- Biomethane price without support, base: 0,2239 USD/Nm³ · CALCULATED_VALUE · LOW
- National estimate (project team, 2026-10) — no official series found for this item; your own price overrides it; local market for biomethane / RNG without credits
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- boiler: local CAPEX factor: 1,06 — · CALCULATED_VALUE · LOW
- 0.72 traded equipment + 0.28 × local/German labour cost (38.4/31.5 €/h); split after DBFZ/Fraunhofer 2024; supplier quotes needed
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Debt interest rate (EUR-equivalent): 0,046 — · CALCULATED_VALUE · MEDIUM
- Discount rate − 1.5 pp (senior debt is cheaper than blended project capital); consistent with ECB MIR corporate loan rates + project margin; a bank term sheet replaces this
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Debt share for DSCR test: 0,65 — · ENGINEERING_ASSUMPTION · MEDIUM
- Typical agri / project lending (KfW, EBRD, IFC practice)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Debt tenor: 10 a · ENGINEERING_ASSUMPTION · MEDIUM
- Typical
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Discount rate (nominal, pre-tax, EUR-equivalent, incl. country risk): 0,061 — · CALCULATED_VALUE · MEDIUM
- Nominal, pre-tax, EUR-equivalent: 6.0 % mature-market WACC + 0.6 × country risk premium 0.22 % (Aa1; Damodaran, 2026-07); not a bank offer
- 2026-07-01 · checked 2026-10-27 · Rating-based CRP; baseline WACC and lambda are engineering/financial assumptions
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Business electricity reference, excl. VAT (default if the customer gives none): 0,1167 USD/kWh · CALCULATED_VALUE · MEDIUM
- EIA Electric Power Monthly 5.6.B, Wisconsin, 2026-01/2026-08: commercial 13.73 ¢, industrial 9.60 ¢/kWh → midpoint for farms and food processors, excl. taxes; converted at 1.1193 USD/EUR
- 2026-01/2026-08 · checked 2026-10-31 · Wisconsin; sector averages, not the customer's tariff
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Wholesale electricity price (market average): 0,05264 USD/kWh · CALCULATED_VALUE · MEDIUM
- EIA STEO table 7a: Midcontinent ISO Illinois hub, 2025-10 – 2026-09 mean $52.64/MWh (hub serving Wisconsin); converted at 1.1193 USD/EUR
- 2025-10-01 / 2026-09-30 · checked 2026-10-31 · Wholesale hub assigned to Wisconsin; not a guaranteed export price
- WITHIN_REVIEW_WINDOW: Within the 60-day review policy; applicability and latest publication must still be checked
- Annual escalation of energy prices (nominal EUR): 0,02 — · ENGINEERING_ASSUMPTION · MEDIUM
- At the ECB/Fed inflation target — no real energy-price growth assumed (conservative)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Share of the wholesale price realised for surplus power: 0,85 — · ENGINEERING_ASSUMPTION · MEDIUM
- 15 % profile & balancing discount for a small seller (assumption, same for all markets)
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Exchange rate: 1,119 USD/EUR · MARKET_DATA · HIGH
- Official EUR reference rate, 2026-11-09
- 2026-11-09 · checked 2026-11-10 · USD per EUR; dated reference, not a guaranteed transaction rate
- WITHIN_REVIEW_WINDOW: Within the 7-day review policy; applicability and latest publication must still be checked
- Value of useful heat (displaced gas / boiler efficiency): 0,02768 USD/kWh th · CALCULATED_VALUE · MEDIUM
- Business gas 22.257518091664434 €/MWh LHV ÷ 0.9
- 2025-09 / 2026-08 · checked 2026-10-31 · Wisconsin
- WITHIN_REVIEW_WINDOW: Within the 400-day review policy; applicability and latest publication must still be checked
- Evaluation horizon: 15 a · ENGINEERING_ASSUMPTION · MEDIUM
- Shorter than the 20-year technical life — conservative
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Official hourly labour cost, economy-wide (wages + employer costs): 46,89 USD/h · CALCULATED_VALUE · HIGH
- BLS Employer Costs for Employee Compensation, private industry, 2026-Q02: $46.89 per hour worked; converted at 1.1193 USD/EUR
- WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
- Plant operator wage relative to the economy-wide average: 0,9385 — · CALCULATED_VALUE · MEDIUM
- BLS OEWS May 2025, water & wastewater treatment plant operators, Wisconsin: mean $30.8/h ÷ ECEC private-industry wages $32.82/h (2026-Q02)
- May 2025 · checked 2026-10-31 · Wisconsin
- WITHIN_REVIEW_WINDOW: Within the 730-day review policy; applicability and latest publication must still be checked
- Annual escalation of operating costs (nominal EUR): 0,025 — · ENGINEERING_ASSUMPTION · MEDIUM
- Inflation target + 0.5 pp wage drift
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity
- Share of the bill actually avoided by self-generation: 0,85 — · ENGINEERING_ASSUMPTION · MEDIUM
- TOU reference: energy/Ft portion only, demand/service charges retained. Else 85% engineering allowance. User invoice uses the generic allowance until its energy/demand split is known.
- ASSUMPTION: Engineering estimate or reconstructed cost; a recent review date does not establish current market validity