LOW | Möller & Müller, Eng. Life Sci. 12 (2012): digestion raises the NH₄ share (10–25 %) · GLOBAL | |
Substitution credit for nutrients in imported waste eng.digestate_n_credit_imported | 0,6 of total N | ESTIMATE | MEDIUM | Düngeverordnung 2017 (2020), Anlage 3: liquid digestate 60 % N efficiency · GLOBAL | |
Substitution credit for P, K in imported waste eng.digestate_pk_credit_imported | 0,5 of total | ESTIMATE | LOW | AHDB Nutrient Management Guide (RB209), Section 2: P ≈ 50–60 %, K ≈ 80–90 % in year 1 · GLOBAL | |
Methane loss share considered good practice eng.methane_loss_good | 0,02 of production | ASSUMPTION | MEDIUM | IEA Bioenergy Task 37, Methane emissions from biogas plants, 2017, pp. 41–44 · GLOBAL | |
Methane loss share that cancels most climate benefit eng.methane_loss_high | 0,05 of production | ASSUMPTION | MEDIUM | IEA Bioenergy Task 37, 2017, pp. 41–44 (biowaste plants lose the benefit at ≈ 3.5–5.5 %) · GLOBAL | |
DM above which high-solids digestion is considered eng.dry_digestion_dm_pct | 22 % | ASSUMPTION | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, §3.1.1, p. 33; Table 8.4 (wet ≤ 12 % in digester; dry 20–30 % feed) · GLOBAL | |
DM above which a solids feeder / recirculation is needed eng.wet_solids_feeding_dm_pct | 12 % | ASSUMPTION | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, §2.2.1, p. 23 (pumpable up to ≈ 12 % DM) · GLOBAL | |
Relative band of catalogue DM × VS when the client gives no measured value eng.unc_catalogue_solids | 0,2 ± share | ESTIMATE | LOW | IPCC 2006 GL Vol. 4 §10.4.4: Tier 2 manure CH₄ factors, built from VS excretion and B0, carry ±20 %; applied here to catalogue DM × VS only (B0 has its own catalogue range) · GLOBAL | |
Relative band of a laboratory BMP value eng.unc_lab_bmp | 0,08 ± share | ESTIMATE | MEDIUM | Hafner et al. 2020, Water 12(6):1752: between-laboratory RSD < 8 % when validation criteria are met (7.5–24 % without them) · GLOBAL | |
RED default, biomethane from manure, open digestate, off-gas not combusted eng.ghg.bm.manure.open | 22 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from manure, open digestate, off-gas combusted eng.ghg.bm.manure.open_offgas | 1 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from manure, closed digestate, off-gas not combusted eng.ghg.bm.manure.closed | -79 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from manure, closed digestate, off-gas combusted eng.ghg.bm.manure.closed_offgas | -100 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas for electricity from manure (case 1), open digestate eng.ghg.el.manure.open | 3 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas for electricity from manure (case 1), closed digestate eng.ghg.el.manure.closed | -84 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas in a boiler from manure (case 3), open digestate eng.ghg.heat.manure.open | 9 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas in a boiler from manure (case 3), closed digestate eng.ghg.heat.manure.closed | -89 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED energy yield P(manure) for co-digestion weighting eng.ghg.yield.manure | 0,5 MJ biogas/kg FM | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B · GLOBAL | |
RED standard moisture SM(manure) eng.ghg.moisture.manure | 0,9 kg water/kg FM | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B · GLOBAL | |
RED default, biomethane from maize, open digestate, off-gas not combusted eng.ghg.bm.maize.open | 73 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from maize, open digestate, off-gas combusted eng.ghg.bm.maize.open_offgas | 52 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from maize, closed digestate, off-gas not combusted eng.ghg.bm.maize.closed | 51 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from maize, closed digestate, off-gas combusted eng.ghg.bm.maize.closed_offgas | 30 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas for electricity from maize (case 1), open digestate eng.ghg.el.maize.open | 47 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas for electricity from maize (case 1), closed digestate eng.ghg.el.maize.closed | 28 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas in a boiler from maize (case 3), open digestate eng.ghg.heat.maize.open | 59 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas in a boiler from maize (case 3), closed digestate eng.ghg.heat.maize.closed | 38 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED energy yield P(maize) for co-digestion weighting eng.ghg.yield.maize | 4,16 MJ biogas/kg FM | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B · GLOBAL | |
RED standard moisture SM(maize) eng.ghg.moisture.maize | 0,65 kg water/kg FM | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B · GLOBAL | |
RED default, biomethane from biowaste, open digestate, off-gas not combusted eng.ghg.bm.biowaste.open | 71 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from biowaste, open digestate, off-gas combusted eng.ghg.bm.biowaste.open_offgas | 50 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from biowaste, closed digestate, off-gas not combusted eng.ghg.bm.biowaste.closed | 35 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biomethane from biowaste, closed digestate, off-gas combusted eng.ghg.bm.biowaste.closed_offgas | 14 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas for electricity from biowaste (case 1), open digestate eng.ghg.el.biowaste.open | 44 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas for electricity from biowaste (case 1), closed digestate eng.ghg.el.biowaste.closed | 13 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas in a boiler from biowaste (case 3), open digestate eng.ghg.heat.biowaste.open | 57 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED default, biogas in a boiler from biowaste (case 3), closed digestate eng.ghg.heat.biowaste.closed | 22 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED energy yield P(biowaste) for co-digestion weighting eng.ghg.yield.biowaste | 3,41 MJ biogas/kg FM | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B · GLOBAL | |
RED standard moisture SM(biowaste) eng.ghg.moisture.biowaste | 0,76 kg water/kg FM | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B · GLOBAL | |
RED default addition for compressed biomethane as transport fuel eng.ghg.cbm_transport_add | 4,6 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001 (RED II), Annex VI part D default values as adopted (legislation.gov.uk/eudr/2018/2001/annex/VI); not changed by Directive (EU) 2023/2413, revision of Annexes V–VI pending · GLOBAL | |
RED fossil comparator, electricity (per MJ electricity) eng.ghg.comparator_el | 183 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B, point 19 · GLOBAL | |
RED Carnot share for useful heat below 150 °C (CHP allocation) eng.ghg.carnot_heat_150c | 0,3546 — | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B, point 1(d) · GLOBAL | |
RED fossil comparator, useful heat (per MJ heat) eng.ghg.comparator_heat | 80 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B, point 19 · GLOBAL | |
RED fossil comparator, transport fuel eng.ghg.comparator_transport | 94 gCO₂e/MJ | FACT | HIGH | Directive (EU) 2018/2001, Annex VI part B, point 19 · GLOBAL | |
RED minimum saving, electricity/heat from installations starting 2026 or later eng.ghg.min_saving_el_heat | 0,8 — | FACT | HIGH | Directive (EU) 2018/2001, Art. 29(10)(d) · GLOBAL | |
RED minimum saving, transport biogas from installations starting 2021 or later eng.ghg.min_saving_transport | 0,65 — | FACT | HIGH | Directive (EU) 2018/2001, Art. 29(10)(c) · GLOBAL | |
RED sustainability criteria apply to gaseous biomass fuel installations from this total rated thermal input eng.ghg.min_input_mw | 2 MW | FACT | HIGH | Directive (EU) 2018/2001, Art. 29(1) · GLOBAL | |
Manure per dairy cow and year eng.animal.dairy_cow.t_head_year | 13,6 t/head·a | CALCULATION | MEDIUM | IPCC 2019 Refinement Vol. 4 ch. 10, Table 10.13A (14.1 kg VS per 1 000 kg mass·d) × Table 10A.5 (285 kg), Indian subcontinent: 4.02 kg VS/head·d (regional default, not a national Tier 2 value); as excreted 12.8 % DM, VS 84 % of DM (USDA NRCS AWMFH ch. 4, 2008, from ASAE D384.2, a US composition); mass = VS ÷ (DM × VS share) · IN | |
Dry matter of dairy cow manure eng.animal.dairy_cow.dm_pct | 12,8 % FM | CALCULATION | MEDIUM | IPCC 2019 Refinement Vol. 4 ch. 10, Table 10.13A (14.1 kg VS per 1 000 kg mass·d) × Table 10A.5 (285 kg), Indian subcontinent: 4.02 kg VS/head·d (regional default, not a national Tier 2 value); as excreted 12.8 % DM, VS 84 % of DM (USDA NRCS AWMFH ch. 4, 2008, from ASAE D384.2, a US composition); mass = VS ÷ (DM × VS share) · IN | |
Volatile solids of dairy cow manure eng.animal.dairy_cow.vs_pct_dm | 84 % DM | FACT | MEDIUM | IPCC 2019 Refinement Vol. 4 ch. 10, Table 10.13A (14.1 kg VS per 1 000 kg mass·d) × Table 10A.5 (285 kg), Indian subcontinent: 4.02 kg VS/head·d (regional default, not a national Tier 2 value); as excreted 12.8 % DM, VS 84 % of DM (USDA NRCS AWMFH ch. 4, 2008, from ASAE D384.2, a US composition); mass = VS ÷ (DM × VS share) · IN | |
Manure per laying hen and year eng.animal.layer_hen.t_head_year | 0,0343 t/head·a | CALCULATION | MEDIUM | IPCC 2019 Refinement Vol. 4 ch. 10, Table 10.13A (13.2 kg VS per 1 000 kg mass·d) × Table 10A.5 (1.3 kg), Indian subcontinent: 17.2 g VS/hen·d (regional default, not a national Tier 2 value); as excreted 25 % DM, VS 73 % of DM (USDA NRCS AWMFH ch. 4, 2008, from ASAE D384.2, a US composition); mass = VS ÷ (DM × VS share) · IN | |
Dry matter of laying hen manure eng.animal.layer_hen.dm_pct | 25 % FM | CALCULATION | MEDIUM | IPCC 2019 Refinement Vol. 4 ch. 10, Table 10.13A (13.2 kg VS per 1 000 kg mass·d) × Table 10A.5 (1.3 kg), Indian subcontinent: 17.2 g VS/hen·d (regional default, not a national Tier 2 value); as excreted 25 % DM, VS 73 % of DM (USDA NRCS AWMFH ch. 4, 2008, from ASAE D384.2, a US composition); mass = VS ÷ (DM × VS share) · IN | |
Volatile solids of laying hen manure eng.animal.layer_hen.vs_pct_dm | 73 % DM | FACT | MEDIUM | IPCC 2019 Refinement Vol. 4 ch. 10, Table 10.13A (13.2 kg VS per 1 000 kg mass·d) × Table 10A.5 (1.3 kg), Indian subcontinent: 17.2 g VS/hen·d (regional default, not a national Tier 2 value); as excreted 25 % DM, VS 73 % of DM (USDA NRCS AWMFH ch. 4, 2008, from ASAE D384.2, a US composition); mass = VS ÷ (DM × VS share) · IN | |
Manure per young / beef cattle and year eng.animal.cattle_other.t_head_year | 9,3 t/head·a | FACT | LOW | DüV 2017 Anlage 9 Tab. 1 row 2 (young-stock slurry 4.65 m³ per place·6 months) × 2; 7.5 % DM per LfL Basisdaten Tab. 5a (Nov 2024); VS 80 % of DM (FNR); German norm transferred, no national value; IPCC 2019 Indian subcontinent other cattle as excreted 2.76 kg VS/head·d is an upper bound · IN | |
Dry matter of young / beef cattle manure eng.animal.cattle_other.dm_pct | 7,5 % FM | FACT | LOW | DüV 2017 Anlage 9 Tab. 1 row 2 (young-stock slurry 4.65 m³ per place·6 months) × 2; 7.5 % DM per LfL Basisdaten Tab. 5a (Nov 2024); VS 80 % of DM (FNR); German norm transferred, no national value; IPCC 2019 Indian subcontinent other cattle as excreted 2.76 kg VS/head·d is an upper bound · IN | |
Volatile solids of young / beef cattle manure eng.animal.cattle_other.vs_pct_dm | 80 % DM | FACT | LOW | DüV 2017 Anlage 9 Tab. 1 row 2 (young-stock slurry 4.65 m³ per place·6 months) × 2; 7.5 % DM per LfL Basisdaten Tab. 5a (Nov 2024); VS 80 % of DM (FNR); German norm transferred, no national value; IPCC 2019 Indian subcontinent other cattle as excreted 2.76 kg VS/head·d is an upper bound · IN |
Kogeneracija (CHP) 64
CHP — kogeneracija: motor na biogas istovremeno proizvodi električnu energiju i korisnu toplotu.
| Parametar | Vrednost | Tip | Pouzdanost | Izvor | Datum |
|---|---|---|---|---|---|
CHP reference electrical efficiency at 20 kW eng.chp_eta_el_20 | 0,297 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 20 kW eng.chp_eta_th_20 | 0,614 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 30 kW eng.chp_eta_el_30 | 0,309 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 30 kW eng.chp_eta_th_30 | 0,608 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 44 kW eng.chp_eta_el_44 | 0,326 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 44 kW eng.chp_eta_th_44 | 0,583 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 83 kW eng.chp_eta_el_83 | 0,35 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 83 kW eng.chp_eta_th_83 | 0,506 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 106 kW eng.chp_eta_el_106 | 0,366 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 106 kW eng.chp_eta_th_106 | 0,49 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 124 kW eng.chp_eta_el_124 | 0,369 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 124 kW eng.chp_eta_th_124 | 0,491 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 166 kW eng.chp_eta_el_166 | 0,377 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 166 kW eng.chp_eta_th_166 | 0,493 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 182 kW eng.chp_eta_el_182 | 0,391 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 182 kW eng.chp_eta_th_182 | 0,48 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 200 kW eng.chp_eta_el_200 | 0,391 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 200 kW eng.chp_eta_th_200 | 0,479 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 354 kW eng.chp_eta_el_354 | 0,402 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 354 kW eng.chp_eta_th_354 | 0,451 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 430 kW eng.chp_eta_el_430 | 0,394 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 430 kW eng.chp_eta_th_430 | 0,464 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 528 kW eng.chp_eta_el_528 | 0,402 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 528 kW eng.chp_eta_th_528 | 0,445 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 600 kW eng.chp_eta_el_600 | 0,427 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 600 kW eng.chp_eta_th_600 | 0,436 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 800 kW eng.chp_eta_el_800 | 0,431 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 800 kW eng.chp_eta_th_800 | 0,433 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 999 kW eng.chp_eta_el_999 | 0,426 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 999 kW eng.chp_eta_th_999 | 0,464 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 1200 kW eng.chp_eta_el_1200 | 0,43 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 1200 kW eng.chp_eta_th_1200 | 0,46 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 1560 kW eng.chp_eta_el_1560 | 0,426 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 1560 kW eng.chp_eta_th_1560 | 0,464 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 1840 kW eng.chp_eta_el_1840 | 0,436 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 1840 kW eng.chp_eta_th_1840 | 0,436 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 2300 kW eng.chp_eta_el_2300 | 0,434 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference thermal efficiency at 2300 kW eng.chp_eta_th_2300 | 0,434 — | ESTIMATE | MEDIUM | TEDOM Basic Technical Data, BIOGAS 50 Hz, edition 03/2025, p.1. Full-load reference, ISO 3046-1 fuel tolerance; site gas, temperature, altitude and emissions require supplier guarantees. tedom.com · GLOBAL | |
CHP reference electrical efficiency at 27 kW, 60 Hz eng.chp60_eta_el_27 | 0,32 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 27 kW, 60 Hz eng.chp60_eta_th_27 | 0,577 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 94 kW, 60 Hz eng.chp60_eta_el_94 | 0,337 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 94 kW, 60 Hz eng.chp60_eta_th_94 | 0,527 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 191 kW, 60 Hz eng.chp60_eta_el_191 | 0,368 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 191 kW, 60 Hz eng.chp60_eta_th_191 | 0,503 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 375 kW, 60 Hz eng.chp60_eta_el_375 | 0,387 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 375 kW, 60 Hz eng.chp60_eta_th_375 | 0,492 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 555 kW, 60 Hz eng.chp60_eta_el_555 | 0,383 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 555 kW, 60 Hz eng.chp60_eta_th_555 | 0,484 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 600 kW, 60 Hz eng.chp60_eta_el_600 | 0,417 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 600 kW, 60 Hz eng.chp60_eta_th_600 | 0,448 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 800 kW, 60 Hz eng.chp60_eta_el_800 | 0,419 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 800 kW, 60 Hz eng.chp60_eta_th_800 | 0,446 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 1200 kW, 60 Hz eng.chp60_eta_el_1200 | 0,428 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 1200 kW, 60 Hz eng.chp60_eta_th_1200 | 0,44 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 1560 kW, 60 Hz eng.chp60_eta_el_1560 | 0,423 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 1560 kW, 60 Hz eng.chp60_eta_th_1560 | 0,445 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference electrical efficiency at 2000 kW, 60 Hz eng.chp60_eta_el_2000 | 0,427 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
CHP reference thermal efficiency at 2000 kW, 60 Hz eng.chp60_eta_th_2000 | 0,44 — | ESTIMATE | MEDIUM | TEDOM CHP units, Micro, Cento and Quanto 60 Hz series, Biogas table, edition 04/2025, p. 2 (LHV, full load, ISO 3046-1 fuel tolerance). tedom.com · GLOBAL | |
Sewage-gas engines: realised electrical efficiency ÷ datasheet at the unit size eng.chp_sewage_site_factor | 0,8 — | CALCULATION | LOW | US EIA-923 (2025, digester gas OBG, reciprocating engines: net MWh ÷ fuel for electricity, HHV) with EIA-860 (2025) nameplate per unit, against the TEDOM 60 Hz datasheet (US grid): 13 wastewater plants, median 0.79 (p10–p90 0.70–0.99; calibration half 0.83, holdout 0.79); capacity factor median 0.36 (part load). Net of the engines' own use; siloxanes and part load as on landfill gas · GLOBAL | |
Landfill-gas engines: realised electrical efficiency ÷ datasheet at the unit size eng.chp_landfill_site_factor | 0,8 — | ESTIMATE | MEDIUM | US EPA LMOP Landfill and Project Database (2024-09, 2022 data): 284 reciprocating-engine projects, actual MW ÷ methane delivered (LHV) ÷ TEDOM 60 Hz full-load value (US grid) = median 0.81 (p10–p90 0.68–0.92), same in every load band; fitted on half the projects (0.81), 0.80 on the other half. LMOP defines its MW as actual OR estimated and the flow as current or planned, so this is not purely metered. Part load, siloxanes, ageing; AD biogas engines keep the datasheet (AgSTAR heated tanks median 0.95) · GLOBAL | |
Heat delivery allowance after rated CHP thermal output eng.chp_heat_recovery | 0,92 — | ESTIMATE | LOW | Engineering judgement, no published value: 5–10 % piping and exchanger losses from CHP to the user · GLOBAL | |
CHP design full-load hours eng.chp_design_hours | 8.000 h/a | ASSUMPTION | MEDIUM | FNR, Guide to Biogas, 5th ed. 2010, Table 8.4, p. 162 (8 000 full-load h/a); flexible operation lowers hours · GLOBAL | |
Smallest CHP the model treats as technically sensible eng.chp_min_kw Below this, CHP is a hobby-scale installation; model returns NOT RECOMMENDED unless another route works | 25 kWel | ASSUMPTION | LOW | TEDOM Basic Technical Data, BIOGAS 50 Hz, 03/2025: smallest unit 20 kWel · GLOBAL | |
Unburned CH₄ (methane slip) in CHP exhaust eng.chp_slip_share | 0,01 — | ESTIMATE | MEDIUM | IEA Bioenergy Task 37, Methane emissions from biogas plants, 2017, pp. 32–33 (spark ignition ≈ 1 %) · GLOBAL |
CAPEX: inženjerske procene investicionih troškova 34
CAPEX — početna ulaganja u opremu, izgradnju, priključke i puštanje u rad.
| Parametar | Vrednost | Tip | Pouzdanost | Izvor | Datum |
|---|---|---|---|---|---|
Digester tank incl. insulation, mixers, heating, membrane roof, at 1 000 m³ eng.capex.digester_eur_m3_1000 Scales as V^-0.2; replace with 3–5 current supplier quotations | 190 EUR/m³ working | ESTIMATE | LOW | German component data 2012 (≈ 83–160 €/m³) × Destatis construction index 2012→2025 (×1.82) = 150–290 €/m³; checked against DBFZ 2023 reference plants · GLOBAL | |
Digester unit-cost scale exponent eng.capex.digester_scale_exp | -0,2 — | ASSUMPTION | LOW | Engineering judgement, no published value: concrete tanks cost ∝ V^0.8 · GLOBAL | |
Covered anaerobic lagoon (liner, HDPE gas-tight cover, gas collection) eng.capex.lagoon_eur_m3 | 30 EUR/m³ | ESTIMATE | LOW | CDFA dairy digester programme via Energy Institute at Haas, 2024: ≈ $950 per cow (≈ $32/m³) · GLOBAL | |
High-rate reactor (UASB/EGSB) incl. equalisation eng.capex.high_rate_eur_m3 | 650 EUR/m³ working | ESTIMATE | LOW | Engineering judgement, no published value: industrial UASB/EGSB; vendor quotes needed, proxies range up to ≈ 2× · GLOBAL | |
Gas-tight cover on an existing lagoon/tank eng.capex.cover_existing_eur_m3 | 30 EUR/m³ | ESTIMATE | LOW | top agrar 2012 (manufacturer data): gas-tight roof > 50 % of a 65–110 €/m³ tank, i.e. ≥ 33 €/m³ · GLOBAL | |
New gas-tight covered digestate storage eng.capex.storage_new_eur_m3 | 120 EUR/m³ | ESTIMATE | LOW | top agrar 2012: 65–110 €/m³ for 1 500–5 000 m³ gas-tight tanks × Destatis construction index to 2025 (×1.82); lower end · GLOBAL | |
Open storage cost relative to gas-tight storage eng.capex.storage_open_share | 0,5 — | ESTIMATE | LOW | top agrar 2012 (manufacturer data): the gas-tight roof is > 50 % of the tank cost · GLOBAL | |
CHP unit incl. installation at 100 kWel eng.capex.chp_eur_kw_100 | 2.400 EUR/kWel | ESTIMATE | LOW | DBFZ/IEE for BMWK 2024: biogas CHP cost +31–40 % 2020→2023 (BHKW-Infozentrum); LWK NRW 2023: ≈ 2 830 €/kW at 30 kW · GLOBAL | |
CHP unit-cost scale exponent eng.capex.chp_scale_exp | -0,25 — | ASSUMPTION | LOW | Danish Energy Agency, Technology Data, sheet 06 biogas engines (EUR2020); fits 30 kW–1 MW costs · GLOBAL | |
Gas holder, flare, desulphurisation: fixed part eng.capex.gas_system_fixed | 30.000 EUR | ESTIMATE | LOW | US EPA LMOP, LFGcost-Web v3.4 manual, 2020: flare system fixed part ≈ $26 000 · GLOBAL | |
Gas system variable part eng.capex.gas_system_per_nm3h | 120 EUR per Nm³/h raw biogas | ESTIMATE | LOW | US EPA LMOP, LFGcost-Web v3.4 manual, 2020: flare system ≈ $200 per Nm³/h (landfill); biogas flares cheaper · GLOBAL | |
Bunker silo (clamp) for ensiled energy crops, construction only eng.capex.silage_clamp_eur_m3 | 60 EUR/m³ | ESTIMATE | LOW | LfL Bayern via top agrar: clamp built for 47 €/m³ gross in 2015/16 → ≈ 40 € net × ≈ 1.5 construction-price rise to 2025 ≈ 60 €/m³; upper check: Landratsamt Schweinfurt building-fee reference values 2026, Fahrsilo 94–142 €/m³ incl. VAT and planning (≈ 70–105 € without). Engineering and contingency are added by the model. Supplier quote needed · GLOBAL | |
Slurry pit, pumps, pipework eng.capex.feed_slurry | 25.000 EUR | ESTIMATE | LOW | LWK NRW, Mini-Biogasanlagen (FNR event), 2023: pumps & mixers 50 k€ for 30 kW incl. digester mixers · GLOBAL | |
Solids feeder / hopper eng.capex.feed_solids | 70.000 EUR | ESTIMATE | LOW | Engineering judgement, no published value: supplier quotes needed · GLOBAL | |
Waste reception, crushing, buffer tank eng.capex.reception_waste | 60.000 EUR | ESTIMATE | LOW | Engineering judgement, no published value: supplier quotes needed · GLOBAL | |
Depackaging / sorting line and enclosed reception for contaminated waste eng.capex.pretreatment_eur_per_tpa | 45 EUR per t/a | ESTIMATE | LOW | Engineering judgement, no published value: biowaste / food-waste reception halls; supplier quotes needed · GLOBAL | |
Pasteurisation (70 °C / 1 h) unit, fixed eng.capex.pasteurisation_fixed | 70.000 EUR | ESTIMATE | LOW | Engineering judgement, no published value: EU 142/2011 Cat. 3 unit; supplier quotes needed · GLOBAL | |
Pasteurisation unit, variable eng.capex.pasteurisation_per_tday | 1.800 EUR per t/d | ESTIMATE | LOW | Engineering judgement, no published value: supplier quotes needed · GLOBAL | |
Heat exchangers / pipes to consumer, fixed eng.capex.heat_network_fixed | 25.000 EUR | ESTIMATE | LOW | Engineering judgement, no published value: depends on pipe length; local quote needed · GLOBAL | |
Heat network variable eng.capex.heat_network_per_kw | 100 EUR/kWth | ESTIMATE | LOW | Engineering judgement, no published value: depends on pipe length; local quote needed · GLOBAL | |
Biogas boiler incl. installation eng.capex.boiler_eur_kw | 90 EUR/kWth | ESTIMATE | LOW | Danish Energy Agency, Technology Data, sheet 44 gas boilers: 64 €/kWth (EUR2020, 2–3 MW) × 1.3 · GLOBAL | |
Electrical, I&C, SCADA eng.capex.electrical_share | 0,06 of equipment | ESTIMATE | LOW | LWK NRW, Mini-Biogasanlagen (FNR event), 2023: ≈ 8.5 % for a 30 kW plant · GLOBAL | |
Gas/substrate piping eng.capex.piping_share | 0,04 of equipment | ESTIMATE | LOW | Engineering judgement, no published value: share of equipment cost · GLOBAL | |
Civil works, roads, fencing eng.capex.civil_share | 0,06 of equipment | ESTIMATE | LOW | LWK NRW, Mini-Biogasanlagen (FNR event), 2023: earthworks ≈ 10 % for a 30 kW plant · GLOBAL | |
Engineering, permits, EIA, commissioning eng.capex.engineering_share | 0,08 of subtotal | ESTIMATE | MEDIUM | DBFZ/IEE for BMWK, Kostenentwicklung Biomasseanlagen, 2024, Tab. 4-1: planning 8 % · GLOBAL | |
Contingency eng.capex.contingency_share | 0,1 of subtotal | ASSUMPTION | MEDIUM | Engineering judgement, no published value: typical for pre-FEED estimates; AACE Class 5 accuracy −20…−50 % / +30…+100 % · GLOBAL | |
Electrical grid connection (behind the meter / small export) eng.capex.grid_connection_fixed | 20.000 EUR | ESTIMATE | LOW | Engineering judgement, no published value: grid operator quote needed · GLOBAL | |
Grid connection variable eng.capex.grid_connection_per_kw | 60 EUR/kWel | ESTIMATE | LOW | Engineering judgement, no published value: grid operator quote needed · GLOBAL | |
Membrane upgrading unit at 250 Nm³/h raw biogas (incl. compression and off-gas treatment) eng.capex.upgrade_ref_eur | 1.200.000 EUR | ESTIMATE | MEDIUM | IBKE, Leitfaden Rohbiogas-Sammelleitungen, 2024, Tab. 4: 1.2 M€ at 250 Nm³/h, 2.0 M€ at 750 Nm³/h, incl. off-gas treatment · GLOBAL | |
Upgrading scale exponent eng.capex.upgrade_scale_exp | 0,65 — | ASSUMPTION | MEDIUM | Danish Energy Agency, Renewable Fuels, sheet 91 upgrading (EUR2020); IBKE 2024 ≈ 0.5–0.6 · GLOBAL | |
Compression, metering, injection station eng.capex.injection_fixed | 350.000 EUR | ESTIMATE | LOW | GRDF connection presentation, 2018: ≈ 0.4–0.5 M€ equivalent; distribution grid only (transmission ≈ 2 M€) · GLOBAL | |
Bio-CNG off-grid offtake: filling post + 3–4 cascade trailers (≈ 4 000–5 000 Nm³ each) eng.capex.cng_fixed | 450.000 EUR | ESTIMATE | LOW | Engineering judgement, no published value: virtual-pipeline practice; US EPA LFGcost 2020 CNG station gives the same order · GLOBAL | |
Bio-CNG high-pressure (250 bar) compression eng.capex.cng_per_nm3h | 1.000 EUR per Nm³/h biomethane | ESTIMATE | LOW | Engineering judgement, no published value: reciprocating CNG compressors 100–1 000 Nm³/h; supplier quotes needed · GLOBAL | |
Pipeline to gas main eng.capex.pipeline_eur_km | 200.000 EUR/km | ESTIMATE | MEDIUM | IBKE, Leitfaden Rohbiogas-Sammelleitungen, 2024: PE lines 80–300 €/m · GLOBAL |
OPEX 14
OPEX — tekući troškovi sirovina, prevoza, energije, osoblja i održavanja.
| Parametar | Vrednost | Tip | Pouzdanost | Izvor | Datum |
|---|---|---|---|---|---|
Minimum operator time eng.opex.labour_min_hours | 750 h/a | ASSUMPTION | LOW | IEE/DBFZ, EEG-Erfahrungsbericht Biomasse, 2023, Tab. 5-4: 75 kW slurry plant ≈ 500–750 h/a · GLOBAL | |
Operator time at 1 kWel, power-law fit h = a·kWel^b eng.opex.labour_hours_coef Maize-silage farm plants 18–1 000 kWel; above 1 MW and for waste plants with reception and pasteurisation the fit is an extrapolation (≈ 3.3 h/kW at 1 MW, 2.1 at 5 MW; IBKE 2024 example ≈ 2.6) | 22,5 h/a | ESTIMATE | MEDIUM | Walla & Schneeberger, Biomass and Bioenergy 32 (2008) 551–557, Table 2 (labour from Keymer & Reinhold; 20 €/h): 12 390 / 23 275 / 39 550 €/a at 100 / 250 / 500 kWel = 620 / 1 164 / 1 978 h/a; fit a = 22.5, b = 0.72 reproduces all three within 2 % · GLOBAL | |
Operator time scale exponent b eng.opex.labour_hours_exp | 0,72 — | ESTIMATE | MEDIUM | Fit to Walla & Schneeberger (2008) Table 2: labour grows less than proportionally with size · GLOBAL | |
CHP full-maintenance contract at 100 kWel (oil, spares, overhaul) eng.opex.chp_service_eur_kwh | 0,026 EUR/kWhel | ESTIMATE | LOW | ASUE BHKW-Kenndaten 2011 (biogas full maintenance) escalated by BHKW-Infozentrum data to 2023 (DBFZ/IEE 2024) · GLOBAL | |
CHP service cost scale exponent eng.opex.chp_service_scale_exp | -0,32 — | ESTIMATE | LOW | Fit of 2.6 ct at 100 kW (ASUE 2011, escalated) to ≈ 1.0 ct at 1–10 MW (Danish Energy Agency, sheet 06, 2023) · GLOBAL | |
Maintenance of non-CHP plant eng.opex.maintenance_share | 0,02 of CAPEX/a | ESTIMATE | MEDIUM | IEE/DBFZ, EEG-Erfahrungsbericht Biomasse, 2023, §5.4: 2 % of initial investment · GLOBAL | |
Insurance eng.opex.insurance_share | 0,005 of CAPEX/a | ESTIMATE | MEDIUM | IBKE, Leitfaden Rohbiogas-Sammelleitungen, 2024, Tab. 5: 0.5 % of investment · GLOBAL | |
Lab tests, safety inspections, gas monitoring eng.opex.monitoring_fixed | 5.000 EUR/a | ESTIMATE | LOW | Engineering judgement, no published value: lab analyses and inspections · GLOBAL | |
Upgrading maintenance eng.opex.upgrade_maintenance_share | 0,04 of upgrading CAPEX/a | ESTIMATE | MEDIUM | Danish Energy Agency, Renewable Fuels, sheet 91 (≈ 4.8 %); IBKE 2024 full maintenance ≈ 3.3 % · GLOBAL | |
Bio-CNG road haulage to the offtaker (30–60 km) eng.opex.cng_haul_eur_nm3 | 0,04 EUR/Nm³ | ESTIMATE | LOW | Engineering judgement, no published value: ≈ 4 500 Nm³ per trailer trip at 150–200 €; haulier quotes needed · GLOBAL | |
Pre-treatment rejects, packaged food waste eng.opex.reject_share_food_waste | 0,1 of input mass | ESTIMATE | MEDIUM | Huber UK via ADBA, 2025: depackaging rejects 7–12 % of food waste · GLOBAL | |
Pre-treatment rejects, municipal biowaste eng.opex.reject_share_biowaste | 0,2 of input mass | ESTIMATE | MEDIUM | Alia / Comune di Prato, 2021: impurities 8–16 %, rejects ≈ 2×; DBFZ 2023 assumes 5 % in Germany · GLOBAL | |
Disposal of pre-treatment rejects (incineration / landfill) eng.opex.reject_disposal_eur_t | 100 EUR/t | ESTIMATE | MEDIUM | IEE/DBFZ, EEG-Erfahrungsbericht Biomasse, 2023, Tab. 5-6: incineration 100 €/t (DE); use local gate fee · GLOBAL | |
Certification, trading, balancing for biomethane eng.opex.certification_eur_nm3 | 0,03 EUR/Nm³ | ESTIMATE | LOW | IBKE, Leitfaden Rohbiogas-Sammelleitungen, 2024, Tab. 5: ≈ 0.01–0.02 €/Nm³ + trading fees · GLOBAL |
Tržišni i finansijski parametri 31
Referentne vrednosti za izabrano tržište. Vrednosti za projekat mogu se razlikovati u zavisnosti od potrošnje i cena koje unesete. Svaki parametar ima izvor i nivo pouzdanosti.
Indija
Referentne vrednosti za izabrano tržište. Vrednosti za projekat mogu se razlikovati u zavisnosti od potrošnje i cena koje unesete. Svaki parametar ima izvor i nivo pouzdanosti.
| Parametar | Vrednost | Tip | Pouzdanost | Izvor | Datum |
|---|---|---|---|---|---|
Exchange rate econ.fx_local_per_eur | 105,1435 INR/EUR | FACT | HIGH | Official EUR reference rate, 2026-11-09 · IN | |
Business electricity reference, excl. VAT (default if the customer gives none) econ.electricity_retail_eur_kwh CEA Electricity Tariff & Duty and Average Rates of Electricity Supply in India, March 2026, table 6(f): large industry, 1 000 kW at 60 % load factor, 11 kV, excl. electricity duty; FY2025-26 tariffs. National value = median of states. Fuel surcharges not uniform (Gujarat understated). | 0,07703757 EUR/kWh | CALCULATION | MEDIUM | CEA Electricity Tariff & Duty and Average Rates of Electricity Supply in India, March 2026, table 6(f): large industry, 1 000 kW at 60 % load factor, 11 kV, excl. electricity duty; FY2025-26 tariffs. National value = median of states. Fuel surcharges not uniform (Gujarat understated). Average rate in paise/kWh ÷ 100 ÷ INR per EUR. Converted at 105.144 INR/EUR (2026-11-09). · IN | |
Wholesale electricity price (market average) econ.electricity_spot_eur_kwh Official day-ahead or wholesale average where published | 0,03671173 EUR/kWh | CALCULATION | MEDIUM | IEX day-ahead market average FY 2025-26 Rs 3.86/kWh; converted at 105.144 INR/EUR (2026-11-09) · IN | |
Share of the wholesale price realised for surplus power econ.export_haircut | 0,85 — | ASSUMPTION | MEDIUM | 15 % profile & balancing discount for a small seller (assumption, same for all markets) · IN | |
Share of the bill actually avoided by self-generation econ.self_consumption_variable_share | 0,85 — | ASSUMPTION | MEDIUM | TOU reference: energy/Ft portion only, demand/service charges retained. Else 85% engineering allowance. User invoice uses the generic allowance until its energy/demand split is known. · IN | |
Value of useful heat (displaced gas / boiler efficiency) econ.heat_value_eur_kwh_th | 0,04282198 EUR/kWh th | CALCULATION | MEDIUM | Business gas 38.53977914768159 €/MWh LHV ÷ 0.9 · IN | |
Business natural-gas price, excl. VAT, LHV basis econ.gas_price_eur_mwh | 38,53977915 EUR/MWh LHV | CALCULATION | MEDIUM | PPAC notification 30.09.2026: gas price ceiling (market-priced deepwater/HPHT gas) US$ 9.89/MMBtu GCV for Oct 2026 – Mar 2027 (APM price Oct 2026 US$ 11.22, Sep 9.00) + US$ 1.5/MMBtu pipeline & distribution adder (assumption) = US$ 11.39/MMBtu; converted at 1.1193 USD/EUR (2026-11-09); HHV × 1.11 → LHV · IN | |
Biomethane price without support, conservative econ.biomethane_price_cons_eur_nm3 | 0,29817148 EUR/Nm³ | CALCULATION | LOW | Uncontracted industrial gas-parity reference: 38.53977914768159 EUR/MWh LHV × product LHV; engineering range 80–130% of parity, not observed transactions. PPAC notification 30.09.2026: gas price ceiling (market-priced deepwater/HPHT gas) US$ 9.89/MMBtu GCV for Oct 2026 – Mar 2027 (APM price Oct 2026 US$ 11.22, Sep 9.00) + US$ 1.5/MMBtu pipeline & distribution adder (assumption) = US$ 11.39/MMBtu; converted at 1.1193 USD/EUR (2026-11-09); HHV × 1.11 → LHV. GOBARdhan procurement is conditional and shown only as a separate support case; buyer quotation and logistics required.; conservative scenario reference 0.29817148012745115 EUR/Nm³ · IN | |
Biomethane price without support, base econ.biomethane_price_base_eur_nm3 | 0,37271435 EUR/Nm³ | CALCULATION | LOW | Uncontracted industrial gas-parity reference: 38.53977914768159 EUR/MWh LHV × product LHV; engineering range 80–130% of parity, not observed transactions. PPAC notification 30.09.2026: gas price ceiling (market-priced deepwater/HPHT gas) US$ 9.89/MMBtu GCV for Oct 2026 – Mar 2027 (APM price Oct 2026 US$ 11.22, Sep 9.00) + US$ 1.5/MMBtu pipeline & distribution adder (assumption) = US$ 11.39/MMBtu; converted at 1.1193 USD/EUR (2026-11-09); HHV × 1.11 → LHV. GOBARdhan procurement is conditional and shown only as a separate support case; buyer quotation and logistics required. · IN | |
Biomethane price without support, optimistic econ.biomethane_price_opt_eur_nm3 | 0,48452866 EUR/Nm³ | CALCULATION | LOW | Uncontracted industrial gas-parity reference: 38.53977914768159 EUR/MWh LHV × product LHV; engineering range 80–130% of parity, not observed transactions. PPAC notification 30.09.2026: gas price ceiling (market-priced deepwater/HPHT gas) US$ 9.89/MMBtu GCV for Oct 2026 – Mar 2027 (APM price Oct 2026 US$ 11.22, Sep 9.00) + US$ 1.5/MMBtu pipeline & distribution adder (assumption) = US$ 11.39/MMBtu; converted at 1.1193 USD/EUR (2026-11-09); HHV × 1.11 → LHV. GOBARdhan procurement is conditional and shown only as a separate support case; buyer quotation and logistics required.; optimistic scenario reference 0.48452865520710814 EUR/Nm³ · IN | |
Official hourly labour cost, economy-wide (wages + employer costs) econ.labour_official_eur_h | 1,25542711 EUR/h | CALCULATION | MEDIUM | MoSPI PLFS Annual Report 2025 (press note 27.03.2026): regular wage/salaried earnings, men Rs 24 217, women Rs 18 353/month; ≈ Rs 22 000 all persons × 12 × 1.15 employer EPF/ESI ÷ 2 300 h; converted at 105.144 INR/EUR (2026-11-09) · IN | |
Plant operator wage relative to the economy-wide average econ.operator_wage_ratio | 1 — | ASSUMPTION | MEDIUM | Plant operator ≈ economy-wide average (middle-income economy; no premium) · IN | |
Road transport of organic feedstock econ.transport_eur_tkm | 0,064 EUR/(t·km) | CALCULATION | MEDIUM | 0.06 €/t·km vehicle & fuel + 0.003 × driver labour cost (€/h); matches KTBL slurry haulage ≈ 0.12–0.16 €/t·km in Germany · IN | |
Loading/unloading per tonne econ.transport_fixed_eur_t | 0,63 EUR/t | CALCULATION | MEDIUM | 0.6 €/t pump & loader + 0.02 h/t × labour cost (KTBL Betriebsplanung machine-cost norms, scaled by national labour cost) · IN | |
Local CAPEX relative to the German baseline econ.capex_factor Equipment (CHP, upgrading, membranes, pumps) is internationally priced; civil works follow local costs | 0,78 — | CALCULATION | LOW | 0.72 traded equipment + 0.28 × local/German labour cost (1.3/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed · IN | |
chp: local CAPEX factor econ.capex_factor_chp Route-specific factor; reconstructed project costs are not independently validated quotations | 0,78 — | CALCULATION | LOW | 0.72 traded equipment + 0.28 × local/German labour cost (1.3/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed · IN | |
boiler: local CAPEX factor econ.capex_factor_boiler Route-specific factor; reconstructed project costs are not independently validated quotations | 0,78 — | CALCULATION | LOW | 0.72 traded equipment + 0.28 × local/German labour cost (1.3/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed · IN | |
biomethane: local CAPEX factor econ.capex_factor_biomethane Route-specific factor; reconstructed project costs are not independently validated quotations | 0,55 — | CALCULATION | LOW | biomethane only. SATAT CBG plant, Bagalkot (Karnataka): ₹ 42 crore for 10.2 t/day CBG from 200 t/day press mud ≈ 1 000 Nm³/h raw biogas → ≈ €4.3 M vs ≈ €8 M for the same plant at German prices; Indian-made digesters and upgrading. Single project — check against SATAT tenders · IN | |
Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk) econ.discount_rate | 0,076 — | CALCULATION | MEDIUM | Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 2.72 % (Baa3; Damodaran, 2026-07); not a bank offer · IN | |
Annual escalation of energy prices (nominal EUR) econ.energy_escalation | 0,02 — | ASSUMPTION | MEDIUM | At the ECB/Fed inflation target — no real energy-price growth assumed (conservative) · IN | |
Annual escalation of operating costs (nominal EUR) econ.opex_escalation | 0,025 — | ASSUMPTION | MEDIUM | Inflation target + 0.5 pp wage drift · IN | |
Evaluation horizon econ.horizon_years | 15 a | ASSUMPTION | MEDIUM | Shorter than the 20-year technical life — conservative · IN | |
Debt share for DSCR test econ.debt_share | 0,5 — | ASSUMPTION | MEDIUM | Typical agri / project lending (KfW, EBRD, IFC practice) · IN | |
Debt interest rate (EUR-equivalent) econ.debt_interest | 0,061 — | CALCULATION | MEDIUM | Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this · IN | |
Debt tenor econ.debt_tenor_years | 7 a | ASSUMPTION | MEDIUM | Typical · IN | |
Mineral nitrogen price econ.fert_n_eur_kg | 0,59855878 EUR/kg N | CALCULATION | MEDIUM | World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup × 0.45 national factor · IN | |
Mineral phosphorus price econ.fert_p2o5_eur_kg | 0,75489436 EUR/kg P₂O₅ | CALCULATION | MEDIUM | World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup × 0.45 national factor · IN | |
Mineral potassium price econ.fert_k2o_eur_kg | 0,34247521 EUR/kg K₂O | CALCULATION | MEDIUM | World Bank Pink Sheet, 12-month mean 2025M10–2026M09; ÷ nutrient share × 1.35 farm-gate markup × 0.45 national factor · IN | |
Incremental digestate handling on adequate land econ.digestate_handling_eur_t | 1,3 EUR/t | CALCULATION | MEDIUM | Pumping & trailing-hose spreading ≈ 1.2 €/t machinery + 0.08 h/t × labour; ≈ 4.8 €/t in Germany, in line with KTBL contractor rates (3–6 €/m³) · IN | |
Digestate that has no adequate land econ.digestate_excess_eur_t | 2,79 EUR/t | CALCULATION | MEDIUM | Third-party export of digestate ≈ 2.5 €/t + 0.22 h/t × labour; ≈ 12 €/t in Germany, in line with manure-exchange prices in surplus regions (LWK Niedersachsen Nährstoffbericht: 10–20 €/t) · IN | |
Grid emission factor econ.grid_ef_t_mwh | 0,67 tCO₂/MWh | FACT | HIGH | Ember via Our World in Data, carbon intensity of electricity generation (lifecycle-free, gCO2/kWh), 2025 · IN |
Scenariji 36
Scenariji: konzervativni, osnovni i optimistični, osam stres testova i zaseban proračun za svaki program podrške.
| Parametar | Vrednost | Tip | Pouzdanost | Izvor | Datum |
|---|---|---|---|---|---|
Conservative: yieldBlend scn.conservative.yieldBlend | -0,5 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: processRealisation scn.conservative.processRealisation | 0,95 — | ASSUMPTION | MEDIUM | Catalogue yields are KTBL/FNR standard yields, already full-scale values (base 1.0, conservative 0.95). Checked 2026-11-03: FNR Biogas-Messprogramm III, 39 German plants, model ÷ measured methane median 0.87; Swedish farm plants (SCB 2024) 0.86; EPA AgSTAR 79 US digesters median ≈ 1.04 · GLOBAL | |
Conservative: capexMult scn.conservative.capexMult | 1,2 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: opexMult scn.conservative.opexMult | 1,15 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: energyPriceMult scn.conservative.energyPriceMult | 0,85 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: heatUtilisation scn.conservative.heatUtilisation | 0,6 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: chpHours scn.conservative.chpHours | 7.200 h/a × eng.plant_availability ÷ 0.89 | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: leakShare scn.conservative.leakShare | 0,03 of CH₄ production | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: digestateValueFactor scn.conservative.digestateValueFactor | 0,5 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: disposalRealisation scn.conservative.disposalRealisation | 0,8 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: feedstockAvailability scn.conservative.feedstockAvailability | 0,9 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Conservative: ensilingLoss scn.conservative.ensilingLoss | 0,12 of DM | ASSUMPTION | MEDIUM | KTBL, Ernte- und Silomanagement, 2021, Tab. 1: bunker silo DM loss 8 % unavoidable (Köhler et al. 2013), 9.3 % with average and 12 % with poor compaction · GLOBAL | |
Base: yieldBlend scn.base.yieldBlend | 0 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: processRealisation scn.base.processRealisation | 1 — | ASSUMPTION | MEDIUM | Catalogue yields are KTBL/FNR standard yields, already full-scale values (base 1.0, conservative 0.95). Checked 2026-11-03: FNR Biogas-Messprogramm III, 39 German plants, model ÷ measured methane median 0.87; Swedish farm plants (SCB 2024) 0.86; EPA AgSTAR 79 US digesters median ≈ 1.04 · GLOBAL | |
Base: capexMult scn.base.capexMult | 1 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: opexMult scn.base.opexMult | 1 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: energyPriceMult scn.base.energyPriceMult | 1 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: heatUtilisation scn.base.heatUtilisation | 0,8 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: chpHours scn.base.chpHours | 7.800 h/a × eng.plant_availability ÷ 0.89 | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: leakShare scn.base.leakShare | 0,015 of CH₄ production | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: digestateValueFactor scn.base.digestateValueFactor | 0,7 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: disposalRealisation scn.base.disposalRealisation | 0,95 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: feedstockAvailability scn.base.feedstockAvailability | 1 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Base: ensilingLoss scn.base.ensilingLoss | 0,093 of DM | ASSUMPTION | MEDIUM | KTBL, Ernte- und Silomanagement, 2021, Tab. 1: bunker silo DM loss 8 % unavoidable (Köhler et al. 2013), 9.3 % with average and 12 % with poor compaction · GLOBAL | |
Optimistic: yieldBlend scn.optimistic.yieldBlend | 0,5 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: processRealisation scn.optimistic.processRealisation | 1 — | ASSUMPTION | MEDIUM | Catalogue yields are KTBL/FNR standard yields, already full-scale values (base 1.0, conservative 0.95). Checked 2026-11-03: FNR Biogas-Messprogramm III, 39 German plants, model ÷ measured methane median 0.87; Swedish farm plants (SCB 2024) 0.86; EPA AgSTAR 79 US digesters median ≈ 1.04 · GLOBAL | |
Optimistic: capexMult scn.optimistic.capexMult | 0,9 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: opexMult scn.optimistic.opexMult | 0,95 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: energyPriceMult scn.optimistic.energyPriceMult | 1,1 × | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: heatUtilisation scn.optimistic.heatUtilisation | 0,95 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: chpHours scn.optimistic.chpHours | 8.200 h/a × eng.plant_availability ÷ 0.89 | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: leakShare scn.optimistic.leakShare | 0,005 of CH₄ production | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: digestateValueFactor scn.optimistic.digestateValueFactor | 0,85 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: disposalRealisation scn.optimistic.disposalRealisation | 1 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: feedstockAvailability scn.optimistic.feedstockAvailability | 1 — | ASSUMPTION | LOW | Project-team scenario design; spread intentionally wider than expected error · GLOBAL | |
Optimistic: ensilingLoss scn.optimistic.ensilingLoss | 0,08 of DM | ASSUMPTION | MEDIUM | KTBL, Ernte- und Silomanagement, 2021, Tab. 1: bunker silo DM loss 8 % unavoidable (Köhler et al. 2013), 9.3 % with average and 12 % with poor compaction · GLOBAL |